← Back to search

Tallaght Village, Dublin 24

Part 8 Approved by Council

Planning application SD158/0001

Dublin - South Dublin County Council

Proposed Development

Alterations and improvements to paving, kerbing, parking trees, public lighting and bollards at the following locations: In front of the commercial premises along the West side of the Old Blessington Road from the junction with Main Street to the junction with High Street and along the old Greenhills Road from the junction with Main Street to the junction with the new Greenhills Road in Tallaght, Dublin 24. http://www.sdublincoco.ie/index.aspx?pageid=939&pid=31739 Works to include: - New paving layouts and upgraded kerbing, - New trees, public lights and bollards, - Revised on street car-parking spaces. These sites are within the Tallaght Architectural Conservation Area (Tallaght Village is a zone of Archeological Potential). Drawings of the proposed works will be on public display at the: South Dublin County Council, County Hall, Tallaght, Dublin 24 (between the hours of 9:00am – 5:00pm Monday to Thursday and 9.00am - 4.30pm on Friday) and on http://www.sdcc.ie/ during the period from 12th January 2015 to 23rd February 2015. Submissions or observations with respect to this matter dealing with the proper planning and sustainable development of the area in which the development would be situated may be made in writing to: The County Architect, Architectural Services Department, South Dublin County Council, County Hall, Tallaght, Dublin 24 The latest date for the receipt of submissions or observations is 5pm on Monday 9th March 2015.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Jan 2015

  2. Decision: Part 8 Approved by Council

    11 May 2015

Application Details

Location
Tallaght Village, Dublin 24
Applicant
N/A
Application Type
Application Under Part 8
Planning Authority
South Dublin County Council
Site Area
13026.882973903 ha

Timeline

Registration Date
12 January 2015
Status
Unregistered application
Decision
Part 8 Approved by Council
Decision Date
11 May 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

39m
ED11/0011Declared Exempt12 Apr 2011

Proposed maintenance works and fire upgrade

St. Mary's Dominican Priory, Main Street, Tallaght Village, Tallaght, Dublin 24 (Protected Structure)

44m
ED07/0020Declared Not Exempt12 Jul 2007

New Disabled Access Ramp & Railings at Main Entrance and Entrance to Administration Building.

St. Mary's Priory, Main Street, Tallaght, Dublin 24

62m
SD07A/0661Granted14 Aug 2007

Demolition of the existing steps at the main pedestrian entrance, and construction of new low gradient (1:20) ramp, with associated railings and fences. The ramp will be constructed of materials matching the existing; the construction of a new wheelchair ramp to the west of the existing entrance steps to the administration building with associated railing. The ramp will be constructed of materials matching the existing. The handrails will be of stainless steel. St. Mary's Priory is a Protected Structure.

St. Mary's Priory, Main Street, Tallaght, Dublin 24

65m
SD11A/0087Granted14 Apr 2011

(a) Demolition of an existing 4 storey open precast concrete fire escape stairs; (b) provision of a new 4 storey enclosed fire escape stairs with link connections to the main building as currently exist on first and second floor levels; (c) demolition of existing gate, pillars, low level wall & railing; (d) provision of new widened gate, pillars, low level wall and railings with pedestrian gate; (e) minor ancillary works (a Protected Structure).

St. Mary's Priory, Main Street, Tallaght, Dublin 24

68m
PT8SD349Unregistered application11 Feb 2026

Pursuant to the requirements of the above, South Dublin County Council hereby give notice to construct the following development in the Tallaght area of South Dublin, including Old Blessington Road, Old Bawn Road, Tallaght main street, old Greenhills road and Greenhills Road: The proposed development would consist of the following: • Upgrading and realignment of the existing footpath/walkway • Public realm improvement works in Tallaght Village; including traffic calming, provision of cycle facilities, footpath upgrade and realignment of road including reduced carriageway width and reduced corner radii and junction improvements (if required) • Provision of a pedestrian crossing on main street (location & design subject to consideration); • Provision of public lighting & CCTV (if required) • Enhancement/enlargement of public realm space • Additional pedestrian and cyclist connections • Efficient car park layouts that maximise functionality (caters for deliveries) • New entry detail on approaches to the village • Removal of street clutter and minimisation of signage • Landscape design that will increase trees, planting, SUDs and biodiversity • EV Charging options • Active Play & teen space with the focus on natural measures • Street Art • All ancillary works and other services The proposal has undergone Appropriate Assessment Screening under the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. The authority has concluded that there is no real likelihood of significant effects on the environment arising from the proposed development and a determination have been made that an Environmental Impact Assessment Report (EIAR) is not required. The authority has also made a determination under Article 6(3) that the proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s). Any person may, within 4 weeks from the date of publication of this notice, apply to An Coimisiún Pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment. Persons wishing to inspect drawings and particulars of the proposed development can do so as follows: ONLINE: Visit our Public Consultation Portal (http://consult.sdublincoco.ie) during the period 11th February 2026 to 25th March 2026 at 5pm. IN PERSON: Plans and particulars of the proposed development will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, at County Hall, Tallaght, Dublin 24 during office hours from 11th March 2026 to 13th March 2026. Submissions and observations with respect to the proposed development dealing with the proper planning and sustainable development of the area in which the proposed development will be situated, may be made in writing up to 5.00pm on 25th March 2026 and may be submitted: • Online: https://consult.sdublincoco.ie/en/consultation/tallaght-village-enhancement-scheme-0 • In writing: Post to Senior Executive Officer, Planning and Transport, South Dublin County Council, County Hall, Tallaght, Dublin D24 A3XC. NOTE: Please make your submission by one medium only. All submissions should include your name and a contact address. It should be noted that the Freedom of Information Act, 1997 (as amended) applies to all records held by South Dublin County Council. South Dublin County Council's Personal Data Privacy Statements can be viewed at www.sdcc.ie and all personal data will be retained in line with statutory requirements. Director of Planning and Transport, South Dublin County Council. Date of Public Notice: 11th February 2026

Tallaght Village Enhancement Scheme, Dublin 24.

87m
SD14A/0230Granted3 Nov 2014

Change of use of existing two storey terrace office block into residential dwelling.

4, Main Street, Tallaght, Dublin 24

93m
SD09A/0225Refused27 May 2009

Change of use of ground floor level from a funeral booking office to a funeral home with a room for viewing remains.

3, Main Street, Tallaght, Dublin 24

93m
S00A/0342Refused31 Jul 2000

Extension to premises at rere and internal alterations.

3 Main Street, Tallaght, Dublin 24.

93m
SD098/0004Part 8 Approved by Council31 Aug 2009

Material alteration and extension of office of Tallaght Welfare Society including moving main entrance/reception from no. 1 to no.2, the permanent combination of no’s 1 & 2 by removal of individual stairs, demolition of 8sqm kitchen extension and addition of a 67sqm two storey extension, addition of 2 no. windows to existing extension, and the provision of a ramp to front of no 2 for equal access. Drawings of the proposed extension will be on public display at the Headquarters of South Dublin County Council, County Hall, Tallaght, Dublin 24, on http://www.sdcc.ie/ and at Tallaght Welfare Society Offices, 1 – 2 Main Street, Tallaght, during normal working hours in the period from 27th August 2009 to 7th October 2009. Submissions or observations with respect to this matter dealing with the proper planning and sustainable development of the area in which the development would be situated may be made in writing to; The Senior Executive Officer, Development Department, South Dublin County Council, County Hall, Tallaght, Dublin 24. The latest date for the receipt of submissions or observations is 4.30pm on Thursday 21st October 2009.

1 & 2, Main Street, Tallaght, Dublin 24

93m
SD03B/0014Grant Permission for Retention16 Jan 2003

3 Dormer windows at roof level.

(Land At Junction Of Greenhills Rd. & Main St.), Greenhills Road, Tallaght Village, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?