Former Rorer Building , Lisbunny Industrial Estate , Lisbunny
N/APlanning application 2560930
Tipperary - Tipperary County Council
Proposed Development
Subsivision and Change of use of portion of the former Rorer Factory unit at Lisbunny Industrial Estate , Lisbunny, Nenagh County Tipperary for use as a Community building to be Operated by the A-team . Permission is also sought for Internal alteration of the building, the provision of signage on the building , new pedestrian access gate from the public footpath along the Dublin road and Covered Bicycle storage area.
View the full application file on the council's planning portal →Application Details
- Location
- Former Rorer Building , Lisbunny Industrial Estate , Lisbunny
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.91 ha
Timeline
- Registration Date
- 18 September 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the subdivision and change of use of portion of the former Rorer Factory unit for use as a community building to be operated by the A-team. Permission is also sought for internal alteration of the building, the provision of signage on the building, new pedestrian access gate from the public footpath along the Dublin road and covered bicycle storage area
Former Rorer Building , Lisbunny Industrial Estate , Lisbunny
demolition of elements of the industrial building and construction of extensions to adapt the existing factory unit for film production. Permission is sought for demolition of: 1. The offices located to the front of the factory building 2. Factory structure sections on the South East and North West side and other sections of the factory building extending above the general factory roofline 3. Pallet storage shed. Permission is sought for: 1. Construction of new 2-storey offices to the front of the factory building 2. 2-Storey replacement extension for actor preparation and dressing areas to the centre Northwest side of the existing factory 3. Extensions to the Northeast side of the factory accomodating 3 film sound stages 4. Advertising signage 5. Upgraded elevation treatments 6. Landscaping and boundary treatments 7. ESB Substation and switchrooms, solar panels, all associated site works 8. General site access improvements into the site from the Lisbunny Industrial Estate road including construction of footpaths and cycle paths, modified vehicular entrances to revised car park with security control cabin (entrance 1) , to actor preparation area (entrance 2) and to truck entrance and associated parking area (entrance 3)
Lisbunny Industrial Estate , Lisbunny , Nenagh Co. Tipperary
(a) construction of new first floor area to incorporate proposed offices, training room, storage areas with associated ancillary areas, (b) installation of new external windows to elevations to serve proposed first floor development, (c) construction of new dock leveller access with associated works to location of existing roller shutter door on south west elevation of existing building, (d) Retention Permission for existing signage and elevational changes with all associated site works and existing connection to all public utilities
Lisboney Industrial Estate , Nenagh , Co. Tipperary
(a) construct new first floor area to incorporate proposed offices, training room, storage areas with associated ancillary areas (b) install new external windows to elevations to serve proposed first floor development (c) construct new dock leveller access with associated works to location of existing roller shutter door on south west elevation of existing building (d) Retention Permission for existing signage and elevational changes, with all associated site works and existing connection to all public utilities
Lisboney Industrial Estate , Nenagh , Co. Tipperary
1) the demolition of an existing shed, 2) to renovate and extend existing cottage, 3) to install new wastewater treatment system, 4) to upgrade an existing entrance and all associated site works
Lisbunny , Nenagh , Co. Tipperary
the construction of 5 detached commercial buildings as follows: 1 no. aircraft engine maintenance building with associated office space, 1 no. aircraft engine storage facility with associated office space, 3 no. detached warehouse buildings, detached ESB substation, detached security hut, associated car and bicycle parking, internal road network together with connection to the existing business park roadway, site fencing and boundary treatment, connection to foul and storm sewers, connection to watermain and necessary services together with all associated incidental and site works
Lisboney Business Park , Nenagh , Co. Tipperary
commercial garage on existing serviced site
Lisboney Industrial Estate , Lisboney , Nenagh
a commercial garage on existing serviced site, new entrance and front and rear boundary fence
Lisboney Industrial Estate , Lisboney , Nenagh Co Tipperary
the internal modification to existing offices, waiting areas, toilets and canteen and the construction of new waiting / reception area, toilets store at ground floor level and new first floor mezzanine extension consisting of staff canteen, store , open plan area and comms room (107sqm) together with all associated site works
NCT (Nenagh) , Lisboney Industrial Estate , Nenagh
1) erection of two light industrial buildings ( Unit A & Unit B ) including storage areas, ancillary offices and services areas, 2) erection of new fencing/walls to site boundaries of development site, 3) new vehicular and pedestrian site entrance and exits to both road side boundaries of the development site, 4) all associated site works including gates ,fencing, vehicular parking, footpaths, roadways, lighting, foul and surface water, drainage, hard and soft landscaping and all ancillary site works and services connections
Lisboney Industrial Estate , Lisboney , Nenagh
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?