Knockballynoe East , Kilfeakle , Co. Tipperary

CONDITIONAL

Planning application 211317

Tipperary - Tipperary County Council

Proposed Development

construction of two extensions to dwelling consisting of lounge and master bedroom and Permission to construct domestic garage and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Sept 2021

  2. Decision: CONDITIONAL

    27 Oct 2021

  3. Decision due

    28 Oct 2021

  4. Grant issued

    30 Nov 2021

Application Details

Location
Knockballynoe East , Kilfeakle , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
3 September 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 October 2021
Grant Date
30 November 2021
Permission Expires
29 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18601308CONDITIONAL31 Oct 2018

the following development: (a) front porch, (b) rear extension, (c) revised front/roadside boundary including revisions to the existing site entrance, and (d) upgraded on-site wastewater treatment & disposal system serving the existing dwelling house and all associated ancillary works

Knockballynoe East , Kilfeakle , Co. Tipperary

471m
201205CONDITIONAL16 Oct 2020

construction of cubicle shed with underground effluent tank and all associated site works

Knockballynoe East , Kilfeacle , Co. Tipperary

514m
23305UNCONDITIONAL29 Nov 2023

the construction of an energy storage facility within a total site of up to 0.86 hA, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, containerised battery storage modules and spare parts containers on concrete support structures, access tracks, associated electrical ducting, cable racking and cabling, security fencing and CCTV security monitoring system, lightning protection poles, communications equipment and ancillary infrastructure previous ref 18600406

Ballyglasheen , Kilfeakle , Co. Tipperary

514m
18600406REFUSED5 Apr 2018

development will consist of a 10 year permission for the construction of an energy storage facility within a total site of up to 0.86 hA, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, containerised battery storage modules and spare parts containers on concrete support structures, access tracks, associated electrical ducting, cable racking and cabling, security fencing and CCTV security monitoring system, lightning protection poles, communications equipment and ancillary infrastructure

Ballyglasheen , Kilfeakle , Co. Tipperary

524m
18600278N/A8 Mar 2018

development will consist of a 10 year permission for the construction of an energy storage facility within a total site of up to 0.86 hA, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, containerised battery storage modules on concrete support structures, access tracks, associated electrical ducting, cable racking and cabling, security fencing and CCTV security monitoring system, lightning protection poles, communications equipment and ancillary infrastructure

Ballyglasheen , Kilfeakle , Co. Tipperary

672m
22177CONDITIONAL2 Mar 2022

(a) construction of a steel framed lime storage shed (11.96m high with a gross floor area of 400m2); (b) new single storey rear and side extension to existing site office building (new additional gross floor area of 88.9m2, total combined gross floor area of 131.5m2) consisting of office and welfare facilities; (c) all ancillary works

Deerpark & Kilfeacle Townlands , Kilfeacle

908m
2460337CONDITIONAL3 May 2024

(1) the provision of a 2,416 square metre defined recycling area in the pit floor; (2) the processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant; (3) stockpiling of waste concrete prior to processing and (4) stockpiling of recycled aggregates prior to transport off-site for use in construction works

Deerpark , Kilfeacle , Co. Tipperary

1.0km
2460240CONDITIONAL3 Apr 2024

disconnecting from septic tank on adjoining property and permission to install secondary treatment system and soil polishing filter and associated site works

Dromline , Co. Tipperary

1.0km
2360976CONDITIONAL8 Dec 2023

conversion of agricultural shed into residential accommodation as constructed and also permission to modify and convert this residential accommodation into one single dwelling house, permission to remove existing entrance and construct replacement entrance, permission to de-commission existing septic tank system on site and replace with new waste water treatment system and percolation area and permission to modify slatted unit on site and re-purpose same as Hay Barn and associated site works

Dromline , Tipperary , Co. Tipperary

1.1km
22133N/A17 Feb 2022

For (a) construction of a steel framed lime storage shed (11.96m high with a gross floor area of 400m2); (b) new single storey rear and side extension to existing site office building (new additional gross floor area of 88.9m2, total combined gross floor area of 131.5m2) consisting of office and welfare facilities; (c) all ancillary works