← Back to search

Castleway , Dublin Road , Nenagh

UNCONDITIONAL

Planning application 25218

Tipperary - Tipperary County Council

Proposed Development

construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Oct 2025

  2. Decision: UNCONDITIONAL

    9 Dec 2025

  3. Decision due

    17 Dec 2025

Application Details

Location
Castleway , Dublin Road , Nenagh
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Tipperary County Council

Timeline

Registration Date
23 October 2025
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
9 December 2025
Permission Expires
8 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
19600008CONDITIONAL4 Jan 2019

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Tyone , Nenagh North & Nenagh South , Dublin Road Nenagh

0m
24152REFUSED8 Jul 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

0m
24267UNCONDITIONAL20 Nov 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

33m
201263N/A29 Oct 2020

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

35m
201308CONDITIONAL6 Nov 2020

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

49m
2561333N/A19 Dec 2025

1) ground mounted solar PV panels with new fence enclosure and access gates, 2) a switchgear container, 3) 6 No. electric vehicle charging points and associated site works

Nenagh North Nenagh South and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

54m
2460449CONDITIONAL6 Jun 2024

(1) ground mounted solar PV panels with new fence enclosure and access gates; (2) a container battery storage installation with 6 electric vehicle charge points, and associated site works

Nenagh North Nenagh South and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

59m
2460075N/A7 Feb 2024

(1). Solar PV panels to the existing hotel roof (2). Two new wind turbines, not exceeding 21.2m height (3). A container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works

Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

67m
18601532N/A21 Dec 2018

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 12 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Tyone , Nenagh North & Nenagh South , Dublin Road

83m
2460078N/A8 Feb 2024

1. Solar PV panels to the existing hotel roof 2. Two new wind turbines, not exceeding 21.2m height. 3. A Container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works

Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?