← Back to search

M50/N7 Red Cow Roundabout with entrance from Holly Road

Granted

Planning application S00A/0037

Dublin - South Dublin County Council

Proposed Development

Proposed new business park development consisting of 3 levels of parking (21,673 m.sq.), 2 main blocks, of 5 storeys and 6 storeys of office space (29,968 m.sq.) with landscaped internal courtyards and roofscape, linked together with a central circulation tower housing cafe/ restaurant and creche to facilitate the office based industries ie. data processing, software development, information technology, technical and consulting, commercial laboratories/healthcare, research and development, publishing and telemarketing, with ancillary site development work, landscaping, new boundaries and entrance road from Holly Road.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Jun 2000

  2. Further information received

    1 Jun 2000

  3. Decision due

    27 Jul 2000

  4. Decision: Grant Permission

    31 Jul 2000

  5. Appeal submitted

    30 Aug 2000

  6. Appeal decided: Appeal Withdrawn

    17 Aug 2001

  7. Grant issued

    7 Sept 2001

Application Details

Location
M50/N7 Red Cow Roundabout with entrance from Holly Road.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
19344 ha
Floor Area
51641 sq m

Timeline

Registration Date
1 June 2000
Status
Appeal decided
Decision
Grant Permission
Decision Date
31 July 2000
Grant Date
7 September 2001
Permission Expires
30 June 2001

An Coimisiún Pleanála Appeal

Appeal Reference
06S.121085
Status
Appeal decided
Decision
Appeal Withdrawn
Submitted
30 August 2000
Decided
17 August 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

91m
ED09/0016Declared Exempt12 Jun 2009

The site is approximately 1.5 acres and is fully concreted and consists of three permanent structures which include the depolluting bay (area where potentially polluting materials are removed), a small garage and a spare parts store (all indicated on Figure 1 attached). The depolluting bay is a single story building with steel and concrete frame and galvanised roofing. The garage and spare parts store are small single storey structures with a galvanised frame construction. The remaining structures include three portacabins housing offices and a parts shop and 5 mobile containers housing spare parts. The site currently operates as an authorised treatments facility for the dismantling, recovery and depollution of End of Life Vehicles (ELV's) under its Waste Permit (Registration Number WPR 006/2). Westlink operates three collection trucks collecting ELV'S from the general public in the surrounding South Dublin region. The company also hold a contract from Dunlaoighre Rathdown County Council for the removal of ELV'S from the travelling community. The general public can also deposit cars at the site free of charge. On arrival at the site Elv's are examined and inspected to ensure only material that are permitted are accepted on site. ELV'S are then stored on paved areas awaiting the depollution process. The depollution process involves a number of below and above vehicle operations in order to remove all materials that could pose a threat to the enviroment on crushing of the car. These materials include all fluids, lean-acid batteries, filters tyres, air conditioning systems, air bags and catalysts. After the depollution process ELV's are crushed and baled by a baler machine. The baled cars are sent to appropriately licenced facilities for further processing. All other wastes removed from the ELV's are stored on site in appropriate containers and removed offsite by permitted waste contractors for further treatment and disposal.

Westlink Recovery Services Limited, Red Cow, Naas Road, Dublin 22

113m
SD15A/0314Refused21 Oct 2015

68 no. 20 foot storage containers and 9 no. 40 foot storage containers, 1 no. 10 foot office unit & toilet. In addition, the development proposes to include the provision of vehicle storage area along western boundary of the subject site to accommodate 26 parking spaces. Works will also comprise of landscaping to the boundary of the site and modifications to the existing entrance. This development is for a period of 5 years for the use of the subject site as a self service storage facility.

The Yard, Red Cow, Naas Road, Clondalkin, Dublin 22

121m
S99A/0235Refused16 Apr 1999

Sign in centre of Naas Road.

Red Cow, Naas Road, Clondalkin, Dublin 22.

127m
SD08A/0003Grant Permission for Retention2 Jan 2008

Part change of use from warehouse to showroom at ground floor level to office accommodation at mezzanine floor above & associated works.

260, Holly Road, Western Industrial Estate, Dublin 12

133m
SD04A/0766Granted13 Oct 2004

Alterations to existing front boundary fence to provide two gates for additional vehicular access.

Unit 260, Holly Road, Western Industrial Estate, Dublin 12

133m
SD04A/0726Granted30 Sept 2004

Sub-division of existing warehouse unit into four individual warehousing units with alterations to existing internal layout and alterations to the existing external elevations and inclusion of dock levellers and associated site works.

Unit 26, Holly Road, Western Industrial Estate, Dublin 12

133m
SD04A/0681Invalid - Site Notice9 Sept 2004

Alterations to existing front boundary fence to provide two gates for additional vehicular access.

Unit 260, Holly Road, Western Industrial Estate, Dublin 12

135m
SD17A/0408Granted16 Nov 2017

The erection of a palisade fence on a 450mm height concrete plinth (total height = 2400mm) along the east side of the property, 1000mm inside the boundary line, with an electric fence (total height = 4000mm). Electric fence fixed to internal leaf of palisade fence. (1) The erection of an electric fence (total height = 4000mm) along the south side of the property, fixed to internal leaf of existing palisade fence (total height = 4000mm). The existing palisade fence is erected approximately 2000mm inside the boundary line. (2) The erection of an electric fence (total height = 4000mm) along part of the west side of the property, fixed to internal leaf of existing palisade fence (total height = 4000mm). (3) The erection of a palisade fence on a concrete plinth (total height - 2400mm) along the north side of the existing building, 1800mm in front of the building along which will incorporate 6 pedestrian turnstiles for pedestrian access and egress. (4) Replacement of 2 existing double leaf palisade gates with 4 sliding gates along the north elevation, at each end of the building. (5) The modification to the south elevation of the building to create 8 security vehicle access traps as per drawing. (6) The modification of the east elevation of the building, removal of 3 roller shutters and replacement with 5 windows at ground floor level. (7) 2 new escape doors to the south elevation. (8) Installation of 3 new windows at ground floor level on the south elevation at the south east corner. (9) Associated internal fit-out and security works. (10) Associated works. Note: The non-lethal, pulsed monitored electric fence is a deterrent to intrusion, fixed to internal leaf of each palisade fence with interim control system and warning signs every 10 metres or less and clear demarcation zone internally.

260, Holly Road, Western Industrial Estate, Dublin 12

142m
SD25A/0302WCAI Received10 Aug 2026

Proposed extension to an existing warehouse development; consisting of the addition of 398sqm warehousing area being added to the Western elevation of the existing warehouse in a current disused yard area. The extended portion will have a clear internal height of 8m and a maximum external height of 9m, adjoining the existing building which has a maximum height of 6,85m. The existing building otherwise remains unaltered due to the addition of the side extension, including existing access and carparking arrangements.

Unit 270, Holly Road, Western Industrial Estate, Co. Dublin

144m
SD09A/0077Granted25 Feb 2009

Construct a second vehicular entrance.

270, Holly Road, Western Industrial Estate, Dublin 12

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?