Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
CONDITIONALPlanning application 2018
Tipperary - Tipperary County Council
Proposed Development
development consisting of the installation of battery arrays, located within container units (18 number units, each 30m2 by c.2.6m tall), a control building (c.160.5m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)
View the full application file on the council's planning portal →Application Timeline
Application received
14 Jan 2020
Further information requested
6 Mar 2020
Further information received
25 Jun 2020
Decision: CONDITIONAL
18 Aug 2020
Decision due
19 Aug 2020
Appeal submitted
14 Sept 2020
Appeal decided: CONDITIONAL
12 Jul 2021
Application Details
- Location
- Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 14 January 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 August 2020
- Permission Expires
- 11 July 2026
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-308163-20
- Decision
- CONDITIONAL
- Submitted
- 14 September 2020
- Decided
- 12 July 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
construction of 1 No. wind turbine with steel tower and composite fibre rotor blades of 67 metres hub height , blade radius of 40 meteres/80 meters diameter, with overall blade tip height of 107 meteres(relating to the same site as previously applied for Planning Ref 06/1452) and including wind turbine transformer, turbine hardstand, access track, under-grounded electrical cables, underground communication cable and all associated site works and ancillary development
Moanvaun , Glengar , Hollyford
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning permission ref: 12/77 and extended under planning permission ref: 15600530, for the purposes of monitoring wind and climate conditions at Garracummer windfarm granted permission under planning ref: 04/1259 and ABP PL.23.215597
Cummer Beg Garracummer Birchgrove Moanvaun Curraghmarky & Cummermore , Hollyford , Co. Tipperary
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning Permission Ref 12/77 and extended under Planning Permission Ref 15600530 and Planning Permission Ref 18600988 and also Planning Permission Ref 211313 for the purposes of monitoring wind and climate conditions at Garracummer windfarm (granted under Planning Ref 04/1259 and ABP PL.23.215597), at lands at Cummer Beg, Garracummer, Birchgrove, Moanvaun, Curraghmarky & Cummermore, Hollyford, Co. Tipperary. Permission is sought for the further continued use of the permitted meteorological masts for the remaining lifetime of the windfarm
Cummer Beg Garracummer Birchgrave Moanvaun Curraghmarky & Cummeramore , Hollyford , Tipperary
1) a proposed staff welfare compound, consisting of 4 no. 6m x 4m x 3.0m high, prefabricated welfare and administration buildings, a car park area for 5 no. vehicles, 1 no. 1.2m x 1.2m x 3.0m high toilet block with self-contained effluent storage tank approximately 1,500 litres in size, 2) RETENTION PERMISSION for an amended internal site access road layout and hardstanding areas (previously approved under planning reg. ref.: 04/1259) and 3) all associated site ancillary services and works, total development area of approx. 1.8 ha
Birchgrove Curraghmarky , Garracummer Moanvaun and Tooreen , Co. Tipperary
construction of two new dwellings, with a shared entrance, two new garages, two new wells, two new waste-water treatment systems with polishing filters and all associated site works
Tooreen , Hollyford , Co Tipperary
a new longitudinal loading bay adjacent to the North Western side of the existing public road for temporary forest use, the longitudinal loading bay has been designed as per COFORD Forest Road Manual and will comprise clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage and all associated site works
Foilycleary , Kilcommon , Thurles Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?