Unit 4, Westgate Business Park, Ballymount, Dublin 24
GrantedPlanning application SD22A/0274
Dublin - South Dublin County Council
Proposed Development
Permission for the proposed green energy initiative development consisting of the installation of Photovoltaic Panels on the existing roof structures together with all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
16 Jun 2022
Decision due
10 Aug 2022
Decision: Grant Permission
10 Aug 2022
Grant issued
21 Sept 2022
Application Details
- Location
- Unit 4, Westgate Business Park, Ballymount, Dublin 24
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 9500 ha
Timeline
- Registration Date
- 16 June 2022
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 10 August 2022
- Grant Date
- 21 September 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erection of a palisade fence on a concrete plinth (total height 2400mm) along part of the northeast side of the property with 1 sliding gate including an automated opening and closing function; erection of a steel railing fence on a concrete plinth (total height 2400mm) along part of the northeast side of the property with 1 manually operated personnel gate including footpath to connect with the estate footpath; erection of a palisade fence on a concrete plinth (total height 2400mm) along the northwest side of the property; 1200mm high 150 x 150mm steel columns/bollards set inside the fencing; associated works.
Unit 4, Westgate Business Park, Ballymount Road, Ballymount, Dublin 24
Modification of previously approved fencing (Ref No: SD14A/0229) along the northwest side of the property to include the erection of a palisade fence on a concrete plinth ( total height = 2400mm) inside the boundary line, with 1220mm high steel columns/bollards set inside part of the fencing, and with electric fence (total height = 4000mm) & 1220m high steel columns/bollards set inside the remaining part of the fencing. The erection of a palisade fence on a concrete plinth (total height = 2400mm) with electric fence (total height = 4000mm) & 1220mm high steel columns/bollards set inside the fencing, to the left of the northeast elevation of the existing building, and along the southeast, and southwest sides of the property. The section of fencing to the left of the northeast elevation of the existing building will incorporate 1 sliding gate including an automated opening and closing function. The erection of a projecting angled electric fence (total height = 1000mm) fixed to the face of all elevations of the existing building near the parapet along the perimeter of the roof. The erection of 4 steel columns (total height = 5000mm) to the roof of the existing building to supoort steel cables for the prevention of attack by helicopter. The construction of a 153.1sq.m single storey extension at the existing 2 vehicle access doors to southwest/rear of the building to create 2 vehicle security access traps. The parapet height of the extension will match the parapet height (7,890mm approximately) of the existing canopy covering the area outside the current vehicle access points. 3 bollards, that are electro-automated to retract into ground to be installed outside each of the 2 vehicle access traps. 1 new escape door to the northwest elevation. 1 new escape door to the southwest elevation. Associated works.
Unit 4, Westgate Business Park, Ballymount, Dublin 24
Construction of 1,540sq.m approx. of additional hardstanding on northeast and southwest areas of the site for parking of cars and service vehicles; associated works.
Unit 4, Westgate Business Park, Ballymount, Dublin 24
Internal alterations to warehouse Unit 4 to retain the single storey, undivided warehouse area. Works include removal of first floor office space 220 sq. mts and internal partition walls.
Unit 4, Westgate Business Park, Ballymount Road Upper, Ballymount, Dublin 24
Erect 1,063.05sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Unit 5, Westgate Business Park, Ballymount, Dublin 24
Retention for as constructed extended floor areas to ground floor level reception area (approx. 38sq.m) and first floor level office areas (approx. 49sq.m). Permission to construct a new extension to the north-eastern corner of a permitted storage warehouse building together with associated external signage, site development works; provide additional storage space at second floor level only (approx. 2,198sq.m) and form an undercroft to the permitted access/entrance areas.
M50 Business Park, Ballymount, Dublin 12
Construct additional floors at third and fourth floor levels internally as modifications to a recently permitted development under SD21A/0214 - extension of an existing storage warehouse building.
M50 Business Park, Ballymount, Dublin 12
Retention Planning Application to carry out the following developments to a permitted storage warehouse (Planning Reg. No.'s SD22A/0104, SD21A/0214, SD15A/0254), located at M50 Business Park beside the M50 Ballymount Interchange. The development will consist of (1) Retention Permission for as constructed extended floor area to first floor level storage area (approx. 200 sqm). (2) Retention Permission for as constructed additional stair core (Stair 05) and revised location and layout to permitted stair core (Stair 04). (3) Retention Permission for omission of solid masonry / RC wall to undercroft at north-east elevation. (4) Retention Permission for inclusion of a new pedestrian door to existing building, adjacent to main entrance door to reception area.
U Store It, M50 Business Park, Ballymount Avenue, Dublin 12, D12 HW6X
Storage warehouse 12,036sq.m gross internal floor area, including reception area, office and ancillary space, external signage with staff and customer car parking and associated site landscaping and drainage works. The vehicular entrance to the site will be from the internal access road in M50 Business Park which is accessed off Ballymount Road Upper. All on a site of c.0.77 hectares bounded by the grounds of Honda Motors to the north east; internal access road and Fashion City to the east; the Ballymount Interchange and M50 sliproad to the south and south west and Calmount Avenue to the west.
Site located at M50 Business Park beside the M50 Ballymount Interchange, Ballymount, Dublin 12
(1) Construct a new extension to the eastern corner of a permitted storage warehouse building, together with associated external signage, staff & customer car parking, and site landscaping. The proposed extension would provide additional storage space at second floor level only (approx. 778sq.m), and ancillary office space at first floor level (approx. 50sq.m) and form an undercroft to the permitted access/entrance areas. (2) Alterations to the permitted storage warehouse building comprising of: (a) remove external dock leveller located on north-west elevation, (b) amendments to the external elevations of the building comprising of a revised use of permitted colour scheme, and revised door and window locations, (c) revisions to internal layout at ground floor level on site beside the M50 Ballymount Interchange and M50 slip road to the south and southwest and Calmount Avenue.
M50 Business Park, Ballymount Road, Dublin 12.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?