Amazon Complex, Hibernian Insurance Industrial Estate, Greenhills Road, Tallaght, Dublin 24
Declared ExemptPlanning application ED14/0029
Dublin - South Dublin County Council
Proposed Development
New 110kv cables to be connected to the existing building through new openings on the first floor. Supporting framework will carry the cables from the breakout point in the northern exterior wall into underground ducting within the ESB compound. These (exempted) cables will then continue underground to other ares within the Amazon complex.
View the full application file on the council's planning portal →Application Timeline
Application received
12 Aug 2014
Decision: Declared Exempt
27 Aug 2014
Decision due
8 Sept 2014
Application Details
- Location
- Amazon Complex, Hibernian Insurance Industrial Estate, Greenhills Road, Tallaght, Dublin 24
- Applicant
- N/A
- Application Type
- Declaration of Exemption Sect. 5
- Planning Authority
- South Dublin County Council
- Site Area
- 78.1411539788443 ha
Timeline
- Registration Date
- 12 August 2014
- Status
- Officer Allocation
- Decision
- Declared Exempt
- Decision Date
- 27 August 2014
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct a new GIS (Gas Insulated Switchgear) 110kV electricity substation and to carry out ancillary site works: (1) all necessary site works for construction of a concrete compound area to the southwest of the existing ADSIL facility; (2) construction of an ESB GIS substation control building within the fenced compound area; (3) construction of a client control building and a transformer bay to house two transformers within the compound area; (4) construction of a 6m wide concrete access road within the perimeter of the site area; (5) installation of all substation apparatus within the compound area and buildings.
DUB 9, Greenhills Road, Tallaght, Dublin 24
Retention of change of use from manufacturing unit to wholesale and distribution unit with ancillary office and trade counter.
12, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24
Retention of change of use from manufacturing unit to wholesale and distribution unit with ancillary office and trade counter.
Unit 12, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24
Change of use
Unit 13, Hibernian Industrial Estate, Greenhills Road, Dublin 24
Demolition of an existing single storey office building; construction of a new two storey extension (4,491sq.m.) to the existing DUB09 building for use as electrical rooms for electronic operations and mechanical plant rooms; works will include external roof top engineering plant with associated visual screening, revised levels of the existing site to facilitate the new extension and sundry associated works.
Existing Adsil Complex, Greenhills Road, Tallaght, Dublin 24.
Upgrade of existing boundary fencing/railings; revised site entrance locations and layouts; new security hut and upgrading of the site security system to include red-wall system, CCTV, public lighting poles and associated underground services. Retention of a temporary 10MVA ESB substation of 31sq.m. facing onto Greenhills Road.
DUB 9, Greenhills Road, Tallaght, Dublin 24
Retention for Phase 1 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The works under Planning Retention will consist of the following: (1) Phase 1 demolition of existing asbestos roof and replacement with new roof cladding; (2) the demolition of an internal proportion of the existing building to allow for a new internal access road to the loading bay and future mechanical air handling equipment. (3) the demolition of an existing external lean-to pallet storage facility to the west face of the building; (4) demolition of a section of existing single storey auxiliary office building to the west. (5) Phase 1 internal works to the existing facility consist of 6 no. rooms for electrical and electronic operations, Loading Bay, Workshop, Offices and Staff Welfare area; (6) Phase 1 construction of a single storey security facility to the North elevation of the existing building; (7) Phase 1 construction of new external wall cladding to a proportion of the North and West elevation of the building; (8) Phase 1 screening to external mechanical air handling equipment and stand-by generator units; (9) auxiliary sprinkler and storage water tanks, pump house and provision for a new oil storage tank. Permission for Phase 2 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The proposed works under Planning Permission will consist of the following: (1) Phase 2 demolition of the existing asbestos roof and replacement with new roof cladding; (2) Phase 2 construction to complete new cladding to North, South, East and West elevations of the building; (3) Phase 2 construction of the plant screening to external Mechanical Air Handling and Stand-by Generator Units - the screen is to be constructed on the east, north, and west elevations of the facility; (4) Phase 2 internal works to the existing facility will consist of 24 no. rooms for electrical and electronic operations and Staff Welfare area.
DUB 9, Greenhills Road, Tallaght, Dublin 24
Construction of a new boundary railing to the main road frontage and an increase in height to the existing fencing on the east and west boundaries of the overall site.
DUB 9, Greenhills Road, Tallaght, Dublin 24
(a) increase existing 2.4m high railings to front boundary to 3.1m high' (b) increase existing 2.4m high palisade fencing to East/West boundaries to 3.1m high. (Note: existing southern boundary to Bancroft Park is already 3m high).
Adsil, Dub 9, Greenhills Road, Tallaght, Dublin 24
Sub division of existing warehouse into 3 units with new first floor to each unit, alterations to front and rear elevations, replacement of existing roof.
Unit 3, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24.