← Back to search

Unit 27, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

Granted

Planning application SD23A/0050

Dublin - South Dublin County Council

Proposed Development

Construction of a new two storey, low profile, extension at north of existing structures to contain new toilets and changing rooms at ground floor level and new canteen at first floor level to replace the existing temporary structures on site together with all associated site works and services; All works proposed are ancillary to the use of the existing building and business.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Mar 2023

  2. Decision due

    8 May 2023

  3. Decision: Grant Permission

    8 May 2023

  4. Grant issued

    19 Jun 2023

Application Details

Location
Unit 27, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
4450 ha
Floor Area
256.242 sq m

Timeline

Registration Date
14 March 2023
Status
Final Grant
Decision
Grant Permission
Decision Date
8 May 2023
Grant Date
19 June 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD20A/0230Granted20 Jan 2021

Construction of a new warehouse to north of existing warehouse all to match existing structures on site.

Unit 27, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

15m
S00A/0392Refused18 Sept 2001

Extend industrial unit no. 27. The proposed works consist of a portal frame factory extension finished to match the existing building.

Unit No. 27, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

37m
SD25A/0155WInvalid - Site Notice27 Jun 2025

Proposed erection of a 233.57sq.m single storey single bay extension with 9 daylight panels integrated into pitched roof of existing unit.

Unit 28a, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10, D10XF44

37m
SD21A/0283Granted19 Oct 2021

Erection of 90sq.m single storey, single-bay extension with 6 daylight panels integrated into pitched roof for light industrial use, located to the rear of existing unit.

Unit 28a, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10, D10XF44

37m
SD25A/0309WGranted17 Dec 2025

Proposed erection of a 233.57 sq.m. Single storey single bay extension with 9 daylight panels integrated into pitched roof for light industrial use, to the rear of the existing unit 28a Cherryorchard industrial estate

UNIT 28A, CHERRYORCHARD INDUSTRIAL ESTATE, BALLYFERMOT, DUBLIN 10, D10 XF44

53m
SD06A/1133Granted22 Dec 2006

Demolition of existing 920mm high brick pier and 2 metal rail fence along Ballyfermot Road and for the erection of a new 2.0 metre high galvanised metal security fence, including 2 no. 10.0 metre wide gates and 2 no. 6.0 metre wide gates to provide necessary security along their site boundary enclosing Units 26, 43, 42 and part of Units 41 and 27.

Units 26, 27, 41, 42 And 43, Cherry Orchard Industrial Estate, Dublin 10.

53m
SD06A/1001Invalid - Site Notice22 Nov 2006

Demolition of existing 920mm high brick pier and 2 metal rail fence along Ballyfermot Road and the erection of a new 2m high galvanised metal security fence, including 2 no. 10m wide gates and 2no. 6m wide gates to provide necessary security along the site boundary enclosing units 26, 43, 42 and part of units 41 and 27 at Cherry Orchard Industrial Estate, Dublin 10.

Cardinal Health, Unit 26, 27, 41, 42 & 43, Cherry Orchard Industrial Estate, Dublin 10

57m
SD06A/0291Grant Permission for Retention21 Apr 2006

Retention of existing covered areas which link their five adjoining industrial units: (a) 253.0sq.m. single storey building linking Units 26 and 42 and 43 including demolition of east gable wall of Unit 42 and west gable wall of Unit 26. (b) 231.0sq.m. single storey covered yard area linking Units 26. 27, 41 and 42 with new enclosing walls along east and north sides. (c) 90.0sq.m. single storey general store along north wall of Unit 42 connected to two storey section with 35.0sq.m. metre ground floor locker room and first floor over 35.sq.m. metre tea station including external steel escape stairs with general construction and external finishes matching and not exceeding heights of the existing construction and drainage connections to existing local drains.

Cardinal Health, Unit 26, 27, 41, 42 and 43, Cherry Orchard Industrial Estate, Dublin 10.

57m
SD04A/0841Granted12 Nov 2004

a) Construction of a new first floor offices over existing ground floor offices at No. 26, (b) Internal alterations to existing ground floor offices, (c) New front and side elevational treatment to ground floor offices to include new metal cladding, relocation of front entrance and all new windows.

26/43, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

57m
SD04A/0779Invalid - Site Notice15 Oct 2004

a) Construction of a new first floor offices over existing ground floor offices at No. 26; b) Internal alterations to existing ground floor offices; c) New front and side elevational treatment to ground floor offices to include new metal cladding, relocation of front entrance and all new windows.

26/43, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?