Milltownmore , Fethard , Co. Tipperary
CONDITIONALPlanning application 2260121
Tipperary - Tipperary County Council
Proposed Development
reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility, increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility, air handling bio-filter installation and associated extract and input fans, all necessary site works, an Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the proposed development will require a review of the site’s EPA Industrial Emissions Licence (W0270-02)
View the full application file on the council's planning portal →Application Timeline
Application received
14 Mar 2022
Further information requested
5 May 2022
Further information received
4 Jul 2022
Decision due
20 Sept 2022
Decision: CONDITIONAL
20 Sept 2022
Appeal submitted
12 Oct 2022
Grant issued
5 Dec 2023
Appeal decided: MODIFIED
5 Dec 2023
Application Details
- Location
- Milltownmore , Fethard , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 3.93 ha
Timeline
- Registration Date
- 14 March 2022
- Status
- APPEALED FINANCIAL
- Decision
- CONDITIONAL
- Decision Date
- 20 September 2022
- Grant Date
- 5 December 2023
- Permission Expires
- 4 December 2028
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-314834-22
- Decision
- MODIFIED
- Submitted
- 12 October 2022
- Decided
- 5 December 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility. Increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility. Air handling bio-filter installation and associated extract and input fans. All necessary site works. An Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the development will require a review of the site’s EPA Industrial Emissions License (W0270-02)
Milltownmore , Fethard , Co. Tipperary
an increased throughput of organic waste material at the existing Miltown Composting Ltd. facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement
Miltownmore , Fethard , Co. Tipperary
reconstruction of and extension to existing agricultural storage building and all necessary site works and services
Milltownmore , Fethard , Co. Tipperary
Biofilter and associated extract and input fans to compost maturation shed with embankment screen. Roof watering harvesting storage tank.
Milltownmore , Fethard , Co. Tipperary
an increased throughput of organic waste material at the existing Miltown composting facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement
Miltownmore , Fethard , Co. Tipperary
reconstruction of and extension to existing agricultural storage building and all necessary site works and services
Milltowmore , Fethard , Co Tipperary
to construct a 36-meter- high multi use lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed with a 2.4 meter high palisade fence compound with associated ground equipment and associated site works including new access track
Moorstown , Fethard , Co Tipperary
a 36 metre high multi-user lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track
Milltownmore , Fethard , Co Tipperary
(A) alterations to elevations of the existing dwelling house and changes to the roof height at the rear of the dwelling from planning permission granted under P314075. (B) Retention permission to retain the construction of an extension to the rear of the dwelling. (C) Retention permission for the change of use of domestic garage to granny flat
Moorstown , Fethard , Co Tipperary
A) alterations to elevations of existing dwelling house & changes to roof height at the rear of the dwelling from planning permission granted under P3/14075. B) an extension to the rear of the dwelling & continuance of use as a granny flat, C) for the change of use of domestic garage to granny flat and continuance of use as a granny flat
Moorstown , Fethard
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?