Belview , Rathmartin Rd , Nenagh Co.Tipperary
CONDITIONALPlanning application 2660876
Tipperary - Tipperary County Council
Proposed Development
a garage and a storage shed
Application Timeline
Application received
8 Sept 2026
Decision: CONDITIONAL
29 Oct 2026
Decision due
2 Nov 2026
Application Details
- Location
- Belview , Rathmartin Rd , Nenagh Co.Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.205 ha
Timeline
- Registration Date
- 8 September 2026Other applications received that week
- Status
- DECISION MADE
- Decision
- CONDITIONAL
- Decision Date
- 29 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the renovation and extension of existing house, demolition of the shed to rear and construction of a garage, and RETENTION Permission for relocation of entrance
Lisbunny , Nenagh , Co. Tipperary
1. Change of use of portion of existing storage shed to club gym; 2. External signage to side of gym & storage shed; 3. 2 no additional floodlights servicing 4G pitch to rear and Planning Permission to extend above mentioned storage shed and club gym to include additional dressing rooms, referee room and treatment room with showers and toilet facilities along with external signage to side of proposed extension
New Ormond Park , Tyone , Nenagh Co Tipperary
Extensions and alterations to dwelling, including: the demolition of existing two-storey extension to rear and part of existing shed; the construction of a new two-storey extension to the rear and a single storey extension to the side of the dwelling; alterations and replacement of existing windows; and the installation of a propriety wastewater treatment unit and associated percolation area
Lisbunny , Nenagh , Co. Tipperary
the addition of a 51m2 single storey summer house structure with ancillary patio space to the rear of the existing dwelling and adjoining an existing outbuilding
Lisbunny House , Lisbunny , Nenagh Co. Tipperary
a new energy centre building, generator and fuel storage compounds to the existing services. Works to include the following; (a) the demolition of the existing diesel storage tank and associated concrete bund, removal of existing electrical generator, and associated fencing to the generator compound; (b) a proposed new secured fuel storage compound with associated stone faced walls and new self-bunded fuel storage tank; (c) a proposed new single storey energy centre building containing a new LV switch room, a new transformer room, a new RMU and a new ESB substation; (d) a proposed 2 no. freestanding electrical generators within a new generator compound with an associated timber fence; (e) alterations to the existing site to include for repositioned accessible parking, ramps, footpaths, and landscaping; (f) and all ancillary site works both above and below ground. This is a protected structure
Nenagh General Hospital , Tyone Road , Nenagh Co. Tipperary
the construction of 67 no. residential units, a new single storey crèche, single storey health centre and a 3 storey, 90 bed nursing home. The residential units will consist of: 5 no. 1-bed semi-detached bungalows, 5 no. 2 bed semi-detached bungalows, 13 no. 2 bed mid-terrace bungalows, 2 no. 2 storey 4-bed semi-detached houses, 2 no. 2 storey 4-bed mid terrace houses, 14 no. 2 storey 3 bed semi-detached houses, 14 no. 2 storey 2 bed mid-terrace houses and 1 no. apartment building consisting of: 8 no. 1-bed apartments and 4 no. 2-bed apartments over 2 storeys, located as follows, (2 no. 2 bed and 4 no. 1 bed apartments on ground floor, 2 no. 2 bed and 4 no. 1 bed apartments on first floor), the proposed development will also include new internal roadways and footpaths, a proposed new distributor road to the north and east of proposed development, pedestrian/cycle access off the existing Tyone Road to the west of the site, vehicular access from the existing Ormond Drive, south of proposed site, new vehicular and pedestrian access, new boundary treatments, landscaping, drainage, site services including new ESB Medium Voltage (MV) substation building and all ancillary site works
Tyone , Nenagh , Co. Tipperary
1) extension to original cottage 2) shed as constructed on site and PLANNING PERMISSION for 1) demolition of existing shed 2) renovation and extension of house 3) construction of new shed 4) installation of new wastewater treatment system
Tyone , Nenagh , Co. Tipperary
the division of the existing site into two parts, a new three bedroom two storey detached house and new shared vehicular access and amended road frontage to improve sight lines and all ancillary site works
Laurella , Tyone , Nenagh
the renovation and extension of an existing house to west and east along with all associated site works. Permission sought for proposed new waste water treatment system with percolation area along with all associated site works. RETENTION PERMISSION for height, door and window alterations to part of existing shed
Lissatunny , Thurles Road Nenagh , Co. Tipperary
height, door and window alterations to part of existing shed. Retention permission sought for portacabin. Planning permission sought to renovate and extend existing house to west and east, along with all associated site works. Permission sought for proposed new waste water treatment system with percolation area, along with all associated site works
Lissatunny , Thurles Road Nenagh , Co Tipperary
The submission window has closed
A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Thursday 26 November 2026 — for a fee of €220.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?