Proposed Development

The development will consist of a 10 year permission for the extension of the consented development under plan ref. 16/126 (ABP ref. PL93.2469020) for the construction of a Solar PV Energy development within a revised total site area of up to 45hA (an increase of 16.2hA), to include one single storey electrical sub-station building and associated compound, electrical transformer/inverter station modules, battery storage modules, solar PV panels ground mounted on steel support structures, storage containers, CCTV cameras, access roads, fencing and associated electrical cabling, ducting and ancillary infrastructure. The operational life of the development is to be 35 years.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Mar 2020

  2. Application withdrawn

    10 Mar 2020

Application Details

Location
Drumroe , Cappoquin , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
5 March 2020
Status
WITHDRAWN
Decision
N/A
Withdrawn
10 March 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
20357N/A17 Jun 2020

the development will consist of a 10 year permission for the extension of the consented development under plan ref: 16/126 (ABP ref: PL93.246902) for the construction of a Solar PV Energy development within a revised total site area of up to 43.9hA (an increase of 15.1hA), to include one single storey electrical substation building and associated compound, electrical transformer/inverter station modules, battery storage modules, solar PV panels ground mounted on steel support structures, storage containers, CCTV cameras, access tracks, fencing and associated electrical cabling, ducting and ancillary infrastructure. The operational life of the development is to be 35 years.

Drumroe , Cappoquin , Co Waterford

438m
17598CONDITIONAL16 Aug 2017

the construction of two-storey dwelling house, wastewater treatment system and percolation area, vehicular entrance and all ancillary works

Knockalahara , Cappoquin , Co. Waterford

540m
17550CONDITIONAL31 Jul 2017

to construct a one-and-a-half-storey extension to the side of dwelling , a single-storey extension to the rear, to renovate existing dwelling which will include raising part of the roof of the existing dwelling, replace the existing septic tank with a wastewater treatment system in accordance with the EPA Code Of Practice on single dwellings and all ancillary site works

Ballyhane (E.D. Modelligo) , Cappoquin , Co. Waterford

805m
2460296CONDITIONAL30 May 2024

to construct slatted shed with loose area and all associated site works

Clashnagoneen , Cappoquin , Co. Waterford

805m
2460269N/A17 May 2024

to construct slatted shed with loose area and all associated site works

Clashnagoneen , Cappoquin , Co. Waterford

882m
2360168CONDITIONAL2 May 2023

construction of (I) Milking parlour building incorporating holding yard with crush/ drafting yard, meal bin, Office, flow channel, storage rooms and plant rooms with underground effluent tanks (ii) New agricultural entrance with access roadway and hardcore area and all associated site works

Ballyhane , Cappoquin , Co. Waterford

1.0km
22677CONDITIONAL28 Jul 2022

continuance of use, indefinitely, of a commercial store with office and all ancillary works, as previously granted planning permission under Reference No. 17/338

Clashnagoneen , Cappagh , Co. Waterford

1.0km
17338CONDITIONAL18 May 2017

RETENTION for a change of use from an agricultural store to a commercial store with office and retention planning permission for a septic tank and all ancillary works

Clashnagoneen , Cappagh , Co Waterford

1.0km
20430N/A2 Jul 2020

to construct an extension to existing commercial unit with associated works at

Clashnagoneen , Cappagh , Co Waterford

1.0km
20565REFUSED17 Aug 2020

to construct an extension to existing commercial unit with associated works at

Clashnagoneen , Cappagh , Co Waterford

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?