← Back to search

Ballydrehid , Cahir , Co. Tipperary

N/A

Planning application 18600336

Tipperary - Tipperary County Council

Proposed Development

a portacabin classroom and all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Mar 2018

  2. Further information requested

    10 May 2018

  3. Further information received

    11 Jul 2018

  4. Application withdrawn

    18 Feb 2019

Application Details

Location
Ballydrehid , Cahir , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
20 March 2018
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
18 February 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

316m
201363CONDITIONAL18 Nov 2020

erection of a two story extension to the front of my existing dwelling, extend upwards the existing front of house flat roofed extension to create a two story extension and to reconstruct the existing dwelling to suit the new developments. I wish to carry out all the above and all ancillary site works

Bhindi , Ballydrehid Kilmoyler , Cahir

371m
21753CONDITIONAL26 May 2021

erection of a two storey dwelling house, septic tank and percolation area, entrance and all associated site works

Ballydrehid , Cahir , Co. Tipperary

495m
17601004CONDITIONAL11 Sept 2017

to retain indefinitely the conservatory to the side of my dwelling and retention of single storey domestic garage and planning permission to install a domestic effluent treatment system with percolation area and all associated works

Ballydrehid , Cahir , Co Tipperary

655m
201117CONDITIONAL30 Sept 2020

construction of extension to dwelling and Retention Permission for (i) detached garage/store and (ii) block wall on portion of western boundary

Ballydrehid , Cahir , Co. Tipperary

900m
2460114CONDITIONAL21 Feb 2024

close existing entrance and construct new entrance and access road to dwelling

Ballydrehid , Cahir , Co. Tipperary

1.3km
2260677CONDITIONAL8 Dec 2022

the construction of (i) Loose shed with crush, underground effluent tank and all associated site works. permission for the demolition of existing loose shed is also required. Permission for retention is also being sought for (i) slatted shed with underground effluent tank (ii) agricultural entrance with new boundary wall

Toureen , Cahir , Co. Tipperary

1.3km
2260653N/A28 Nov 2022

the construction of a loose area with crush, underground effluent tank and all associated site works. Permission for Retention is also being sought for (i) a slatted shed with underground effluent tank (ii) an agricultural entrance with new boundary wall. Demolition of existing loose shed is also required

Toureen , Cahir , Co. Tipperary.

1.3km
2260630N/A17 Nov 2022

(i) slatted shed with underground effluent tank (ii) agricultural entrance with new boundary wall. Demolition of existing loose shed is also required and Permission for (i) Loose area with crush, underground effluent tank and all associated site works

Toureen , Cahir , Co. Tipperary.

1.3km
20239CONDITIONAL12 Mar 2020

the front porch and the extension (to eastern side) of my dwelling

Ballydrehid , Cahir , Co. Tipperary

1.3km
17601060CONDITIONAL26 Sept 2017

the following development (a) demolition of existing single storey outhouses to the north and existing extension to rear, (b) construction of part single storey and part storey and half extension to rear of existing house with packaged waste water treatment system and polishing filter, (c) external and internal alterations to existing house, (d) new vehicular entrance and associated site boundary and site development works, the existing dwelling is a Protected Structure - Ref No. S1030 in the South Tipperary County Development Plan 2009

Toureen , Cahir , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?