← Back to search

Lisbunny , Nenagh , Co. Tipperary

CONDITIONAL

Planning application 2560195

Tipperary - Tipperary County Council

Proposed Development

the renovation and extension of existing house, demolition of the shed to rear and construction of a garage, and RETENTION Permission for relocation of entrance

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Mar 2025

  2. Decision: CONDITIONAL

    29 Apr 2025

  3. Decision due

    5 May 2025

  4. Grant issued

    3 Jun 2025

Application Details

Location
Lisbunny , Nenagh , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.32 ha

Timeline

Registration Date
11 March 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 April 2025
Grant Date
3 June 2025
Permission Expires
2 June 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

182m
18600459CONDITIONAL17 Apr 2018

Extensions and alterations to dwelling, including: the demolition of existing two-storey extension to rear and part of existing shed; the construction of a new two-storey extension to the rear and a single storey extension to the side of the dwelling; alterations and replacement of existing windows; and the installation of a propriety wastewater treatment unit and associated percolation area

Lisbunny , Nenagh , Co. Tipperary

204m
2660208CONDITIONAL6 Mar 2026

the addition of a 51m2 single storey summer house structure with ancillary patio space to the rear of the existing dwelling and adjoining an existing outbuilding

Lisbunny House , Lisbunny , Nenagh Co. Tipperary

220m
2660145N/A20 Feb 2026

1) the demolition of an existing shed, 2) to renovate and extend existing cottage, 3) to install new wastewater treatment system, 4) to upgrade an existing entrance and all associated site works

Lisbunny , Nenagh , Co. Tipperary

256m
2360573CONDITIONAL29 Jul 2023

the construction of an extension to the rear of existing cottage dwelling with all associated siteworks

Lisbunny , Nenagh , Co. Tipperary

297m
19601275CONDITIONAL14 Nov 2019

construction of an agricultural entrance and farm roadway, including all associated site works

Lisbunny , Nenagh , Co Tipperary

479m
211329CONDITIONAL6 Sept 2021

demolition of elements of the industrial building and construction of extensions to adapt the existing factory unit for film production. Permission is sought for demolition of: 1. The offices located to the front of the factory building 2. Factory structure sections on the South East and North West side and other sections of the factory building extending above the general factory roofline 3. Pallet storage shed. Permission is sought for: 1. Construction of new 2-storey offices to the front of the factory building 2. 2-Storey replacement extension for actor preparation and dressing areas to the centre Northwest side of the existing factory 3. Extensions to the Northeast side of the factory accomodating 3 film sound stages 4. Advertising signage 5. Upgraded elevation treatments 6. Landscaping and boundary treatments 7. ESB Substation and switchrooms, solar panels, all associated site works 8. General site access improvements into the site from the Lisbunny Industrial Estate road including construction of footpaths and cycle paths, modified vehicular entrances to revised car park with security control cabin (entrance 1) , to actor preparation area (entrance 2) and to truck entrance and associated parking area (entrance 3)

Lisbunny Industrial Estate , Lisbunny , Nenagh Co. Tipperary

508m
2560991CONDITIONAL3 Oct 2025

the subdivision and change of use of portion of the former Rorer Factory unit for use as a community building to be operated by the A-team. Permission is also sought for internal alteration of the building, the provision of signage on the building, new pedestrian access gate from the public footpath along the Dublin road and covered bicycle storage area

Former Rorer Building , Lisbunny Industrial Estate , Lisbunny

528m
2560930N/A18 Sept 2025

Subsivision and Change of use of portion of the former Rorer Factory unit at Lisbunny Industrial Estate , Lisbunny, Nenagh County Tipperary for use as a Community building to be Operated by the A-team . Permission is also sought for Internal alteration of the building, the provision of signage on the building , new pedestrian access gate from the public footpath along the Dublin road and Covered Bicycle storage area.

Former Rorer Building , Lisbunny Industrial Estate , Lisbunny

537m
2260373CONDITIONAL18 Jul 2022

(a)Refurbishment/Alterations to Existing Two storey detached dwelling, (b)New single storey extensions to Side South-West/ Rear North-East Elevations of existing dwelling, (c)Replacement of existing septic tank and percolation area with new Treatment system & percolation Area, (d)All associated site works/services

Tyone Rathmartin rd Nenagh Co. Tipperary , Nenagh , Co. Tipperary

570m
2560005CONDITIONAL3 Jan 2025

the construction of 5 detached commercial buildings as follows: 1 no. aircraft engine maintenance building with associated office space, 1 no. aircraft engine storage facility with associated office space, 3 no. detached warehouse buildings, detached ESB substation, detached security hut, associated car and bicycle parking, internal road network together with connection to the existing business park roadway, site fencing and boundary treatment, connection to foul and storm sewers, connection to watermain and necessary services together with all associated incidental and site works

Lisboney Business Park , Nenagh , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?