← Back to search

Glendeish East , Lismore , Co. Waterford

CONDITIONAL

Planning application 2560072

Waterford - Waterford City and County Council

Proposed Development

Indefinite retention of garage location from that granted planning permission under reference 2460140

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Feb 2025

  2. Decision: CONDITIONAL

    2 Apr 2025

  3. Decision due

    6 Apr 2025

  4. Grant issued

    15 May 2025

Application Details

Location
Glendeish East , Lismore , Co. Waterford
Applicant
N/A
Application Type
RETENTION
Planning Authority
Waterford City and County Council
Site Area
0.4 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
10 February 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 April 2025
Grant Date
15 May 2025
Permission Expires
14 May 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2460655N/A7 Nov 2024

to relocate the garage from the location granted planning permission under reference 2460140 and associated works

Glendeish East , Lismore , Co. Waterford

0m
2460140CONDITIONAL24 Mar 2024

construction of a new single storey dwelling, garage, site entrance, waste water treatment system and all ancillary works

Glendeish East , Lismore , Co.Waterford

673m
18402CONDITIONAL8 Jun 2018

to construct Cubicle shed with slatted tank and loose straw area and all associated site works

Glendeish East , Lismore , Co. Waterford

715m
17408CONDITIONAL8 Jun 2017

the construction of a new storey and a half type house, a garage, a waste water treatment system and percolation area and an entrance along with all associated site works

Glendeish , Lismore , Co. Waterford

771m
1959CONDITIONAL6 Feb 2019

to revise dwelling location, increase roof height, alter fenestration, Chimney and Porch from that granted permission under planning reference 18/304 for two-storey dwelling

Glendeish East , Lismore , Co. Waterford

771m
18304CONDITIONAL3 May 2018

to construct a two storey dwelling, entrance, wastewater treatment system and ancillary works

Glendeish East , Lismore , Co. Waterford

807m
2560571CONDITIONAL19 Aug 2025

demolition of existing (i) 4no. weaner houses and tanks (ii) 2no. farrowing houses and tanks (iii) Storage shed and tank compound. Permission to construct (i) 2no. finishing houses with slatted tanks (ii) 1no. weaner house with slatted tank (iv) overground slurry storage tank with roof (v) Canteen/Office building with toilet, shower and kitchen (vi) a septic tank treatment system with a percolation area and all other associated site works to partially replace and adjoin an existing pig farm. This planning application is for the purposes of an activity which would require an Industrial Emissions Licence. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) have been submitted with the application

Glendeish West , Lismore , Co. Waterford

807m
2560562N/A14 Aug 2025

demolition of existing (i) 4no. weaner houses and tanks (ii) 2no. farrowing houses and tanks (iii) Storage shed and tank compound. Permission to construct (i) 2no. finishing houses with slatted tanks (ii) 1no. weaner house with slatted tank (iii) overground slurry storage tank with roof (iv) Canteen/Office building with toilet, shower and kitchen (v) a septic tank treatment system with a percolation area and all other associated site works to partially replace and adjoin an existing pig farm

Glendeish West , Lismore , Co. Waterford

1.1km
2161CONDITIONAL2 Feb 2021

a two storey dwelling house, garage/store, entrance, septic tank, percolation area and ancillary works

Glengarra , Lismore , Co. Waterford

1.3km
18415CONDITIONAL15 Jun 2018

to construct stables, sheep house, covered dungstead, soiled water tank, splayed entrance and all ancillary site works

Glengarra , Lismore , Co. Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?