Proposed Development

a new treatment system and percolation area, alterations to existing site access and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Oct 2024

  2. Further information requested

    16 Dec 2024

  3. Further information received

    17 Jan 2025

  4. Decision: CONDITIONAL

    12 Feb 2025

  5. Decision due

    13 Feb 2025

  6. Grant issued

    18 Mar 2025

Application Details

Location
Mill Road , Thurles , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.169 ha

Timeline

Registration Date
25 October 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 February 2025
Grant Date
18 March 2025
Permission Expires
17 March 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

56m
22576CONDITIONAL26 Sept 2022

a two storey dwelling, domestic garage, new site entrance, new secondary treatment system and soil polishing filter and all associated site works

Mill Road , Turtulla , Thurles

204m
19601118CONDITIONAL10 Oct 2019

construction of a free-standing dormer type dwelling and detached garage, external works will include a packaged wastewater treatment system and polishing filter, a new splayed entrance from the public road and realigned front boundary

Turtulla , Thurles , Co. Tipperary

306m
24157N/A11 Jul 2024

open plan kitchen/diner, small single toilet and sink

Archerstown , Thurles , Co Tipperary

320m
2460662CONDITIONAL10 Aug 2024

an extension to the rear of dwelling consisting of a open plan kitchen/dining area and utility room etc, a store to the side of dwelling and a garden shed/store to the rear of site with all associated siteworks

Archerstown , Thurles , Co. Tipperary

336m
2460511N/A25 Jun 2024

the filling in of existing poor quality agricultural land with inert material comprising of topsoil, subsoil and stone in order to raise the level of the ground, utilising the existing agricultural entrance including all ancillary and associated siteworks

Mill Road , Thurles , Co. Tipperary

475m
19600979CONDITIONAL4 Sept 2019

first floor classroom/office extension and associated external fire escape stairs; single storey storage building extension; external gas/compressor storage shed for associated apprenticeship training; elevational alterations and minor internal alterations together with all associated site development works

ETB Archerstown Industrial Estate , Turtulla , Thurles

475m
17601101CONDITIONAL5 Oct 2017

(1) Planning Permission for change of use from industrial to further education and apprentice training facility use; elevational alterations incorporating 1 no. new roller door to rear (North) elevation; removal of 1 no. roller door to rear (North) and infilling with 2 no. windows and insulated cladding; additional personnel doors to North, South and West and 3 no. additional windows at first floor level to east ; removal of 3 no. roller doors to south elevation and replace with brick cladding and 4 no. windows; entrance canopy over east elevation personnel access door; bicycle parking at side entrance (east); additional car parking spaces in existing ramped area; vehicular set-down zone and turning area; signage mounted on building to south and west elevations; 1 no. totem sign; (2) Retention Permission for 4 no. roller shutter doors to rear (North) elevation; 1 no. window at first floor level to side (East) elevation together with all associated site development works all at Archerstown Industrial Estate (former Jobst building)

Turtulla , Thurles , Co. Tipperary

475m
211556CONDITIONAL22 Oct 2021

1) extension to existing canteen at ground floor level with stair access to proposed upper level, 2) first floor extension to part of training facility incorporating extension to existing ground floor canteen seating area, 5 no. classrooms, tutors administration area and all associated facilities, 3) external fire escape stairway to rear yard and 4) elevational alterations for windows and escape door together with associated site development works

ETB Archerstown Industrial Estate , Turtulla , Thurles Co. Tipperary

495m
17601040N/A22 Sept 2017

(1) change of use from industrial to further education and apprentice training facility use; 1 no. new roller door to rear (North) elevation; minor elevational alterations; 1 no. totem sign; signage mounted on building to South and West elevations (2) Retention Permission for 4 no. roller shutter doors to rear (North) elevation; 1 no. window at first floor level to side (East) elevation together with all associated site development works all at Archerstown Industrial Estate (former Jobst building)

Turtulla , Thurles , Co. Tipperary

631m
18600454N/A16 Apr 2018

the siting of a Porto cabin and container

Kickham Park , Mullauns , Mill Road

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?