← Back to search

NCT (Nenagh) , Lisboney Industrial Estate , Nenagh

CONDITIONAL

Planning application 22199

Tipperary - Tipperary County Council

Proposed Development

the internal modification to existing offices, waiting areas, toilets and canteen and the construction of new waiting / reception area, toilets store at ground floor level and new first floor mezzanine extension consisting of staff canteen, store , open plan area and comms room (107sqm) together with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Mar 2022

  2. Decision: CONDITIONAL

    27 Apr 2022

  3. Decision due

    2 May 2022

  4. Grant issued

    31 May 2022

Application Details

Location
NCT (Nenagh) , Lisboney Industrial Estate , Nenagh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.171 ha

Timeline

Registration Date
8 March 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 April 2022
Grant Date
31 May 2022
Permission Expires
30 May 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

62m
2360801CONDITIONAL6 Oct 2023

1) erection of two light industrial buildings ( Unit A & Unit B ) including storage areas, ancillary offices and services areas, 2) erection of new fencing/walls to site boundaries of development site, 3) new vehicular and pedestrian site entrance and exits to both road side boundaries of the development site, 4) all associated site works including gates ,fencing, vehicular parking, footpaths, roadways, lighting, foul and surface water, drainage, hard and soft landscaping and all ancillary site works and services connections

Lisboney Industrial Estate , Lisboney , Nenagh

67m
2460765N/A12 Sept 2024

commercial garage on existing serviced site

Lisboney Industrial Estate , Lisboney , Nenagh

75m
2460787CONDITIONAL18 Sept 2024

a commercial garage on existing serviced site, new entrance and front and rear boundary fence

Lisboney Industrial Estate , Lisboney , Nenagh Co Tipperary

131m
211185N/A11 Aug 2021

(a) construct new first floor area to incorporate proposed offices, training room, storage areas with associated ancillary areas (b) install new external windows to elevations to serve proposed first floor development (c) construct new dock leveller access with associated works to location of existing roller shutter door on south west elevation of existing building (d) Retention Permission for existing signage and elevational changes, with all associated site works and existing connection to all public utilities

Lisboney Industrial Estate , Nenagh , Co. Tipperary

149m
211338CONDITIONAL8 Sept 2021

(a) construction of new first floor area to incorporate proposed offices, training room, storage areas with associated ancillary areas, (b) installation of new external windows to elevations to serve proposed first floor development, (c) construction of new dock leveller access with associated works to location of existing roller shutter door on south west elevation of existing building, (d) Retention Permission for existing signage and elevational changes with all associated site works and existing connection to all public utilities

Lisboney Industrial Estate , Nenagh , Co. Tipperary

215m
22151CONDITIONAL23 Feb 2022

construction of a proposed extension with a floor area of 2,786 Sq. meters to N/E of the existing industrial unit, inclusive of car parking, disabled car parking, covered bicycle parking, proposed new entrance, including services and all other associated site works

Unit 21 Lisbunny Industrial Estate , Lisbunny Nenagh , Co Tipperary

347m
2560005CONDITIONAL3 Jan 2025

the construction of 5 detached commercial buildings as follows: 1 no. aircraft engine maintenance building with associated office space, 1 no. aircraft engine storage facility with associated office space, 3 no. detached warehouse buildings, detached ESB substation, detached security hut, associated car and bicycle parking, internal road network together with connection to the existing business park roadway, site fencing and boundary treatment, connection to foul and storm sewers, connection to watermain and necessary services together with all associated incidental and site works

Lisboney Business Park , Nenagh , Co. Tipperary

355m
211329CONDITIONAL6 Sept 2021

demolition of elements of the industrial building and construction of extensions to adapt the existing factory unit for film production. Permission is sought for demolition of: 1. The offices located to the front of the factory building 2. Factory structure sections on the South East and North West side and other sections of the factory building extending above the general factory roofline 3. Pallet storage shed. Permission is sought for: 1. Construction of new 2-storey offices to the front of the factory building 2. 2-Storey replacement extension for actor preparation and dressing areas to the centre Northwest side of the existing factory 3. Extensions to the Northeast side of the factory accomodating 3 film sound stages 4. Advertising signage 5. Upgraded elevation treatments 6. Landscaping and boundary treatments 7. ESB Substation and switchrooms, solar panels, all associated site works 8. General site access improvements into the site from the Lisbunny Industrial Estate road including construction of footpaths and cycle paths, modified vehicular entrances to revised car park with security control cabin (entrance 1) , to actor preparation area (entrance 2) and to truck entrance and associated parking area (entrance 3)

Lisbunny Industrial Estate , Lisbunny , Nenagh Co. Tipperary

356m
2560930N/A18 Sept 2025

Subsivision and Change of use of portion of the former Rorer Factory unit at Lisbunny Industrial Estate , Lisbunny, Nenagh County Tipperary for use as a Community building to be Operated by the A-team . Permission is also sought for Internal alteration of the building, the provision of signage on the building , new pedestrian access gate from the public footpath along the Dublin road and Covered Bicycle storage area.

Former Rorer Building , Lisbunny Industrial Estate , Lisbunny

370m
2560991CONDITIONAL3 Oct 2025

the subdivision and change of use of portion of the former Rorer Factory unit for use as a community building to be operated by the A-team. Permission is also sought for internal alteration of the building, the provision of signage on the building, new pedestrian access gate from the public footpath along the Dublin road and covered bicycle storage area

Former Rorer Building , Lisbunny Industrial Estate , Lisbunny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?