← Back to search

DUB 9, Greenhills Road, Tallaght, Dublin 24

Grant Permission & Grant Retention

Planning application SD11A/0116

Dublin - South Dublin County Council

Proposed Development

Retention for Phase 1 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The works under Planning Retention will consist of the following: (1) Phase 1 demolition of existing asbestos roof and replacement with new roof cladding; (2) the demolition of an internal proportion of the existing building to allow for a new internal access road to the loading bay and future mechanical air handling equipment. (3) the demolition of an existing external lean-to pallet storage facility to the west face of the building; (4) demolition of a section of existing single storey auxiliary office building to the west. (5) Phase 1 internal works to the existing facility consist of 6 no. rooms for electrical and electronic operations, Loading Bay, Workshop, Offices and Staff Welfare area; (6) Phase 1 construction of a single storey security facility to the North elevation of the existing building; (7) Phase 1 construction of new external wall cladding to a proportion of the North and West elevation of the building; (8) Phase 1 screening to external mechanical air handling equipment and stand-by generator units; (9) auxiliary sprinkler and storage water tanks, pump house and provision for a new oil storage tank. Permission for Phase 2 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The proposed works under Planning Permission will consist of the following: (1) Phase 2 demolition of the existing asbestos roof and replacement with new roof cladding; (2) Phase 2 construction to complete new cladding to North, South, East and West elevations of the building; (3) Phase 2 construction of the plant screening to external Mechanical Air Handling and Stand-by Generator Units - the screen is to be constructed on the east, north, and west elevations of the facility; (4) Phase 2 internal works to the existing facility will consist of 24 no. rooms for electrical and electronic operations and Staff Welfare area.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 May 2011

  2. Decision due

    11 May 2011

  3. Decision: Grant Permission & Grant Retention

    24 Jun 2011

  4. Grant issued

    2 Aug 2011

Application Details

Location
DUB 9, Greenhills Road, Tallaght, Dublin 24
Applicant
N/A
Application Type
Permission and Retention
Planning Authority
South Dublin County Council
Site Area
51600 ha

Timeline

Registration Date
11 May 2011
Status
Decision
Decision
Grant Permission & Grant Retention
Decision Date
24 June 2011
Grant Date
2 August 2011

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD14A/0091Granted13 May 2014

Demolition of an existing single storey office building; construction of a new two storey extension (4,491sq.m.) to the existing DUB09 building for use as electrical rooms for electronic operations and mechanical plant rooms; works will include external roof top engineering plant with associated visual screening, revised levels of the existing site to facilitate the new extension and sundry associated works.

Existing Adsil Complex, Greenhills Road, Tallaght, Dublin 24.

0m
SD11A/0268Grant Permission & Grant Retention14 Nov 2011

Upgrade of existing boundary fencing/railings; revised site entrance locations and layouts; new security hut and upgrading of the site security system to include red-wall system, CCTV, public lighting poles and associated underground services. Retention of a temporary 10MVA ESB substation of 31sq.m. facing onto Greenhills Road.

DUB 9, Greenhills Road, Tallaght, Dublin 24

0m
SD16A/0402Granted22 Nov 2016

Construction of a new boundary railing to the main road frontage and an increase in height to the existing fencing on the east and west boundaries of the overall site.

DUB 9, Greenhills Road, Tallaght, Dublin 24

40m
ED16/0043Declared Not Exempt9 Aug 2016

(a) increase existing 2.4m high railings to front boundary to 3.1m high' (b) increase existing 2.4m high palisade fencing to East/West boundaries to 3.1m high. (Note: existing southern boundary to Bancroft Park is already 3m high).

Adsil, Dub 9, Greenhills Road, Tallaght, Dublin 24

115m
SD11A/0196Refused5 Apr 2012

(a) Demolish existing Units 1 & 2; (b) consturct a new purpose built multi cultural community centre over a new three storey building to include (i) ground floor: 8 classrooms, commercial kitchen, restaurant and takeaway, (ii) first floor: multi purpose hall, prayer room and library, (iii) second floor: offices and meeting room. Permission is also sought for a new bin bay compound with clock tower, site amendments and all associated site works.

Unit 1 & 2, Greenhills Business Centre, Greenhills Road, Tallaght, Dublin 24

123m
SD07A/1023Granted25 Feb 2008

Change of use of ground floor from industrial/warehouse in to restaurant and take away and new shop front and signage.

Unit 2, Greenhills Business Centre, Greenhills Road, Dublin 24

123m
SD07A/0810Invalid - Site Notice11 Oct 2007

Change of use of ground floor of unit no. 2 from industrial/warehouse into restaurant and take away and new shop front and signage.

Unit 2, Greenhills Business Centre, Dublin 24

124m
SD12A/0048Granted16 Mar 2012

Construct a new GIS (Gas Insulated Switchgear) 110kV electricity substation and to carry out ancillary site works: (1) all necessary site works for construction of a concrete compound area to the southwest of the existing ADSIL facility; (2) construction of an ESB GIS substation control building within the fenced compound area; (3) construction of a client control building and a transformer bay to house two transformers within the compound area; (4) construction of a 6m wide concrete access road within the perimeter of the site area; (5) installation of all substation apparatus within the compound area and buildings.

DUB 9, Greenhills Road, Tallaght, Dublin 24

124m
ED14/0029Declared Exempt12 Aug 2014

New 110kv cables to be connected to the existing building through new openings on the first floor. Supporting framework will carry the cables from the breakout point in the northern exterior wall into underground ducting within the ESB compound. These (exempted) cables will then continue underground to other ares within the Amazon complex.

Amazon Complex, Hibernian Insurance Industrial Estate, Greenhills Road, Tallaght, Dublin 24

142m
SD09A/0070Granted19 Feb 2009

Change of use from office & commercial unit to an Irish Muslim Centre including information office, Muslim cultural social event centre for education classes & pastel office at ground floor & prayer rooms, library & stores at first floor.

Unit 1 & 2, Greenhills Business Centre, Greenhills Road, Tallaght, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?
DUB 9, Greenhills Road, Tallaght, Dublin 24 - Planning Application SD11A/0116 | Permission.ie