Planning application SD20A/0160

Dublin - South Dublin County Council

Proposed Development

Erect 1,063.05sq.m of photovoltaic panels on the roof of existing building with all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Jul 2020

  2. Decision due

    31 Aug 2020

  3. Decision: Grant Permission

    31 Aug 2020

  4. Grant issued

    13 Oct 2020

Application Details

Location
Unit 5, Westgate Business Park, Ballymount, Dublin 24
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
1000 ha
Floor Area
1063.05 sq m

Timeline

Registration Date
6 July 2020
Status
Decision
Decision
Grant Permission
Decision Date
31 August 2020
Grant Date
13 October 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

67m
SD18A/0183Granted23 May 2018

Construction of a single storey sprinkler pump house of 58sq.m, a 7.15m high 173m3 capacity sprinkler water storage tank and associated works, to the rear of an existing light industrial facility. This application relates to a development which comprises or is for the purposes of an activity requiring a Waste Licence.

Unit 6A, Westgate Business Park, Ballymount Road Upper, Dublin 24.

72m
ED17/0013Declared Exempt25 Apr 2017

Change of use from light industrial warehousing to transfer, processing and storage of a waste paper stream (mainly confidential office waste paper- the major of this will be shredded off the site). The total annual tonnage will be c.7,000 tpa (c.583 tpm), which will involve some shredding,bailing and temporary storage of the processed paper bales prior to transfer to off-site reprocessing and recycling facilities. A limited and small amount of shredded computer hard drives will be stored on site approximately 1-2 tonnes per annum or between 50-100 hard drives per month on average. This material amounting to c.1x240 litre in volume (domestic wheelie bin) will be kept on site and transferred off-site to an appropriate facility for further treatment. Storage of all material will be kept to a minimum on site and processed paper on average will only be kept on site for 24-48hrs before onward transfer off site.

Unit 6A, Westgate Business Park, Ballymount, Dublin, 12

98m
SD11A/0191Granted10 Aug 2011

Erection of an advertising / sign board (circa. 6m wide x 3m high with total area 18m sq.) and associated free standing 3no. vertical column support structure with platform (circa 10m high) with a total height of circa. 13m above ground level on site located to the east of Calmount Road and at North West corner of Honda Distribution centre site at M50 Business Park.

M50 Business Park, Ballymount Industrial Estate, Dublin 12

99m
S00A/0310Granted17 Aug 2000

Construct a lock-up workshop,(196 sq.m.).

Rear of 3 Ballymount Road Upper, Dublin 24.

112m
S00A/0714Granted13 Oct 2000

to construct block for office based industry at rear of approved development ( Ref. S99A/0826).

4 & 5 Ballymount Road Upper, Dublin 24.

115m
ED10/0030Declared Exempt14 Sept 2010

Internal alterations to warehouse Unit 4 to retain the single storey, undivided warehouse area. Works include removal of first floor office space 220 sq. mts and internal partition walls.

Unit 4, Westgate Business Park, Ballymount Road Upper, Ballymount, Dublin 24

119m
SD25A/0117Granted6 Oct 2025

To construct a new industrial building (412 msq) for maintenance of plant and machinery, with incorporated staff facilities, offices, meeting rooms and reception area along with a new connection to public sewers along with all associated services

Ballymount Road Upper, Dublin 24, D24 Y46R

121m
SD15A/0116Granted1 May 2015

Modification of previously approved fencing (Ref No: SD14A/0229) along the northwest side of the property to include the erection of a palisade fence on a concrete plinth ( total height = 2400mm) inside the boundary line, with 1220mm high steel columns/bollards set inside part of the fencing, and with electric fence (total height = 4000mm) & 1220m high steel columns/bollards set inside the remaining part of the fencing. The erection of a palisade fence on a concrete plinth (total height = 2400mm) with electric fence (total height = 4000mm) & 1220mm high steel columns/bollards set inside the fencing, to the left of the northeast elevation of the existing building, and along the southeast, and southwest sides of the property. The section of fencing to the left of the northeast elevation of the existing building will incorporate 1 sliding gate including an automated opening and closing function. The erection of a projecting angled electric fence (total height = 1000mm) fixed to the face of all elevations of the existing building near the parapet along the perimeter of the roof. The erection of 4 steel columns (total height = 5000mm) to the roof of the existing building to supoort steel cables for the prevention of attack by helicopter. The construction of a 153.1sq.m single storey extension at the existing 2 vehicle access doors to southwest/rear of the building to create 2 vehicle security access traps. The parapet height of the extension will match the parapet height (7,890mm approximately) of the existing canopy covering the area outside the current vehicle access points. 3 bollards, that are electro-automated to retract into ground to be installed outside each of the 2 vehicle access traps. 1 new escape door to the northwest elevation. 1 new escape door to the southwest elevation. Associated works.

Unit 4, Westgate Business Park, Ballymount, Dublin 24

121m
SD14A/0229Granted3 Nov 2014

Erection of a palisade fence on a concrete plinth (total height 2400mm) along part of the northeast side of the property with 1 sliding gate including an automated opening and closing function; erection of a steel railing fence on a concrete plinth (total height 2400mm) along part of the northeast side of the property with 1 manually operated personnel gate including footpath to connect with the estate footpath; erection of a palisade fence on a concrete plinth (total height 2400mm) along the northwest side of the property; 1200mm high 150 x 150mm steel columns/bollards set inside the fencing; associated works.

Unit 4, Westgate Business Park, Ballymount Road, Ballymount, Dublin 24

121m
SD19A/0005Granted22 May 2019

Construction of 1,540sq.m approx. of additional hardstanding on northeast and southwest areas of the site for parking of cars and service vehicles; associated works.

Unit 4, Westgate Business Park, Ballymount, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?