Kilballygorman , Ardfinnan , Clonmel
CONDITIONALPlanning application 19601326
Tipperary - Tipperary County Council
Proposed Development
minor changes to the elevations of existing dwelling and to retain as constructed extension to existing domestic garage, to retain two number additional sheds, to retain dog kennels and dog runs all with associated site works
Application Timeline
Application received
28 Nov 2019
Further information requested
28 Jan 2020
Further information received
28 Feb 2020
Decision: CONDITIONAL
19 Mar 2020
Decision due
26 Mar 2020
Grant issued
17 Jun 2020
Application Details
- Location
- Kilballygorman , Ardfinnan , Clonmel
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 28 November 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 March 2020
- Grant Date
- 17 June 2020
- Permission Expires
- 16 June 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of an electricity control compound to connect the permitted Monroe East Solar Array (Pl. Ref: 16/600642 & 21/473) to Ardfinnan 38kV Substation including palisade fencing, site entrance, 2 No. electricity control units, and all ancillary site works
Kilballygorman , Ardfinnan Clonmel , Co. Tipperary
change of house type and repositioned driveway at house no. 48 from that approved under Permission No. 05/1228, the house has been changed from 5 bedroom type 5a to 4 bedroom type 4a and the driveway has been altered and repositioned so that it is accessed from the estate road opposite house no. 8
48 Ros na Greine , Clogheen Road Magheragh , Ardfinnan Clonmel
67 houses complete with external works. The proposed development will comprise: 4 no. semi-detached single storey 2 bedroom houses; 11 no. semi-detached single storey 3 bedroom houses (3 no. with garages); 1 no. detached single-storey house; 39 no. semi-detached two-storey 3 bedroom houses (2 no. with garages); 8 no. detached two-storey 3 bedroom houses, 1 no. detached two storey 4 bedroom house with garage; 3 no. detached two-storey 5 bedroom house with garage under clause A 42 (1A)(a)(V)
Clogheen Road , Maghereagh , Ardfinnan
existing detached domestic garage/art studio and to retain fuel storage shed, all with associated site works
Magherareagh , Ardfinnan , Clonmel
construction of a bedroom with special bathroom at ground floor level to rear of my dwelling, along with all ancillary site works
37 Castleview , Ardfinnan , Co. Tipperary
to erect a 30m high lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing with an extension to an existing access track
Monroe West (Td) , Ardfinnan , Co. Tipperary
the demolition of existing toilet and back hall attached to side of existing dwelling house and the construction of a new wet room, bathroom and utility and all associated site works including access ramps
Magherareagh , Ardfinnan , Clonmel
the demolition of an outside toilet and construction of a toilet and wet room
Magherareagh , Ardfinnan , Clonmel
the development will consist of a solar farm comprising of approximately 9.4 hectares of solar panels on ground mounted steel frames, 1 no. single storey delivery substation, 2 no. single storey inverter/transformer units, drainage swales, underground cable ducts on site, temporary construction compound (including site offices, portable toilets and parking area), boundary security fence, site entrance, access tracks, CCTV and all associated site works
Magherareagh , Ardfinnan , Co. Tipperary
RED III construction of a photovoltaic solar farm development - the proposed development seeks a 10-year planning permission for the proposed photovoltaic solar farm development and all associated site works. The development will consist of linear arrays of solar photovoltaic panels on ground mounted frames of ca. 9.40 hectares overall area, including: associated cabling & ducting and hybrid inverters; a 20kV electrical customer control building; ESB modular hub and transformers; site entrance and access track; perimeter fencing up to 2.5 metres high; pole mounted CCTV cameras up to 3 metres high; temporary access track, temporary contractor’s compound & temporary storage area; and all associated site development and ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application. The proposed development will have a 40-year operational life from the date of commissioning
Magherareagh Townland , Ardfinnan , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?