Garrynagree , Ballingarry , Thurles
N/APlanning application 26158
Tipperary - Tipperary County Council
Proposed Development
renovation and alterations to an existing cottage, including internal alterations and provision of first floor accommodation within the existing roof space; removal of the existing entrance porch and provision of a new entrance canopy; installation of rooflights; replacement windows, entrance door and roof finish; removal of the internal chimney breast/flue while retaining the existing chimney stack above roof level; provision of a gravel driveway and parking area using the existing vehicular entrance; installation of a new on-site wastewater treatment system with soil polishing filter and a new private well; associated surface-water drainage, landscaping, roadside vegetation works to facilitate sightlines and all associated site works
Application Timeline
Application received
3 Nov 2026
Decision due (upcoming)
6 Jan 2027
Application Details
- Location
- Garrynagree , Ballingarry , Thurles
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.31 ha
Timeline
- Registration Date
- 3 November 2026Other applications received that week
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 6 January 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works
Garrynagree , The Commons , Thurles
a) an increase to the footprint of the substation compound of 381.6m2, b) an increase to the footprint of the substation building of 51.5m2, c) amendments to the layout of the offices and welfare facilities within the substation building, d) addition of 2 no. containers sized 6m by 2.43m by 2.59m in height for storage of parts and equipment during the operational phase, e) addition of 2 no. parking spaces and an extension of the access road, f) associated relocation of the permitted fence, g) amendments to the drainage design to accommodate changes to the layout, h) minor amendments to the red line of the permitted development to accommodate the above and i) addition of new joint bay
Coolnashinnagh , Ballingarry Thurles , Co. Tipperary
An amendment planning application for a planning application granted under reference PL/21/1620 in the townlands of Coolnashinnagh, Ardragh, Gortfee and Bolakeale, Co Tipperary. The previously consented planning application comprised the installation of 2.25 km of a 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated development. The proposed amendments to the previously consented grid connection comprise: • Increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays • Grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure • Minor Adjustments to the route and red line boundary Advisory Note: The full extent of the grid connection is 33.65 km, and a separate amendment planning application will be made for an underground grid connection to Kilkenny County Council.
Various townlands - Coolanshinnagh Ardragh Gortfree Bolakeale , , Co Tipperary.
a ten-year appropriate period planning permission for development of this site: the proposed development will constitute the provision of the following: the installation of 2.25 km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments. Advisory Note: The full extent of the grid connection is 33.8 km, and a separate planning application will be made for a underground grid connection to Kilkenny County Council. This development comprises part of an overall development for which planning permission was granted for a 9 turbine wind farm and all associated works on lands located in the townlands of Farranrory Upper, Farranrory Lower, Coolnashinnagh and Gortnasmuttaun, Co. Tipperary. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement
Coolanshinnagh Ardragh Gortfree Bolakeale , Co. Tipperary
a ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments in the townlands of Coolnashinnagh, Ardragh, Bolakeale & Gortfree, Co. Tipperary. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application will be made for an underground grid connection to Kilkenny County Council. This development comprises park of an overall development for which planning permission was granted for a 9-turbine wind farm and all associated works on lands located in the townlands of Farranrory Upper, Farranrory Lower, Coolnashinnagh & Gortnasmuttan, Co. Tipperary. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement
Coolnashinnagh Ardagh Gortfree and Bolakeale , Co. Tipperary
a temporary Meteorological Mast and associated site works that will operate for a further 3 years, it will retain its finished height not exceeding 80m above existing ground level consisting of a lattice tubular frame, guy wires and ancillary equipment
Farranrory Upper , Ballingarry , Co Tipperary
a temporary Meteorological Mast and associated site works that will operate for a further 3 years. The Meteorological Mast will retain its finished height not exceeding 80m above existing ground level consisting of a lattice tubular frame, guy wires and ancillary equipment
Farranrory Upper , BALLINGARRY , Co Tipperary
a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement
Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun , Co. Tipperary
to demolish existing farm buildings on site, build a 1.5 storey dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works
Kyleballygalvan , The Commons , Thurles
alterations to existing entrance including associated site works
Kyleballygalvan , The Commons , Thurles
Affected by this application?
Open for submissionsObservations close on Monday 7 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?