Miletree House , Ardgaoithe Lawlesstown , Clonmel Co.Tipperary
N/APlanning application 2561087
Tipperary - Tipperary County Council
Proposed Development
the change of use of an existing thatched cottage, which is a protected structure, from residential to office use, including a new entrance and RETENTION PERMISSION FOR an existing lightweight steel agricultural enclosure
View the full application file on the council's planning portal →Application Details
- Location
- Miletree House , Ardgaoithe Lawlesstown , Clonmel Co.Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.169 ha
Timeline
- Registration Date
- 29 October 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the change of use of existing thatched cottage, which is a protected structure from residential to office use, retention of existing entrance and PERMISSION for the alteration of existing entrance and retention of an existing lightweight steel agricultural shed
Miletree House , Ardgaoithe Lawlesstown , Clonmel Co. Tipperary
the proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited intend to apply for a change of use for the existing cottage on the development from domestic to office use
Ard Gaoithe , Lawlesstown , Clonmel
the proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited intend to apply for a change of use for the existing cottage on the development from domestic to office use
Ard Gaoithe , Lawlesstown , Clonmel
the proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited is to apply for a change of use for the existing 100 square metre cottage, which is a protected structure on the development from domestic to office use. Existing outbuildings and sheds are proposed to be demolished.
Ard Gaoithe , Lawlesstown , Clonmel
the erection of a 0.9m high masonry wall with 1m high palisade railing fixed on top, to boundaries of existing car park forming a new secure compound with new gate at existing entrance
Unit 3a Ard Gaoithe Business Park , Clonmel , Co. Tipperary
the construction of a boundary wall to existing parking area consisting of a 900 mm rendered blockwork wall including concrete cap with 1000mm decorative palisade type railing fixed on top, and the erection of a new security gate at existing property entrance and assoicated site works
Unit 3a Ard Gaoithe Business Park , Clonmel , Co. Tipperary
a power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex Building; 1 No. 120 MW Step-up transformer; Workshop/Stores Building; Administration Building; Radiator Coolers; Tank Farm comprising: 2 x Fuel Oil Storage Tanks, SCR reagent Tank, Lube Oil Storage Tank, Lube Oil Maintenance Tank, Lube Oil Disposal Tank, Pilot Oil Tank; Standby Generators; Cycle shed; Fire pump house, Firefighting water tank; Surface Water Attenuation Tank; Raw Water Storage Tank; Fencing; Car Park; Landscape planting around perimeter of site and all ancillary services. The plant is subject to a pollution control licence from the EPA
Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel
the construction of a wholesale warehouse including all associated site development works such as yards, carparking areas, fencing, lighting, drainage and access from the existing Ard Gaoithe Business Park road
Ard Gaoithe Business Park , Lawlesstown , Clonmel
development which will consist of: The power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex Building; 1 No. 120 MW Step-up transformer; Workshop/Stores Building; Administration Building; Radiator Coolers; Bunded Tank Farm comprising: 2 x Fuel Oil Storage Tank, SCR reagent Tank, Lube Oil Storage Tank, Lube Oil Maintenance Tank, Lube Oil Disposal Tank, Pilot Oil Tank; Cycle shed; Fire pump house, Firefighting water tank; Surface Water Attenuation Tank, Raw Water Storage Tank; Fencing; Car Park; Landscape planting around perimeter of site and all ancillary services
Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel
a new 2 storey R & D laboratory facility extension and link to existing vascular device facility and all associated site works. This application relates to a development which comprises or is for the purposes of an activity requiring an integrated pollution prevention and control license
Cashel Road , Lawlesstown , Clonmel
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?