Proposed Development
Development of a fuel service station at an industrial site of 0.562 hectares (1.39 acres) comprising : (i) A service station building with 330sq.m. gross floor area, comprising retail area (100sq.m.), a deli / seating area (100sq.m.), store rooms, offices, public and staff toilets (ii) a forecourt area with 5.4m high canopy over 8 no. fuel dispensing bays (iii) an ancillary structure for motor trade / transport related business with 168sq.m. gross floor area (iv) a car (brush) wash facility and associated wash recycling building (v) waste storage and recycling compound (vi) a new road junction and new 7m wide access road with 3m wide footpaths and 2.3m wide grass verge leading off Killeen Road (vii) a 6.5m high main identification sign at the junction of Killeen Road and the new access road (viii) 19 no. car parking bays (including 2 no. disabled parking bays), 2 no. separate car service bays and a bicycle parking area (ix) surface water management system, including sub-surface drains, rainwater harvesting system, 150m3 underground attenuation tank, Class 1 interceptor tanks (underground) and connection to existing public storm water drainage system (x) foul water drains and connection to existing public sewer (xi) 40,000 litre underground tank farm and fuel off-loading area, including above ground offset filling points and vent outlets (xii) new 1.8m high boundary walls and new / replacement palisade fencing (xiii) boundary landscaping (xiv) pedestrian and cyclist access from Killeen Road.
View the full application file on the council's planning portal →Application Timeline
Further information requested
4 Dec 2012
Application received
16 May 2013
Further information received
16 May 2013
Decision: Grant Permission
11 Jun 2013
Decision due
12 Jun 2013
Grant issued
22 Jul 2013
Application Details
- Location
- Killeen Road, Dublin 12
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 5620 ha
- Floor Area
- 514 sq m
Timeline
- Registration Date
- 16 May 2013
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 11 June 2013
- Grant Date
- 22 July 2013
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alterations and improvements to the existing vehicular access to processing plant. These improvements include relocation of 1 no. pillar and the set back of the existing fenceline to the north of the existing entrance for a distance of approximately 155m.
Killeen Road, Ballyfermot, Dublin 12.
The demolition of the existing industrial warehouse structure; the construction of a replacement warehouse structure with signage (approx. 3,893sqm gross floor space) including ancillary office space; 44 no. car parking spaces; 1 no. totem sign (approx. 10m in height); security access gate on northern boundary; boundary treatment; landscape works; and all associated site developments all on a site area of approx. 0.914 hectares. The proposed replacement structure will rise to an overall height of approx. 19.3m. It is proposed to maintain vehicular access to the site via the existing site entrance.
Unit 4, John F. Kennedy Park, Killeen Road, Bluebell, Dublin 12
The demolition of the existing industrial warehouse structure; the construction of a replacement warehouse structure with signage (approx. 3,893sqm gross floor space) including ancillary office space; 44 no. car parking spaces; 1 no. totem sign (approx. 10m in height); security access gate on northern boundary; boundary treatment; landscape works; and all associated site developments all on a site area of approx. 0.914 hectares. The proposed replacement structure will rise to an overall height of approx. 19.3m. It is proposed to maintain vehicular access to the site via the existing site entrance.
Unit 4, John F. Kennedy Park, Killeen Road, Bluebell, Dublin 12
RETENTION: The development consists of retention permission for extension to existing mezzanine floor (30msq) to existing Unit No. 40, comprising of storage space, 1 no. office, workspace and tea station and all associated site works and services.
Unit 40, Canal Walk, Park West Business Park, Dublin 12, D12 W544
RETENTION: The development will consists of Retention Permission for extension to existing mezzanine floor (30msq) to existing Unit No.40, comprising of storage space, 1 no. office, workspace and tea station and all associated site works and services.
Unit 40, Canal Walk, Park West Business Park, Dublin 12, D12 W544
Site clearance works to include the partial demolition of an existing warehouse and associated buildings including ancillary office and outbuildings (c.6,835sq.m gfa in total) and plant including a water tank and pump house (135sq.m) on site and a temporary change of use of the site, for a period of 5 years, to car storage ancillary to the Killeen Motor Group. Associated site development works include the configuration of car storage bays to accommodate up to 567 new cars, internal marshalling yard and circulation, boundary treatment works, 18 new 6m high street lighting columns and associated signage. Vehicular access is via existing site entrance gates at Killeen Road.
The former Smurfit Kappa warehouse site, Killeen Road, Dublin 12
Two storey extension for industrial use with associated offices.
Unit B4, John F. Kennedy Business Park, Naas Road, Dublin 12
Retention of the internal first floor offices.
Unit B3, JFK Trading Centre, Naas Road, Dublin 12.
Construct a 198sq.m. extension (13.4m high) to side and raise the roof height of part of existing building from 8.3m to 13.4m.
Unit 1/2, JFK Park, Killeen Road, Dublin 12.
(1) Demolition/ removal of: an ESB substation (approx. 64sq.m); 2 sheds (approx.10sq.m each); cladding on northern, eastern and southern elevations and roof of the existing warehouse; the east boundary wall, fencing and entrance gates; and the south boundary wall towards the west corner site. (2) Alterations to the existing warehouse (approx. 1,242sq.m) with an overall height of approx. 13.3 ( 60.70m OD) to provide a service garage and associated ancillary elements (with overall area of approx. 1,492sq.m including internal plant), comprising: (a) external works including: recladding of north, south, east and west elevations of warehouse; provision of a new pitched roof with 9 west facing roof lights (there will be no change to the overall height of the existing warehouse); and provision of a vehicular service entrance, a pre-NCT service entrance , trade counter entrance, parts drop entrance and emergency exit, (b) internal alterations including: revised internal layout at ground floor level to provide a services garage workshop configuration, associated tool and waste storage areas, customer areas and associates ancillary office accommodation, (c) additional floor area: the internal works include new floor area at first floor level (approx. 250sq.m floor area including approx. 64sq.m internal plant area) to provide associated ancillary office accommodation and staff facilities. (3) The proposal also comprises: modification of existing vehicular entrance arrangements including the provision of a sliding gate (approx.8m wide) and an automatic barrier; reopening and modification of a disused entrance to provide a vehicle delivery entrance and gate (approx. 3m wide); provision of a fire escape access gate (approx. 1m wide) at the northern most end of the eastern boundary; revised boundary treatments (including a new eastern boundary wall with metal railing, a partial new southern & northern boundary wall and new concrete coping on the existing western boundary wall); provision of 12 parking spaces (customer, disabled & staff); 26 bays for service/loan vehicles; 2 vehicle charging points; 3 vehicle display podiums; bicycle parking; an enclosed waste compound; a valet compound ( including 2 covered vehicle wash bays and 2 enclosed valet bays); 1 double sided totem sign a the main vehicular entrance; 4 signs on southern façade of the service garage, within the forecourt and at the site boundaries; provision of landscaping treatments; new foul sewer arrangements (including a connection from the Killeen Road to the public network at the Nangor Road (also referred to as the New Nangor Road) and new surface water drainage arrangements including attenuation and a petrol/oil interceptor and all associated site development works.
The former Smurfit Kappa Warehouse Site, Kileen Road, Dublin 12.