Rathduff , Thomastown , Co. Tipperary
N/APlanning application 20506
Tipperary - Tipperary County Council
Proposed Development
a period of 5 years to construct and complete a Solar PV Energy Development with a total site of 43.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels, ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years
Application Timeline
Application received
25 May 2020
Application withdrawn
9 Jul 2020
Application Details
- Location
- Rathduff , Thomastown , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 25 May 2020
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 9 July 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a period of 5 years to construct and complete a Solar PV Energy Development with a total site area of 42.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The development would be operational for 35 years
Rathduff , Thomastown Demesne South , Co. Tipperary
RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade fencing, lighting, CCTV and internal access tracks, as well as a minor reconfiguration of the permitted solar array, involving the removal of 11 tables of solar panels to accommodate the revised substation footprint. All other infrastructure of the development permitted under PL92.313424 remain unchanged. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Rathduff , Townland of Thomastown Demesne South , Co. Tipperary
a period of 5 years to construct and complete a Solar PV Energy Development with a total site of 43.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels, ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years
Rathduff , Thomastown , Co. Tipperary
a period of 5 years to construct and complete a Solar PV Energy Development with a total site of 43.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels, ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years
Rathduff , Thomastown , Co. Tipperary
a) Construction of a new agricultural entrance b) Construction of farm roadways and all associated site works PLEASE NOTE: This site lies within the curtilage of a protected structure(s). (TRPS 1912)
Rathduff & Thomastown Demesne South , Golden , Co. Tipperary
a) construction of a new agricultural entrance b) construction of farm roadways and all associated site works
Rathduff & Thomastown Demesne South , Golden , Co. Tipperary
the construction of a two storey dwelling, garage, septic tank, peroclation area, site entrance, site boundaries and all associated site works
Ballymacady , Golden , Co. Tipperary
an existing in -line stable shed and Planning Permission for a livestock shed with underground slatted concrete tank, feeding passage, concrete apron and livestock shed over existing uncovered cubicle area and all associated works
Thomastown Demesne South , Golden , Co Tipperary
Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works.
Ballymacady , Golden , Co. Tipperary
Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works.
Ballymacady , Golden , Co. Tipperary
The submission window has closed
Observations on this application closed on Sunday 28 June 2020, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?