Cloonyross , Rossmore , Co Tipperary

N/A

Planning application 21939

Tipperary - Tipperary County Council

Proposed Development

construct an extension to existing dwelling house consisting of 3 bedrooms and kitchen/living area, permission is also sought to upgrade existing septic tank system with new effluent treatment system together with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Jun 2021

  2. Further information requested

    18 Aug 2021

  3. Application withdrawn

    26 Feb 2022

Application Details

Location
Cloonyross , Rossmore , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.214 ha

Timeline

Registration Date
28 June 2021
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
26 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

65m
18600059N/A23 Jan 2018

development consisting of the construction of 344m of 2.4m high palisade fencing and one manually operated lockable gate suited to match perimeter fencing

Rossmore Water Treatment Plant , Kilcroe , Co. Tipperary

73m
18600290CONDITIONAL9 Mar 2018

development consisting of the construction of 344m of 2.4m high palisade fencing and the installation of one manually operated lockable gate suited to match perimeter fencing

Rossmore Water Treatment Plant , Kilcroe , Co. Tipperary

75m
2561093CONDITIONAL30 Oct 2025

the raw water gravity filters to be refurbished with new filter laterals, replacement media and extension of an internal weir wall, two 36m³ pre-cast concrete backwash water storage tanks to be constructed to supplement existing wash water holding tank capacity, sodium hydroxide (ph correction) kiosk with duty and standby pumps, sodium hydroxide bulk storage tank, used wash water balance tank with a holding volume of 200m³, lamella clarifier, sludge balancing tank to be located below round with a storage volume of 36m³, sludge thickener to be located above ground, thickened sludge pump station, sludge holding tank with a storage volume of 219m³, poly prep unit to be located in a kiosk (sludge poly kiosk), motor control center (mcc) container for control panels, interconnecting pipework and ducting, extended internal site access road, hardstanding around tanks and chambers, all related site works and ancillary development

Stooke Water Treatment Plant , Townland of Kilcroe , Co. Tipperary

78m
17600378N/A13 Apr 2017

construction of a dwelling house, entrance, effluent treatment system together with all associated site works

Kilcroe , Rossmore , Co. Tipperary

597m
19600789CONDITIONAL15 Jul 2019

the upgrade of an existing agricultural entrance into a forest road bellmouth to facilitate a timber harvest and haulage operation

Drumdiha , Kilcroe , Clogher

598m
19600738N/A3 Jul 2019

the upgrade of existing site entrance to facilitate a timber harvest and haulage operation

Drumdiha , Kilcroe , Clogher

930m
18600144CONDITIONAL8 Feb 2018

the change of house design as granted under planning File 14600525 for two storey dwelling house

Turraheen Lower , Rossmore , Co Tipperary

1.1km
211220N/A18 Aug 2021

new two storey extension to side ( to replace existing single storey structure to be demolished) and new single storey extension to rear of existing dwelling and all ancillary works

Turraheen Lower , Rossmore , Cashel

1.1km
211089N/A26 Jul 2021

new two storey extension to side (to replace existing single storey structure to be removed) and new single storey extension to rear of existing dwelling and all ancillary works

Turraheen Lower , Rossmore , Cashel

1.1km
201204N/A16 Oct 2020

new two storey extension to side (to replace existing single storey structure to be removed) and new single storey extension to rear of existing dwelling and all ancillary works

Turraheen Lower , Rossmore , Cashel

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.