Rathordan , Cashel , Co. Tipperary
CONDITIONALPlanning application 2656
Tipperary - Tipperary County Council
Proposed Development
a detached domestic garage and including all associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
8 May 2026
Decision: CONDITIONAL
1 Jul 2026
Decision due
2 Jul 2026
Grant issued
4 Aug 2026
Application Details
- Location
- Rathordan , Cashel , Co. Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.44 ha
Timeline
- Registration Date
- 8 May 2026
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 1 July 2026
- Grant Date
- 4 August 2026
- Permission Expires
- 3 August 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of a dwelling, garage, entrance, waste water treatment system and all associated site development works
Rathordan , Cashel , Co. Tipperary
erection of a bungalow, domestic garage, effluent treatment tank and percolation system, entrance and all associated ancillary works
Rathordan , Cashel , Co. Tipperary
a dwelling, garage, entrance, waste water treatment system and all associated site development works
Ballyfowloo , Cashel , Co. Tipperary
a dwelling, garage, entrance, waste water treatment system & all associated site development works
Ballyfowloo , Cashel , Co. Tipperary
a dwelling, garage, entrance, waste water treatment system and all associated site development works
Ballyfowloo , Cashel , Co. Tipperary
RED III development of a solar photovoltaic (PV) energy development (renewable energy development) with a total site area of 151 hectares. The proposed development includes for the erection of solar panels on ground-mounted galvanised steel frames, 17 no. transformer units, a permanent operations compound, inverters, underground cabling and ducting, security fencing, pole mounted closed circuit television (CCTV) cameras, upgrade of 5 no. existing site entrances, construction of 1 no. new site entrance, internal site access tracks, landscaping, 1 no. temporary construction compound, 4 no. satellite compounds, temporary laydown areas and all associated development works. The operational lifespan of the solar PV development will be 40 years. The proposed development will incorporate a grid connection which will be subject to a separate planning application at a later date. The planning application is accompanied by a Natura Impact Statement
Monadreela Boscabell George’s-Land Brickendown Rathordan Kilscobin Kilconnell Mocklershill , Cashel , Co. Tipperary
change of design of the proposed dwelling and location of the proposed dwelling within the site as granted under Planning Application Reference Number 17600993 and all associated site development works
Ballyfowloo , Cashel , Co. Tipperary
to construct a dwelling, entrance, septic tank and percolation area and all associated works
Ballyfowloo , Cashel , Co. Tipperary
the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area
Junction 8 of the M8 Motorway , Wallers Lot , Cashel
development consisting of the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area
Junction 8 of the M8 Motorway , Wallers Lot , Cashel
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?