← Back to search

Unit 6A, Westgate Business Park, Ballymount Road Upper, Dublin 24

Granted

Planning application SD18A/0183

Dublin - South Dublin County Council

Proposed Development

Construction of a single storey sprinkler pump house of 58sq.m, a 7.15m high 173m3 capacity sprinkler water storage tank and associated works, to the rear of an existing light industrial facility. This application relates to a development which comprises or is for the purposes of an activity requiring a Waste Licence.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 May 2018

  2. Decision: Grant Permission

    16 Jul 2018

  3. Decision due

    17 Jul 2018

  4. Grant issued

    27 Aug 2018

Application Details

Location
Unit 6A, Westgate Business Park, Ballymount Road Upper, Dublin 24.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
2738 ha
Floor Area
58 sq m

Timeline

Registration Date
23 May 2018
Status
Decision
Decision
Grant Permission
Decision Date
16 July 2018
Grant Date
27 August 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
ED17/0013Declared Exempt25 Apr 2017

Change of use from light industrial warehousing to transfer, processing and storage of a waste paper stream (mainly confidential office waste paper- the major of this will be shredded off the site). The total annual tonnage will be c.7,000 tpa (c.583 tpm), which will involve some shredding,bailing and temporary storage of the processed paper bales prior to transfer to off-site reprocessing and recycling facilities. A limited and small amount of shredded computer hard drives will be stored on site approximately 1-2 tonnes per annum or between 50-100 hard drives per month on average. This material amounting to c.1x240 litre in volume (domestic wheelie bin) will be kept on site and transferred off-site to an appropriate facility for further treatment. Storage of all material will be kept to a minimum on site and processed paper on average will only be kept on site for 24-48hrs before onward transfer off site.

Unit 6A, Westgate Business Park, Ballymount, Dublin, 12

53m
SD11A/0223/EPGrant Extension of Duration of Permission3 Aug 2016

Change of use of 2286.7sq.m of existing logistics facility use to television studio with associated technical support facility and office use including: extension of the existing internal first floor area by 794.8sq.m; construction of a 15.65sq.m new main entrance lobby with canopy and signage to the west elevation; construction of new glazing at ground and first floor levels to the north elevation; construction of 2 glazed double doors to the east elevation; construction of new glazed entrance with canopy and ventilation louvers and removal of 2 single doors to the south elevation; ancillary site and landscaping works including the provision of 13 additional car park spaces to the east of the building with modifications to the rear service yard.

Unit 7, Westgate Business Park, Ballymount Road, Dublin 24

53m
SD11A/0223Granted19 Sept 2011

Change of use of 2286.7sq.m. of existing logistics facility use to television studio with associated technical support facility and office use including: extension of the existing internal first floor area by 794.8sq.m; construction of a 15.65sq.m. new main entrance lobby with canopy and signage to the west elevation; construction of new glazing at ground and first floor levels to the north elevation; construction of 2 no. glazed double doors to the east elevation; construction of new glazed entrance with canopy and ventilation louvers and removal of 2 no. single doors to the south elevation; ancillary site and landscaping works including the provision of 13 no. additional car park spaces to the east of the building with modifications to the rear service yard.

Unit 7, Westgate Business Park, Ballymount Road, Dublin 24

56m
SD20A/0159Granted6 Jul 2020

Erect 728.41sq.m of photovoltaic panels on the roof of existing building with all associated site works.

Unit 7, Westgate Business Park, Ballymount, Dublin 24

67m
SD20A/0160Granted6 Jul 2020

Erect 1,063.05sq.m of photovoltaic panels on the roof of existing building with all associated site works.

Unit 5, Westgate Business Park, Ballymount, Dublin 24

76m
S00A/0714Granted13 Oct 2000

to construct block for office based industry at rear of approved development ( Ref. S99A/0826).

4 & 5 Ballymount Road Upper, Dublin 24.

87m
S00A/0310Granted17 Aug 2000

Construct a lock-up workshop,(196 sq.m.).

Rear of 3 Ballymount Road Upper, Dublin 24.

87m
SD25A/0117Granted6 Oct 2025

To construct a new industrial building (412 msq) for maintenance of plant and machinery, with incorporated staff facilities, offices, meeting rooms and reception area along with a new connection to public sewers along with all associated services

Ballymount Road Upper, Dublin 24, D24 Y46R

107m
SD12A/0196Grant Permission & Grant Retention27 Feb 2013

Retention Permission for (a) site clearance (b) provision of hardcore hard stand area (c) parking of commercial vehicles. Permission for change of use of site nos. 4 & 5 Upper Ballymount Road from domestic to commercial transport depot incorporating 27 no. truck/trailer parking spaces, 12 no. car parking spaces, forklift shed, Kingspan bunded 44,000 litre fuel storage tank, wash bay, silt trap, oil, water separator with filtration system, 2 no. underground 20,000 litre rainwater harvesting tanks together with 7 no. 12.5m high lamp standards and security system; demolish house Nos. 4, 5 and 6 Upper Ballymount Road; close up existing domestic entrance to Nos. 4 & 5 Upper Ballymount Road; construct 1 no. emergency exit onto Upper Ballymount Road; connect surface water from sites 4 & 5 to mains surface water sewer; reconfigure entrance to site No. 3 Upper Ballymount Road to incorporate recessing boundary wall to the east of house No. 3 and the creation of entry and exit gates to site No. 3; modification to boundary wall of Nos. 3, 4 & 5 Upper Ballymount Road to include the provision of 3m high palisade security fencing on inner side of roadside wall; erection of 3m high palisade security fencing as permanent boundary between No. 5 and no. 6 Upper Ballymount Road; the erection of billboard type advertising signage and all associated site works.

Site Nos. 3, 4, 5 & 6, Upper Ballymount Road, Dublin 24.

109m
S98A/0782Granted22 Feb 1999

c.977 sq.m. detached light industrial/warehouse unit with ancillary offices and car parking.

Rear of no.6 Upper Ballymount Road, Tallaght, Dublin 24.