Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford

N/A

Planning application 19601283

Tipperary - Tipperary County Council

Proposed Development

development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)

View the full application file on the council's planning portal →

Application Details

Location
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
18 November 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

53m
19601309N/A25 Nov 2019

development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)

Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford

76m
2018CONDITIONAL14 Jan 2020

development consisting of the installation of battery arrays, located within container units (18 number units, each 30m2 by c.2.6m tall), a control building (c.160.5m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)

Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford

150m
17601085REFUSED28 Sept 2017

construction of 1 No. wind turbine with steel tower and composite fibre rotor blades of 67 metres hub height , blade radius of 40 meteres/80 meters diameter, with overall blade tip height of 107 meteres(relating to the same site as previously applied for Planning Ref 06/1452) and including wind turbine transformer, turbine hardstand, access track, under-grounded electrical cables, underground communication cable and all associated site works and ancillary development

Moanvaun , Glengar , Hollyford

734m
2460747CONDITIONAL6 Sept 2024

further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning Permission Ref 12/77 and extended under Planning Permission Ref 15600530 and Planning Permission Ref 18600988 and also Planning Permission Ref 211313 for the purposes of monitoring wind and climate conditions at Garracummer windfarm (granted under Planning Ref 04/1259 and ABP PL.23.215597), at lands at Cummer Beg, Garracummer, Birchgrove, Moanvaun, Curraghmarky & Cummermore, Hollyford, Co. Tipperary. Permission is sought for the further continued use of the permitted meteorological masts for the remaining lifetime of the windfarm

Cummer Beg Garracummer Birchgrave Moanvaun Curraghmarky & Cummeramore , Hollyford , Tipperary

736m
18600988CONDITIONAL8 Aug 2018

further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning permission ref: 12/77 and extended under planning permission ref: 15600530, for the purposes of monitoring wind and climate conditions at Garracummer windfarm granted permission under planning ref: 04/1259 and ABP PL.23.215597

Cummer Beg Garracummer Birchgrove Moanvaun Curraghmarky & Cummermore , Hollyford , Co. Tipperary

873m
2260570CONDITIONAL21 Oct 2022

1) a proposed staff welfare compound, consisting of 4 no. 6m x 4m x 3.0m high, prefabricated welfare and administration buildings, a car park area for 5 no. vehicles, 1 no. 1.2m x 1.2m x 3.0m high toilet block with self-contained effluent storage tank approximately 1,500 litres in size, 2) RETENTION PERMISSION for an amended internal site access road layout and hardstanding areas (previously approved under planning reg. ref.: 04/1259) and 3) all associated site ancillary services and works, total development area of approx. 1.8 ha

Birchgrove Curraghmarky , Garracummer Moanvaun and Tooreen , Co. Tipperary

1.7km
211760CONDITIONAL7 Dec 2021

construction of two new dwellings, with a shared entrance, two new garages, two new wells, two new waste-water treatment systems with polishing filters and all associated site works

Tooreen , Hollyford , Co Tipperary

1.9km
21918CONDITIONAL24 Jun 2021

a new longitudinal loading bay adjacent to the North Western side of the existing public road for temporary forest use, the longitudinal loading bay has been designed as per COFORD Forest Road Manual and will comprise clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage and all associated site works

Foilycleary , Kilcommon , Thurles Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.