12, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24
Invalid - Site NoticePlanning application SD07A/0317
Dublin - South Dublin County Council
Proposed Development
Retention of change of use from manufacturing unit to wholesale and distribution unit with ancillary office and trade counter.
View the full application file on the council's planning portal →Application Timeline
Application received
1 May 2007
Decision: Invalid - Site Notice
8 Jun 2007
Decision due
24 Jun 2007
Application Details
- Location
- 12, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24
- Applicant
- N/A
- Application Type
- Retention
- Planning Authority
- South Dublin County Council
- Site Area
- 1580 ha
Timeline
- Registration Date
- 1 May 2007
- Status
- Decision
- Decision
- Invalid - Site Notice
- Decision Date
- 8 June 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of change of use from manufacturing unit to wholesale and distribution unit with ancillary office and trade counter.
Unit 12, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24
Change of use
Unit 13, Hibernian Industrial Estate, Greenhills Road, Dublin 24
New 110kv cables to be connected to the existing building through new openings on the first floor. Supporting framework will carry the cables from the breakout point in the northern exterior wall into underground ducting within the ESB compound. These (exempted) cables will then continue underground to other ares within the Amazon complex.
Amazon Complex, Hibernian Insurance Industrial Estate, Greenhills Road, Tallaght, Dublin 24
Alterations to an existing industrial warehouse which is to include: new Brise Soleil Louvres measuring a total of 33sq.m to existing windows to north facade; two no. new canopies measuring a total of 59sq.m over two no. existing loading bays to east facade and associated rain water drainage; two no. new canopies over existing side door to warehouse and existing office entrance to north facade measuring a total of 7sq.m; new programmable electronic signage and new internally illuminated signage as well as single non-illuminated sign measuring a total of 22sq.m to north facade to incorporate single tube feature neon light to north facade; three no. alternative fabric banners measuring a total of 11sq.m suspended from three no. new flag poles; four no. new mounting posts with CCTV cameras; new perimeter fence to be built over existing walls to west, north and east boundaries to incorporate: new car entrance to north boundary with associated new access ramp measuring 48sq.m. with associated new sliding gate, two no. new sliding gates to two no. existing entrances to east boundary, new hinged access gate to replace existing pedestrian access gate to west boundary and removal of existing pallisade fence between west facade and west boundary.
No., 16/17, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24
The development consists of the change of use of part of the existing ground floor office accommodation and secondary stores measuring approx. 80 m2 associated with the existing industrial warehouse building to form a retail unit related to the operation of the storage facility within the warehouse.
No. 16/17 Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24
Extension to the front and side of the existing storage warehouse building (314.00sqm) with ancillary office space and new exterior illuminated signage to front and side and ancillary site works.
17, Hibernian Estate, Tallaght, Dubin 24, D24 K163
Demolition of an existing link between warehouse/office Units14/15, dividing the connected units into two separate self-contained warehouse/office units, and to provide a new pedestrian entrance to the front of Unit 15.
Unit 14/15, Hibernian Industrial Estate, Greenhills Road, Dublin 24
Construct a new GIS (Gas Insulated Switchgear) 110kV electricity substation and to carry out ancillary site works: (1) all necessary site works for construction of a concrete compound area to the southwest of the existing ADSIL facility; (2) construction of an ESB GIS substation control building within the fenced compound area; (3) construction of a client control building and a transformer bay to house two transformers within the compound area; (4) construction of a 6m wide concrete access road within the perimeter of the site area; (5) installation of all substation apparatus within the compound area and buildings.
DUB 9, Greenhills Road, Tallaght, Dublin 24
New vehicular service yard entrance at side.
Unit 14, Hibernian Industrial Estate, Greenhills Road, Dublin 24
Change of use of premises from manufacturing (office furniture assembly) to wholesale and distribution with ancillary offices and trade counter (for building materials - plasterboard slabs etc).
Unit 2, Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin, 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?