Kyleagarry Kyle Ballyryan East and Gortdrum , Donohill , Co. Tipperary

REFUSED

Planning application 19601430

Tipperary - Tipperary County Council

Proposed Development

the construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2019

  2. Further information requested

    20 Feb 2020

  3. Further information received

    2 Jun 2020

  4. Decision due

    29 Jun 2020

  5. Decision: REFUSED

    29 Jun 2020

  6. Appeal submitted

    27 Jul 2020

  7. Appeal decided: REFUSED

    30 Nov 2020

Application Details

Location
Kyleagarry Kyle Ballyryan East and Gortdrum , Donohill , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
19 December 2019
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
29 June 2020

An Coimisiún Pleanála Appeal

Appeal Reference
307702-20
Decision
REFUSED
Submitted
27 July 2020
Decided
30 November 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

145m
22165CONDITIONAL25 Feb 2022

The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) which incorporate at inverter and a transformer, 1. No. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9) 1. No. single storey equipment storage building (7.5m2 x 2.7m), 7 no. CCTV cameras mounted on 4m high poles, perimeter security fencing and all ancillary works. NIS will be submitted with the planning application

Kyleagarry Ballyryan East and Gortdrum , Donohill

189m
19601384N/A11 Dec 2019

The construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha

Kyleagarry Kyle Ballyryan East and Gortdrum , Co. Tipperary

310m
22131N/A17 Feb 2022

The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) which incorporate at inverter and a transformer, 1. No. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9) 1. No. single storey equipment storage building (7.5m2 x 2.7m), 7 no. CCTV cameras mounted on 4m high poles, perimeter security fencing and all ancillary works. NIS will be submitted with the planning application

Kyleagarry Ballyryan East and Gortdrum , Donohill

324m
2270N/A28 Jan 2022

a10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x2.5m),1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 7 no. CCTV cameras mounted on 4m high poles, perimeter security fencing and all ancillary works. An Natura Impact statement will accompany the planning application

Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary

332m
2296N/A8 Feb 2022

a 10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x2.5m),1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 7 no. CCTV cameras mounted on 4m high poles, perimeter security fencing and all ancillary works. An Natura Impact statement will accompany the planning application

Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary

456m
2460006CONDITIONAL5 Jan 2024

construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m high poles, electrical and communications cabling, palisade security fencing and all ancillary works, this proposed extension development will be connected to an existing permitted solar development under planning application ref: PL 22/165 by underground cables - A Natura Impact Statement will accompany the planning application

Kyle and Kyleagarry , Gortdrum , Co. Tipperary

573m
19600334CONDITIONAL8 Apr 2019

demolition of rear single storey extension to dwelling, Permission to construct new two storey extension and carry out renovations to existing dwelling, Permission to demolish domestic garage and domestic shed and Permission to install a new waste water treatment system and sand polishing filter

Milltown , Solohead , Co. Tipperary

792m
211761CONDITIONAL7 Dec 2021

the following: Effluent treatment system comprising treatment unit and polishing filter; and all associated site and ancillary works

Gortdrum , Donohill , Co. Tipperary E34 NV21

796m
201542N/A18 Dec 2020

demolition of existing single-storey dwelling and outbuilding and construction of a new one and a half storey, part single-storey dwelling, with separate garage, photovoltaic solar panels, septic tank and raised percolation area, new vehicular entrance and associated site boundary and site development works

Ballyryan West , Co. Tipperary

820m
2141CONDITIONAL15 Jan 2021

demolition of existing single-storey dwelling and outbuilding and construction of a new one and a half storey, part single-storey dwelling, with separate garage, photovoltaic solar panels, septic tank and raised percolation area, new vehicular entrance and associated site boundary and site development works

Ballyryan West , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?