← Back to search

Milltownmore , Fethard , Co Tipperary

N/A

Planning application 22635

Tipperary - Tipperary County Council

Proposed Development

a 36 metre high multi-user lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track

View the full application file on the council's planning portal →

Application Details

Location
Milltownmore , Fethard , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
15 November 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
22655CONDITIONAL2 Dec 2022

to construct a 36-meter- high multi use lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed with a 2.4 meter high palisade fence compound with associated ground equipment and associated site works including new access track

Moorstown , Fethard , Co Tipperary

84m
17600372CONDITIONAL11 Apr 2017

an increased throughput of organic waste material at the existing Miltown Composting Ltd. facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement

Miltownmore , Fethard , Co. Tipperary

86m
21808REFUSED3 Jun 2021

reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility. Increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility. Air handling bio-filter installation and associated extract and input fans. All necessary site works. An Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the development will require a review of the site’s EPA Industrial Emissions License (W0270-02)

Milltownmore , Fethard , Co. Tipperary

86m
2260121CONDITIONAL14 Mar 2022

reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility, increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility, air handling bio-filter installation and associated extract and input fans, all necessary site works, an Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the proposed development will require a review of the site’s EPA Industrial Emissions Licence (W0270-02)

Milltownmore , Fethard , Co. Tipperary

95m
18600472CONDITIONAL18 Apr 2018

Biofilter and associated extract and input fans to compost maturation shed with embankment screen. Roof watering harvesting storage tank.

Milltownmore , Fethard , Co. Tipperary

99m
19600690CONDITIONAL21 Jun 2019

reconstruction of and extension to existing agricultural storage building and all necessary site works and services

Milltownmore , Fethard , Co. Tipperary

138m
17600297N/A23 Mar 2017

an increased throughput of organic waste material at the existing Miltown composting facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement

Miltownmore , Fethard , Co. Tipperary

138m
19600561N/A24 May 2019

reconstruction of and extension to existing agricultural storage building and all necessary site works and services

Milltowmore , Fethard , Co Tipperary

826m
22337N/A5 May 2022

(A) alterations to elevations of the existing dwelling house and changes to the roof height at the rear of the dwelling from planning permission granted under P314075. (B) Retention permission to retain the construction of an extension to the rear of the dwelling. (C) Retention permission for the change of use of domestic garage to granny flat

Moorstown , Fethard , Co Tipperary

828m
22281N/A7 Apr 2022

A) alterations to elevations of existing dwelling house & changes to roof height at the rear of the dwelling from planning permission granted under P3/14075. B) an extension to the rear of the dwelling & continuance of use as a granny flat, C) for the change of use of domestic garage to granny flat and continuance of use as a granny flat

Moorstown , Fethard

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?