Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

CONDITIONAL

Planning application 201308

Tipperary - Tipperary County Council

Proposed Development

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Nov 2020

  2. Further information requested

    6 Jan 2021

  3. Further information received

    10 Feb 2021

  4. Decision: CONDITIONAL

    2 Mar 2021

  5. Decision due

    9 Mar 2021

  6. Grant issued

    5 Apr 2021

Application Details

Location
Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.261 ha
Floor Area
1516.2 sq m
Residential Units
1

Timeline

Registration Date
6 November 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 March 2021
Grant Date
5 April 2021
Permission Expires
4 April 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
201263N/A29 Oct 2020

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

35m
19600008CONDITIONAL4 Jan 2019

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Tyone , Nenagh North & Nenagh South , Dublin Road Nenagh

35m
24152REFUSED8 Jul 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

35m
24267UNCONDITIONAL20 Nov 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

35m
25218UNCONDITIONAL23 Oct 2025

construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

71m
21222CONDITIONAL24 Feb 2021

new solar panels to the existing roof of each of the 14 existing houses, numbers 1 to 12 and 14 to 15 inclusive, and all associated site works

Tyone , adjacent to Abbeycourt Hotel , Dublin Road Nenagh

73m
2460075N/A7 Feb 2024

(1). Solar PV panels to the existing hotel roof (2). Two new wind turbines, not exceeding 21.2m height (3). A container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works

Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

81m
21108N/A2 Feb 2021

solar panels to roof of rear elevations of 14 existing private dwellings and all associated site works

Tyone , Dublin Road , Nenagh Co. Tipperary

82m
2561333N/A19 Dec 2025

1) ground mounted solar PV panels with new fence enclosure and access gates, 2) a switchgear container, 3) 6 No. electric vehicle charging points and associated site works

Nenagh North Nenagh South and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

82m
20259CONDITIONAL16 Mar 2020

material change of use of 14 existing three-storey holiday homes to private dwellings, the construction of new metal railings to enclose front gardens, hard and soft landscaping, external lighting and associated site works, adjacent to Abbey Court Hotel

Nenagh North and Nenagh South , Dublin Road , Nenagh Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?