Unit 5, Westgate Business Park, Ballymount, Dublin 24
GrantedPlanning application SD20A/0160
Dublin - South Dublin County Council
Proposed Development
Erect 1,063.05sq.m of photovoltaic panels on the roof of existing building with all associated site works.
View the full application file on the council's planning portal →Application Timeline
Application received
6 Jul 2020
Decision due
31 Aug 2020
Decision: Grant Permission
31 Aug 2020
Grant issued
13 Oct 2020
Application Details
- Location
- Unit 5, Westgate Business Park, Ballymount, Dublin 24
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 1000 ha
- Floor Area
- 1063.05 sq m
Timeline
- Registration Date
- 6 July 2020
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 31 August 2020
- Grant Date
- 13 October 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a single storey sprinkler pump house of 58sq.m, a 7.15m high 173m3 capacity sprinkler water storage tank and associated works, to the rear of an existing light industrial facility. This application relates to a development which comprises or is for the purposes of an activity requiring a Waste Licence.
Unit 6A, Westgate Business Park, Ballymount Road Upper, Dublin 24.
Change of use from light industrial warehousing to transfer, processing and storage of a waste paper stream (mainly confidential office waste paper- the major of this will be shredded off the site). The total annual tonnage will be c.7,000 tpa (c.583 tpm), which will involve some shredding,bailing and temporary storage of the processed paper bales prior to transfer to off-site reprocessing and recycling facilities. A limited and small amount of shredded computer hard drives will be stored on site approximately 1-2 tonnes per annum or between 50-100 hard drives per month on average. This material amounting to c.1x240 litre in volume (domestic wheelie bin) will be kept on site and transferred off-site to an appropriate facility for further treatment. Storage of all material will be kept to a minimum on site and processed paper on average will only be kept on site for 24-48hrs before onward transfer off site.
Unit 6A, Westgate Business Park, Ballymount, Dublin, 12
Erection of an advertising / sign board (circa. 6m wide x 3m high with total area 18m sq.) and associated free standing 3no. vertical column support structure with platform (circa 10m high) with a total height of circa. 13m above ground level on site located to the east of Calmount Road and at North West corner of Honda Distribution centre site at M50 Business Park.
M50 Business Park, Ballymount Industrial Estate, Dublin 12
Construct a lock-up workshop,(196 sq.m.).
Rear of 3 Ballymount Road Upper, Dublin 24.
to construct block for office based industry at rear of approved development ( Ref. S99A/0826).
4 & 5 Ballymount Road Upper, Dublin 24.
Internal alterations to warehouse Unit 4 to retain the single storey, undivided warehouse area. Works include removal of first floor office space 220 sq. mts and internal partition walls.
Unit 4, Westgate Business Park, Ballymount Road Upper, Ballymount, Dublin 24
To construct a new industrial building (412 msq) for maintenance of plant and machinery, with incorporated staff facilities, offices, meeting rooms and reception area along with a new connection to public sewers along with all associated services
Ballymount Road Upper, Dublin 24, D24 Y46R
Modification of previously approved fencing (Ref No: SD14A/0229) along the northwest side of the property to include the erection of a palisade fence on a concrete plinth ( total height = 2400mm) inside the boundary line, with 1220mm high steel columns/bollards set inside part of the fencing, and with electric fence (total height = 4000mm) & 1220m high steel columns/bollards set inside the remaining part of the fencing. The erection of a palisade fence on a concrete plinth (total height = 2400mm) with electric fence (total height = 4000mm) & 1220mm high steel columns/bollards set inside the fencing, to the left of the northeast elevation of the existing building, and along the southeast, and southwest sides of the property. The section of fencing to the left of the northeast elevation of the existing building will incorporate 1 sliding gate including an automated opening and closing function. The erection of a projecting angled electric fence (total height = 1000mm) fixed to the face of all elevations of the existing building near the parapet along the perimeter of the roof. The erection of 4 steel columns (total height = 5000mm) to the roof of the existing building to supoort steel cables for the prevention of attack by helicopter. The construction of a 153.1sq.m single storey extension at the existing 2 vehicle access doors to southwest/rear of the building to create 2 vehicle security access traps. The parapet height of the extension will match the parapet height (7,890mm approximately) of the existing canopy covering the area outside the current vehicle access points. 3 bollards, that are electro-automated to retract into ground to be installed outside each of the 2 vehicle access traps. 1 new escape door to the northwest elevation. 1 new escape door to the southwest elevation. Associated works.
Unit 4, Westgate Business Park, Ballymount, Dublin 24
Erection of a palisade fence on a concrete plinth (total height 2400mm) along part of the northeast side of the property with 1 sliding gate including an automated opening and closing function; erection of a steel railing fence on a concrete plinth (total height 2400mm) along part of the northeast side of the property with 1 manually operated personnel gate including footpath to connect with the estate footpath; erection of a palisade fence on a concrete plinth (total height 2400mm) along the northwest side of the property; 1200mm high 150 x 150mm steel columns/bollards set inside the fencing; associated works.
Unit 4, Westgate Business Park, Ballymount Road, Ballymount, Dublin 24
Construction of 1,540sq.m approx. of additional hardstanding on northeast and southwest areas of the site for parking of cars and service vehicles; associated works.
Unit 4, Westgate Business Park, Ballymount, Dublin 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?