Ballynahinch , Birdhill , Co. Tipperary
CONDITIONALPlanning application 2561021
Tipperary - Tipperary County Council
Proposed Development
the construction of a new dwelling, garage, wastewater treatment system & polishing filter, site entrance & all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
10 Oct 2025
Further information requested
27 Nov 2025
Further information received
23 Dec 2025
Decision: CONDITIONAL
22 Jan 2026
Decision due
28 Jan 2026
Grant issued
25 Feb 2026
Application Details
- Location
- Ballynahinch , Birdhill , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 1.04 ha
- Floor Area
- 308 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 10 October 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 January 2026
- Grant Date
- 25 February 2026
- Permission Expires
- 24 February 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of extensions to the rear and side of dwelling, alterations to existing elevations, modification and replacement of existing roof and inclusion of dormer windows, construction of domestic garage and replacement of existing waste water treatment system and all associated site works
Ballinahinch , Birdhill , Co Tipperary
the construction of extensions to the rear and side of dwelling, alterations to existing elevations, modification and replacement of existing roof and inclusion of dormer windows, construction of domestic garage and replacement of existing waste water treatment system and all associated site works
Ballinahinch , Birdhill , Co Tipperary
an existing 24 metre multi-user telecommunications support structure carrying associated antennae and link dishes, associated equipment cabinets, fencing and access track. The development will continue to form part of existing Operators 2G and 3G Broadband Networks
Ballynahinch House , Ballynahinch Td , Birdhill
an existing 24m multi-user telecommunications support structure carrying associated antennae and link dishes, associated equipment cabinets, fencing and access track. The development will continue to form part of existing Operators 2G and 3G Broadband Networks.
Ballinahinch House , Ballinahinch , Birdhill
3m extension to existing telecommunications structure to support telecommunications antennas for use by Eir, which together with the installation of a dish, ground based equipment cabinets and associated infrastructure will provide 2G, 3G and 4G mobile communication services from the installation
Ballynahinch House , Ballynahinch TD , Birdhill
3 m extension to existing telecommunications structure to support telecommunications antennas for use by eir, which together with the installation of a dish, ground based equipment cabinets and associated infrastructure will provide 2G, 3G and 4G mobile communication services from the installation
Ballynahinch House , Ballynahinch td , Birdhill
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points, a new access road to the compound is also proposed, 3) the drive-thru coffee facility is a single storey building (204 sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point, 4) the proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24 sq.m of signage), 5) all associated site development works, including new lighting
Birdhill Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary
of the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works. (1.) The fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces. (2.) The compressed natural gas compound is a single storey development consisting of a compressor building (19sq.m), covered shelter (29sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points. A new access road to the compound is also proposed. (3.) The drive-thru coffee facillity is a single storey building (204sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point. (4.) The proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24sq.m of signage). (5.) All associated site development works, including new lighting.
Birdhill Service Area , Junction 7 (M7) , Lackanavea
expansion of the existing service station to accommodate a new HGV and Coach parking area, vegetated infiltration basin and dog walking trail; reconfiguration of the existing parking area to provide additional staff and customer car parking; new extended canopy and provision of 3 new pumps islands; and ancillary works including: part of canopy and pump under to be removed, relocation of HVO tank and container, landscaped areas. new internal road and paths, all associated site works
Birdhill Service Area Junction 7 (M7) , Lacken Birdhill , Co. Tipperary
a high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8 no. electric vehicle bays & 4 no. charging points (powered by 100% renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) landscape renewal & (v) revised parking bay markings (zevi compliant).
Applegreen Motorway Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?