68 no. 20 foot storage containers and 9 no. 40 foot storage containers, 1 no. 10 foot office unit & toilet. In addition, the development proposes to include the provision of vehicle storage area along western boundary of the subject site to accommodate 26 parking spaces. Works will also comprise of landscaping to the boundary of the site and modifications to the existing entrance. This development is for a period of 5 years for the use of the subject site as a self service storage facility.
View the full application file on the council's planning portal →Application Timeline
Application received
21 Oct 2015
Decision: Refuse Permission
11 Dec 2015
Decision due
15 Dec 2015
Application Details
- Location
- The Yard, Red Cow, Naas Road, Clondalkin, Dublin 22
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 4403 ha
- Floor Area
- 1197.98 sq m
Timeline
- Registration Date
- 21 October 2015
- Status
- Decision
- Decision
- Refuse Permission
- Decision Date
- 11 December 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The site is approximately 1.5 acres and is fully concreted and consists of three permanent structures which include the depolluting bay (area where potentially polluting materials are removed), a small garage and a spare parts store (all indicated on Figure 1 attached). The depolluting bay is a single story building with steel and concrete frame and galvanised roofing. The garage and spare parts store are small single storey structures with a galvanised frame construction. The remaining structures include three portacabins housing offices and a parts shop and 5 mobile containers housing spare parts. The site currently operates as an authorised treatments facility for the dismantling, recovery and depollution of End of Life Vehicles (ELV's) under its Waste Permit (Registration Number WPR 006/2). Westlink operates three collection trucks collecting ELV'S from the general public in the surrounding South Dublin region. The company also hold a contract from Dunlaoighre Rathdown County Council for the removal of ELV'S from the travelling community. The general public can also deposit cars at the site free of charge. On arrival at the site Elv's are examined and inspected to ensure only material that are permitted are accepted on site. ELV'S are then stored on paved areas awaiting the depollution process. The depollution process involves a number of below and above vehicle operations in order to remove all materials that could pose a threat to the enviroment on crushing of the car. These materials include all fluids, lean-acid batteries, filters tyres, air conditioning systems, air bags and catalysts. After the depollution process ELV's are crushed and baled by a baler machine. The baled cars are sent to appropriately licenced facilities for further processing. All other wastes removed from the ELV's are stored on site in appropriate containers and removed offsite by permitted waste contractors for further treatment and disposal.
Westlink Recovery Services Limited, Red Cow, Naas Road, Dublin 22
Proposed new business park development consisting of 3 levels of parking (21,673 m.sq.), 2 main blocks, of 5 storeys and 6 storeys of office space (29,968 m.sq.) with landscaped internal courtyards and roofscape, linked together with a central circulation tower housing cafe/ restaurant and creche to facilitate the office based industries ie. data processing, software development, information technology, technical and consulting, commercial laboratories/healthcare, research and development, publishing and telemarketing, with ancillary site development work, landscaping, new boundaries and entrance road from Holly Road.
M50/N7 Red Cow Roundabout with entrance from Holly Road.
2 storey conservatory extension. Extensions to and raising existing roof over first floor function room and alterations to elevations.
Red Cow Inn, Redcow, Naas Road, Dublin 22.
Sign in centre of Naas Road.
Red Cow, Naas Road, Clondalkin, Dublin 22.
Extensions and alterations to existing public house, restaurant, function room and nightclub following approved permission (SD05A/0799). The proposed extensions will provide new storage and ancillary accommodation to basement, extension of nightclub at ground floor, new offices and storage at first floor, elevational treatment and associated signage.
Red Cow Inn, Red Cow Complex, Naas Road, Clondalkin, Dublin 22.
Extensions and alterations to existing Public House, Restaurant, Function room and Nightclub: the proposed extensions at basement, ground, first and second floor level will provide for 2 No. accommodation staircases, offices, staff changing facilities, customer toilet facilities, external terraces and additional storage areas; the proposed alterations will include for demolition of existing conservatory, replacement and realignment of existing function room roof, elevational changes including remodelling of existing entrance lobbies and provision of additional signage and fixed glazed canopies; also revised external hard landscaping treatment and all associated site works.
Red Cow Inn, Red Cow Complex, Naas Road, Clondalkin, Dublin 22
Construction of a new hotel wing comprising 5 storeys (c.5340sq.m total GFA) and containing 104 bedrooms, meeting rooms, lounge area, link to existing hotel, and plant area (c.40sq.m); modifications to existing hotel comprising demolition of c.2.5sq.m to accommodate new hotel link and change of use of hotel administration area to gym (c.73sq.m); demolition of existing 'Pavilion' building (c.2709sq.m); modification to hotel parking areas to now provide a total of 420 spaces (existing and new), with revisions to internal roads, set down areas, coach parking and delivery areas; closure of secondary entrance to Red Cow Business Park access road; all associated site development, landscaping, open spaces, boundary treatment works, car parking and infrastructural services provision.
Red Cow Complex, Naas Road, Dublin 22.
Provision of 2 addtional storeys above the permitted 5 storey extension and containing 52 additional hotel bedrooms; revisions to the permitted facade to accommodate the addtional floors; omission of permitted courtyard plant room; provision of new external courtyard plant room and plant storage area at basement; modifications to permitted ground floor link and provision of additional external walkway and balustrade; revisions to existing/permitted car park to now provide 412 spaces and associated landscape works; all associated site development, services provision. landscaping and associated works as permitted under Reg. Ref. SD15A/0138. The above revisions result in a net increase in gross floor area of c.2,376 sq.m.
Red Cow Complex, Naas Road, Dublin 22.
Change of use from offices and showrooms to boardrooms and administration offices with first floor storage over and also the retention of existing boardrooms.
The PMPA Building, Red Cow Complex, Naas Road, Dublin 22.
The proposed development will be carried out over 2 phases. Phase 1 will comprise the following: demolition of the existing Exhibition and Business Centre (c. 2,719sq.m. gross floor area (GFA) comprising business centre, exhibition room, warehouse and ancillary areas; existing Red Cow Hotel entrance lobby (c.44sq.m.); and existing substation (c. 40sq.m.); construction of a six storey (including roof level) car park building (c. 17,755sq.m. GFA excluding basement area) over semi-basement area) over semi-basement (c. 1,845sq.m. with 1,041 no. parking bays (44 of which are disabled parking), 70 no. bicycle parking spaces and ancillary areas; construction of a new 2 storey Nightclub building (c. 1,073 sq.m. GFA) adjacent to the existing Red Cow Inn building with dance areas, bars, east facing terraces and balcony (c. 121sq.m. total), goods delivery access at the east elevation and ancillary areas; construction of a new Hotel and Conference building within the existing surface car park area to the north of the existing Hotel building: this building comprises 17 storey (16 floors plus mezzanine floor) over basement at the western corner of the site, 6 storey over basement wing along Naas Road and a 2 storey over basement wing along Turnpike Road. The Phase 1 Hotel and Conference building will include: a Hotel Leisure Centre (c. 705 sq.m. GFA) at basement level with swimming pool, gym, saunas, steam room, treatment centre, changing rooms and shower areas; Conference Centre (c. 3,598sq.m. GFA) with main conference room (c. 1,505sq.m.), first floor gallery (c. 580sq.m.), foyer, bar areas, first floor south facing roof garden (c. 223sq.m.) ancillary areas; 10 no. Meeting Rooms with reception and ancillary areas at ground floor level (c. 581sq.m. GFA); Restaurant and Bar areas (c.1,377sq.m. GFA) comprising ground floor hotel bar (c.355sq.m. GFA) with west facing terrace (c.54sq.m.), 1st floor hotel restaurant (c. 556sq.m. GFA) with west facing terrace (c.25sq.m.) and public restaurants (c.466 sq.m. GFA) at 15th and 16th floors with south facing terrace (c.53sq.m.); Hotel Accommodation (c.9,856sq.m. GFA) comprising 310 no. hotel bedrooms (all en-suite) with 26 no. bedrooms at 1st floor level, 39 no. bedrooms at 2nd floor level, 44 no. bedrooms each at 3rd and 4th floor levels, 31 no. bedrooms at 5th floor level, and 14 no. bedrooms each at 6th to 14th floor levels. Ancillary developments as part of Phase 1 include the following: a covered walkway between the proposed car park and the main entrance to the new Hotel and Conference building; glazed canopy between the new and existing Hotel buildings; revised internal road layout; 14 no. taxi parking spaces; private coach set down areas; pedestrian crossing; landscaping and external lighting schemes. Phase 2 of the proposed development will comprise the following: demolition of the existing Red Cow Hotel building (c. 8,051sq.m. including basement) comprising 128 no. hotel bedrooms; restaurant and bar areas; conference/banquet suite; meeting rooms and ancillary areas; construction of an 8 storey over basement wing with single storey conference extension to the Phase 1 Hotel and Conference building and comprising the following: Conference Centre extension (c. 2,100sq.m. GFA) with second conference room (c. 1,302sq.m.), extended foyer and bar area and ancillary areas; a Business Centre (c.526sq.m. GFA) at ground floor level with 8 no. meetings, reception and ancillary areas; additional Hotel Accommodation (c.5,596sq.m. GFA) comprising 201 no. hotel bedrooms (all en-suite) with 31 no. bedrooms each at 1st floor to 5th floor levels and 23 no. bedrooms each at 6th and 7th floor levels. Ancillary developments as part of Phase 2 include the following: redesign of the covered walkway and glazed canopy; redesign of the internal road layout to include underpassing of the Phase 2 Hotel wing; redesign of the taxi parking areas and creation of an additional 2 no. parking spaces; alterations to Phase 1 landscaping scheme to include the creation of a Plaza; alterations to the external lighting scheme. Ancillary areas throughout the Phase 1 and 2 Hotel and Conference buildings include: Foyer and Lounge areas (c.939sq.m. GFA); Staff and Administration areas (c.657sq.m. GFA); and ancillary areas (kitchens, WCs, services, storage, plant, switch rooms, water storage, lifts, stairs, fire escapes, deliveries, goods handling, waste management and general circulation) (c.9,989sq.m. GFA). All ancillary site development works. Plant is located on the roof of the proposed Hotel and Conference building. The 1no. ESB substation proposed for demolition as part of Phase 1 will be replaced with 2 substations. The roof height above ground floor level of the overall proposed development will range from c.6.9 metres (nightclub) to c.55.5 metres (17 storey tall building element). the existing vehicular entrances to the site will be maintained with the Naas Road entrance to be used by incoming traffic only. The total proposed gross floor area for both phases including multi-storey Car Park but excluding basement areas is c.52,277sq.m. (total basement area is c7,423sq.m.). The total gross floor area of Phase 1 is c41,572sq.m. (total basement area is c.6,219sq.m.) and Phase 2 is c.10,705sq.m. (total basement area is c.1,204sq.m.). Overall Hotel Accommodation gross floor area (both phases) is c.15,452sq.m. with a total of 511 no. hotel bedrooms. The total gross floor area proposed for demolition (both phases) is c.10,854sq.m. The existing Red Cow Inn building (c.3,098sq.m.GFA) and existing uses will not be altered as part of this application. The planning application is accompanied by an Environmental Impact Statement (EIS).