Ballylaffin , Ardfinnan , Co. Tipperary
CONDITIONALPlanning application 2460915
Tipperary - Tipperary County Council
Proposed Development
the erection of a dwelling house, entrance, driveway, treatment system, private well and all ancillary site works
Application Timeline
Application received
24 Oct 2024
Decision: CONDITIONAL
12 Dec 2024
Decision due
18 Dec 2024
Grant issued
24 Jan 2025
Application Details
- Location
- Ballylaffin , Ardfinnan , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.39 ha
- Floor Area
- 185.7 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 24 October 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 12 December 2024
- Grant Date
- 24 January 2025
- Permission Expires
- 23 January 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a single storey link extension to the south east side of an existing cottage and conversion of existing outhouse to the south east side of an existing cottage to habitable accommodation, waste water treatment system with polishing filter and associated site boundary and site development works
Ballylaffin , Ardfinnan , Clonmel
construction of (i) Cubicle shed with slatted tank (ii) Walled silage slab and all associated site works. Demolition of existing silage slab and loose shed required
Ballylaffin , Ardfinnan , Co. Tipperary
the construction of a dwelling, entrance, waste water treatment system - and all associated site development works
Ballydrinan , Cahir , Co. Tipperary
the construction of a dwelling, entrance, waste water treatment system and all associated site development works
Ballydrinan , Cahir , Co. Tipperary
the development will consist of a solar farm comprising of approximately 9.4 hectares of solar panels on ground mounted steel frames, 1 no. single storey delivery substation, 2 no. single storey inverter/transformer units, drainage swales, underground cable ducts on site, temporary construction compound (including site offices, portable toilets and parking area), boundary security fence, site entrance, access tracks, CCTV and all associated site works
Magherareagh , Ardfinnan , Co. Tipperary
RED III construction of a photovoltaic solar farm development - the proposed development seeks a 10-year planning permission for the proposed photovoltaic solar farm development and all associated site works. The development will consist of linear arrays of solar photovoltaic panels on ground mounted frames of ca. 9.40 hectares overall area, including: associated cabling & ducting and hybrid inverters; a 20kV electrical customer control building; ESB modular hub and transformers; site entrance and access track; perimeter fencing up to 2.5 metres high; pole mounted CCTV cameras up to 3 metres high; temporary access track, temporary contractor’s compound & temporary storage area; and all associated site development and ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application. The proposed development will have a 40-year operational life from the date of commissioning
Magherareagh Townland , Ardfinnan , Co. Tipperary
the construction of a dwelling, garage, effluent treatment system, entrance and all associated site works
Ballydrinan , Ardfinnan , Clonmel
demolition of existing cottage and construction of a new single storey dwelling with packaged waste water treatment system with raised soil polishing filter and associated site boundary and site development works
Gormanstown , Ardfinnan , Clonmel
a two storey dwelling house, domestic garage, entrance, effluent treatment systems and percolation area and all associated site works
Ballydrinan , Ardfinnan , Clonmel
to construct a two storey dwelling house, domestic garage, entrance, effluent treatment system and percolation area and all other associated site works
Ballydrinan , Ardfinnan , Clonmel