Dually , Cashel , Co. Tipperary
CONDITIONALPlanning application 17600532
Tipperary - Tipperary County Council
Proposed Development
construction of a two storey dwelling house, domestic garage, effluent treatment system with percolation area, entrance and all associated site works
Application Timeline
Application received
12 May 2017
Decision: CONDITIONAL
5 Jul 2017
Decision due
6 Jul 2017
Grant issued
9 Aug 2017
Application Details
- Location
- Dually , Cashel , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.2 ha
- Floor Area
- 238.72 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 12 May 2017Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 July 2017
- Grant Date
- 9 August 2017
- Permission Expires
- 8 August 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
erection of a portacabin for sessional use for childcare facilities including before school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connect to public services and all associated works in the curtilage
No. 13 Lios Dubhaile , Dualla Village , Co. Tipperary
erection of a portacabin for sessional use for childcare facilities including after school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connection to on-site wastewater treatment system and for all associated works
Dualla Community Centre , Newpark (Fussough) , Dualla Cashel
erection of a portacabin for sessional use for childcare facilities including after school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connection to on-site wastewater treatment system and for all associated works
Dualla Community Centre , Newpark (Fussough) , Dualla Cashel
construction of a 400m running track, perimeter walking track, long jump & external exercise area. Reconfiguration of existing soccer field, provision of pitch drainage, and two new dugouts. Construction of a precast hurling wall, training area & basketball court, enclosed by a 2.4 meter high weld-mesh fence and 2.6 meter netting on top. Flood lighting and associated site lighting, site boundary & site development works
Newpark (Fussough) , Dualla Cashel , Co. Tipperary
installation of a 200m3 reservoir, chlorine booster facility incorporating control kiosk, and inspection chambers on the existing Dualla water treatment plant site
Dualla , Cashel , Co. Tipperary
(i) reorganise the existing entrances to the car park from 3 no. existing entrances to a single entrance and a single exit, (ii) install a new surface water infiltration system, (iii) resurface the existing carpark with new parking layout, (iv) erect new car park lighting - and all associated site works
Rathclogh North , Dually , Cashel
the construction of a residential development consisting of five two-storey detached dwellings plus one single storey detached dwelling, each dwelling to be served by individual waste water treatment systems, a new site entrance plus all associated site services, site enclosures and site works
Fussough , Co. Tipperary
the construction of a residential development consisting of five two-storey detached dwellings and one single storey detached dwelling, new site entrance plus all associated site enclosures and site works
Dualla , Cashel , Co. Tipperary
sessional use for childcare facilities including before school care from 7.30am to 9.10am (ages 4-12yrs), preschool care from 9.20am to 12.20pm (ages 2.5-5 yrs) and after school care from 2.00pm to 6.00pm (ages 4-12yrs) Monday to Friday and all associated works at the existing Dualla Community Hall
Dualla Village , Co. Tipperary
sessional use for childcare facilities including before school care from 7.30am to 9.10am (ages 4-12yrs), preschool care from 9.20am to 12.20pm (ages 2.5-5 yrs) and after school care from 2.00pm to 6.00pm (ages 4-12yrs) Monday to Friday and all associated works at the existing Dualla Community Hall complex
Dualla Village , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?