Gortdrum , Donohill , Co. Tipperary

CONDITIONAL

Planning application 17601272

Tipperary - Tipperary County Council

Proposed Development

the continuation of use of an existing fish farm structure, two storage units and all associated ancillary facilities located at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Nov 2017

  2. Decision due

    23 Jan 2018

  3. Decision: CONDITIONAL

    23 Jan 2018

  4. Grant issued

    27 Feb 2018

Application Details

Location
Gortdrum , Donohill , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
20 November 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 January 2018
Grant Date
27 February 2018
Permission Expires
26 February 2038

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

561m
19601169CONDITIONAL22 Oct 2019

demolition of pre-existing dwelling house and replacement with one and half storey dwelling house; front boundary wall and vehicular entrance; biocycle unit as part of wastewater treatment system; demolition of pre-existing sheds, and Planning Permission for sand polishing filter as part of wastewater treatment system and all associated site and ancillary works

Barnaleen , Donohill , Co. Tipperary

770m
211761CONDITIONAL7 Dec 2021

the following: Effluent treatment system comprising treatment unit and polishing filter; and all associated site and ancillary works

Gortdrum , Donohill , Co. Tipperary E34 NV21

849m
2660157N/A24 Feb 2026

RED III application for the development, consisting of the construction of a solar photovoltaic (PV) energy development on a site spanning approximately 65.6 hectares. It will comprise ground-mounted solar PV panels installed on steel support structures, along with 17 no. transformers, underground cabling, perimeter fencing with secure access gates, 43 no. closed-circuit television cameras on posts, 3 no. temporary construction compounds, new and upgraded access tracks, and associated landscaping and ancillary works. The site will be accessed from four existing access points off the L-8210, which dissects the application site, three of which will be upgraded to facilitate access. The development will have an operational capacity of up to 53.1 megawatt peak and is designed to operate for 40 years from the date of commissioning. A Natura Impact Statement (NIS) will accompany the planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

land within the townlands of Lisheennamalausa Ballyryan West Gortdrum and Barnanalleen , in the Civil Parish of Solloghod-More , Co. Tipperary

851m
2660672N/A10 Jul 2026

RED III development which will consist of a 10-year permission for the construction of a solar photovoltaic (PV) energy development on a site spanning approximately 65.9 hectares. It will comprise ground-mounted solar PV panels installed on steel support structures, along with 17 no. transformers, underground cabling including a cable route connecting to the IPP Substation Building consented under Planning Reference 2260420, perimeter fencing with secure access gates, 43 no. closed-circuit television cameras on posts, 3 no. temporary construction compounds, new and upgraded access tracks, and associated landscaping and ancillary works. The site will be accessed from four existing access points off the L-8210, which dissects the Application Site, three of which will be upgraded to facilitate access. The development will have an operational capacity of up to 53.1 megawatt peak and is designed to operate for 40 years from the date of commissioning. A Natura Impact Statement (NIS) will accompany the planning application.

Land within the townlands of Seskin Moanmore Lisheennamalausa Ballyryan West Gortdrum and Barnanalleen , in the Civil Parish of Solloghod-More , Co. Tipperary

873m
22165CONDITIONAL25 Feb 2022

The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) which incorporate at inverter and a transformer, 1. No. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9) 1. No. single storey equipment storage building (7.5m2 x 2.7m), 7 no. CCTV cameras mounted on 4m high poles, perimeter security fencing and all ancillary works. NIS will be submitted with the planning application

Kyleagarry Ballyryan East and Gortdrum , Donohill

891m
19601430REFUSED19 Dec 2019

the construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha

Kyleagarry Kyle Ballyryan East and Gortdrum , Donohill , Co. Tipperary

931m
211109CONDITIONAL28 Jul 2021

a 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed substation site; Solar panels on ground-mounted galvanised steel frames, 81 no. string inverters attached to selected ground-mounted galvanized steel frames, 6 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; A temporary construction compound; and All associated ancillary development works. The operational lifespan of the solar PV development will be 35 years. A Natura Impact Statement will accompany the planning application

Barnanalleen and Lisheennamalausa , Co. Tipperary

973m
2460699N/A23 Aug 2024

the partially constructed dwelling house on site (which was previously permitted under expired planning reference 08-726) together with hardcore areas to front of site and around the house. PERMISSION is also being sought to complete the construction of the dwelling house, new vehicular entrance with front boundary hedgerow, installation of domestic wastewater treatment system with polishing filter together with all associated site works

Soloheadbeg (Solloghodbed townland) , Donohill , Co. Tipperary

978m
19600278REFUSED27 Mar 2019

partially completed dwelling and for Permission to modify and complete the partially completed dwelling (previous planning ref 08-726 and 01-614), new garage, installation of wastewater treatment system and all associated site works

Soloheadbeg , Donohill , Co. Tipperary

987m
19601248REFUSED6 Nov 2019

partially constructed dwelling and Permission to modify and complete the partially completed dwelling (previous ref 08-726 and 01-614), new garage, installation of wastewater treatment system and associated works

Soloheadbeg , Donohill , Co. Tipperary