Gortdrum , Donohill , Co. Tipperary
CONDITIONALPlanning application 17601272
Tipperary - Tipperary County Council
Proposed Development
the continuation of use of an existing fish farm structure, two storage units and all associated ancillary facilities located at
View the full application file on the council's planning portal →Application Timeline
Application received
20 Nov 2017
Decision due
23 Jan 2018
Decision: CONDITIONAL
23 Jan 2018
Grant issued
27 Feb 2018
Application Details
- Location
- Gortdrum , Donohill , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 20 November 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 January 2018
- Grant Date
- 27 February 2018
- Permission Expires
- 26 February 2038
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
demolition of pre-existing dwelling house and replacement with one and half storey dwelling house; front boundary wall and vehicular entrance; biocycle unit as part of wastewater treatment system; demolition of pre-existing sheds, and Planning Permission for sand polishing filter as part of wastewater treatment system and all associated site and ancillary works
Barnaleen , Donohill , Co. Tipperary
the following: Effluent treatment system comprising treatment unit and polishing filter; and all associated site and ancillary works
Gortdrum , Donohill , Co. Tipperary E34 NV21
RED III application for the development, consisting of the construction of a solar photovoltaic (PV) energy development on a site spanning approximately 65.6 hectares. It will comprise ground-mounted solar PV panels installed on steel support structures, along with 17 no. transformers, underground cabling, perimeter fencing with secure access gates, 43 no. closed-circuit television cameras on posts, 3 no. temporary construction compounds, new and upgraded access tracks, and associated landscaping and ancillary works. The site will be accessed from four existing access points off the L-8210, which dissects the application site, three of which will be upgraded to facilitate access. The development will have an operational capacity of up to 53.1 megawatt peak and is designed to operate for 40 years from the date of commissioning. A Natura Impact Statement (NIS) will accompany the planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
land within the townlands of Lisheennamalausa Ballyryan West Gortdrum and Barnanalleen , in the Civil Parish of Solloghod-More , Co. Tipperary
RED III development which will consist of a 10-year permission for the construction of a solar photovoltaic (PV) energy development on a site spanning approximately 65.9 hectares. It will comprise ground-mounted solar PV panels installed on steel support structures, along with 17 no. transformers, underground cabling including a cable route connecting to the IPP Substation Building consented under Planning Reference 2260420, perimeter fencing with secure access gates, 43 no. closed-circuit television cameras on posts, 3 no. temporary construction compounds, new and upgraded access tracks, and associated landscaping and ancillary works. The site will be accessed from four existing access points off the L-8210, which dissects the Application Site, three of which will be upgraded to facilitate access. The development will have an operational capacity of up to 53.1 megawatt peak and is designed to operate for 40 years from the date of commissioning. A Natura Impact Statement (NIS) will accompany the planning application.
Land within the townlands of Seskin Moanmore Lisheennamalausa Ballyryan West Gortdrum and Barnanalleen , in the Civil Parish of Solloghod-More , Co. Tipperary
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) which incorporate at inverter and a transformer, 1. No. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9) 1. No. single storey equipment storage building (7.5m2 x 2.7m), 7 no. CCTV cameras mounted on 4m high poles, perimeter security fencing and all ancillary works. NIS will be submitted with the planning application
Kyleagarry Ballyryan East and Gortdrum , Donohill
the construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha
Kyleagarry Kyle Ballyryan East and Gortdrum , Donohill , Co. Tipperary
a 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed substation site; Solar panels on ground-mounted galvanised steel frames, 81 no. string inverters attached to selected ground-mounted galvanized steel frames, 6 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; A temporary construction compound; and All associated ancillary development works. The operational lifespan of the solar PV development will be 35 years. A Natura Impact Statement will accompany the planning application
Barnanalleen and Lisheennamalausa , Co. Tipperary
the partially constructed dwelling house on site (which was previously permitted under expired planning reference 08-726) together with hardcore areas to front of site and around the house. PERMISSION is also being sought to complete the construction of the dwelling house, new vehicular entrance with front boundary hedgerow, installation of domestic wastewater treatment system with polishing filter together with all associated site works
Soloheadbeg (Solloghodbed townland) , Donohill , Co. Tipperary
partially completed dwelling and for Permission to modify and complete the partially completed dwelling (previous planning ref 08-726 and 01-614), new garage, installation of wastewater treatment system and all associated site works
Soloheadbeg , Donohill , Co. Tipperary
partially constructed dwelling and Permission to modify and complete the partially completed dwelling (previous ref 08-726 and 01-614), new garage, installation of wastewater treatment system and associated works