Planning application 2660834

Tipperary - Tipperary County Council

Proposed Development

RED III DEVELOPMENT - The development will consist of the construction of a solar photovoltaic (PV) energy development (renewable energy development) with a total site area of 151 hectares. The proposed development includes for the erection of solar panels on ground-mounted galvanised steel frames, 17 no. transformer units, a permanent operations compound, inverters, underground cabling and ducting, security fencing, pole mounted closed circuit television (CCTV) cameras, upgrade of 5 no. existing site entrances, construction of 1 no. new site entrance, internal site access tracks, landscaping, 1 no. temporary construction compound, 4 no. satellite compounds, temporary laydown areas and all associated development works. The operational lifespan of the solar PV development will be 40 years. The proposed development will incorporate a grid connection which will be subject to a separate planning application at a later date. The planning application is accompanied by a Natura Impact Statement This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Aug 2026

  2. Decision due (upcoming)

    22 Oct 2026

Application Details

Location
Monadreela Boscabell George’s-Land Brickendown Rathordan Kilscobin Kilconnell Mocklershill , Cashel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
151 ha

Timeline

Registration Date
28 August 2026
Status
PRE_VALIDATION
Decision
N/A
Decision Due
22 October 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2561099N/A31 Oct 2025

RED III development of a solar photovoltaic (PV) energy development (renewable energy development) with a total site area of 151 hectares. The proposed development includes for the erection of solar panels on ground-mounted galvanised steel frames, 17 no. transformer units, a permanent operations compound, inverters, underground cabling and ducting, security fencing, pole mounted closed circuit television (CCTV) cameras, upgrade of 5 no. existing site entrances, construction of 1 no. new site entrance, internal site access tracks, landscaping, 1 no. temporary construction compound, 4 no. satellite compounds, temporary laydown areas and all associated development works. The operational lifespan of the solar PV development will be 40 years. The proposed development will incorporate a grid connection which will be subject to a separate planning application at a later date. The planning application is accompanied by a Natura Impact Statement

Monadreela Boscabell George’s-Land Brickendown Rathordan Kilscobin Kilconnell Mocklershill , Cashel , Co. Tipperary

259m
18601164CONDITIONAL24 Sept 2018

erection of a bungalow, domestic garage, effluent treatment tank and percolation system, entrance and all associated ancillary works

Rathordan , Cashel , Co. Tipperary

808m
2560101CONDITIONAL14 Feb 2025

the construction of a dwelling, garage, entrance, waste water treatment system and all associated site development works

Rathordan , Cashel , Co. Tipperary

1.1km
2656CONDITIONAL8 May 2026

a detached domestic garage and including all associated site development works

Rathordan , Cashel , Co. Tipperary

1.1km
17601334N/A4 Dec 2017

retention of 1 no. over grounds tank for diesel fuel storage and 1 no fuel pump dispensing diesel and permission for erection to 1 no. totem sign.

Killistafford , Cashel , Co. Tipperary

1.1km
18600197CONDITIONAL19 Feb 2018

retention of 1 no. over ground tank for diesel fuel storage and 1 no fuel pump dispensing diesel and permission for the erection of 1 no. totem sign

Killistafford , Cashel , Co. Tipperary

1.1km
17600064CONDITIONAL31 Jan 2017

erection of an agriculture entrance to my lands, the removal of the entire roadside boundary ditches and replaced with hedges and timber fencing plus palisade fencing to match the existing on the west side of the development

Boscabell , Cashel , Co. Tipperary

1.2km
25244CONDITIONAL10 Dec 2025

the farm buildings as constructed including haybarn, cubicle sheds, dairy and milking parlour, calf sheds, silage slab, machinery shed, concrete apron and open slurry pit

Boscabell , Cashel , Co. Tipperary

1.2km
25240N/A1 Dec 2025

farm building as constructed including haybarn, cubicle sheds, dairy and milking parlour, calf sheds, silage slab, concrete apron and open slurry pit

Boscabell , Cashel , Co. Tipperary

1.3km
2360231CONDITIONAL10 Apr 2023

the construction of a cubicle shed with underground effluent tank and all associated site works. Retention Permission for a loose shed is also required

Monameagh , Cashel , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?