← Back to search

Kilmore , Capparoe , Nenagh

N/A

Planning application 17600441

Tipperary - Tipperary County Council

Proposed Development

dwellinghouse, garage, waste water treatment system, entrance, driveway along with all ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
Kilmore , Capparoe , Nenagh
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
28 April 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
17601441CONDITIONAL22 Dec 2017

dwellinghouse, garage, waste water treatment system, entrance, driveway along with all ancillary site works (Outline Planning Permission Ref No 17600614)

Kilmore , Capparoe , Nenagh

2m
17600614CONDITIONAL30 May 2017

dwellinghouse, garage, waste water treatment system, entrance, driveway along with all ancillary site works

Kilmore , Capparoe , Nenagh

156m
2360424N/A18 Jun 2023

construction of dwelling house, garage, waste water treatment system and entrance along with all ancillary site works

Lisbrien , Capparoe , Nenagh Co Tipperary

165m
2260238CONDITIONAL20 May 2022

a dwelling house, garage, waste water treatment system and entrance along with all ancillary site works

Lisbrien , Capparoe , Nenagh Co Tipperary

165m
2360435CONDITIONAL20 Jun 2023

the construction of a dwelling house, garage, waste water treatment system & entrance along with all ancillary site works

Lisbrien , Capparoe , Nenagh Co. Tipperary

373m
19600111CONDITIONAL12 Feb 2019

a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins, 4 no. inverter units, underground cable ducts, hard standing area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated site works

Lisbrien , Nenagh , Co. Tipperary

373m
25206REFUSED8 Oct 2025

19600111 a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins, 4 no. inverter units, underground cable ducts, hard standing area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated site works

Lisbrien , Nenagh , Co. Tipperary

373m
2660902N/A15 Sept 2026

RED III the development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares comprising of the following – i) construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres, ii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units, iii) 4 no. electrical invertor units, iv) use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area, v) 2 no. control cabins, vi) 33kV connector cable network, joint bays and associated works, vii) Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works, viii) The decommissioning of the solar farm and reinstatement of the site at the end of its operational life - the application seeks a 10-year permission with an operational lifetime of 40 years

Lisbrien , Nenagh , Co. Tipperary

547m
2660606CONDITIONAL22 Jun 2026

change of house design to that granted under planning ref: 2260722 including: a) Internal modifications and upgrades to the existing dwelling house (Protected Structure S243) and creation of openings to the new extension b) Single storey and part two-storey rear extension to the existing dwelling house c) Removal of existing derelict out-house and formation of new domestic garage d) Wastewater treatment system and all associated site works

Lisbrien , Lissenhall , Nenagh Co. Tipperary

547m
2260722CONDITIONAL19 Dec 2022

a) Two new rooflights one in each gable roof hip; b) Single storey extension to the rear : Kitchen, dining, living area, WC, utility, en-suite & service store; c) Patio area to the rear and side; d) Removal of derelict outhouse & formation of a new side parking area; e) Wastewater Treatment system; f) Internal modifications to create 2 No. en-suite shower rooms at first floor and ground floor openings to the rear extension

Lisbrien , Lissenhall , Nenagh

The submission window has closed

Observations on this application closed on Thursday 1 June 2017, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?