Glendeish West , Lismore , Co. Waterford

N/A

Planning application 2560562

Waterford - Waterford City and County Council

Proposed Development

demolition of existing (i) 4no. weaner houses and tanks (ii) 2no. farrowing houses and tanks (iii) Storage shed and tank compound. Permission to construct (i) 2no. finishing houses with slatted tanks (ii) 1no. weaner house with slatted tank (iii) overground slurry storage tank with roof (iv) Canteen/Office building with toilet, shower and kitchen (v) a septic tank treatment system with a percolation area and all other associated site works to partially replace and adjoin an existing pig farm

View the full application file on the council's planning portal →

Application Details

Location
Glendeish West , Lismore , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Site Area
1.44 ha

Timeline

Registration Date
14 August 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560571CONDITIONAL19 Aug 2025

demolition of existing (i) 4no. weaner houses and tanks (ii) 2no. farrowing houses and tanks (iii) Storage shed and tank compound. Permission to construct (i) 2no. finishing houses with slatted tanks (ii) 1no. weaner house with slatted tank (iv) overground slurry storage tank with roof (v) Canteen/Office building with toilet, shower and kitchen (vi) a septic tank treatment system with a percolation area and all other associated site works to partially replace and adjoin an existing pig farm. This planning application is for the purposes of an activity which would require an Industrial Emissions Licence. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) have been submitted with the application

Glendeish West , Lismore , Co. Waterford

807m
2560072CONDITIONAL10 Feb 2025

Indefinite retention of garage location from that granted planning permission under reference 2460140

Glendeish East , Lismore , Co. Waterford

807m
2460655N/A7 Nov 2024

to relocate the garage from the location granted planning permission under reference 2460140 and associated works

Glendeish East , Lismore , Co. Waterford

807m
2460140CONDITIONAL24 Mar 2024

construction of a new single storey dwelling, garage, site entrance, waste water treatment system and all ancillary works

Glendeish East , Lismore , Co.Waterford

881m
2161CONDITIONAL2 Feb 2021

a two storey dwelling house, garage/store, entrance, septic tank, percolation area and ancillary works

Glengarra , Lismore , Co. Waterford

1.0km
18415CONDITIONAL15 Jun 2018

to construct stables, sheep house, covered dungstead, soiled water tank, splayed entrance and all ancillary site works

Glengarra , Lismore , Co. Waterford

1.0km
23289CONDITIONAL13 Oct 2023

to retain the sand arena indefinitely and the existing structure for use as an office until new office is constructed and PLANNING PERMISSION to construct an agricultural building to provide hay and straw storage, foaling boxes, loose straw bedded house for horses, an office with toilet facilities and all ancillary site works

Glengarra , Lismore , Co. Waterford

1.3km
17408CONDITIONAL8 Jun 2017

the construction of a new storey and a half type house, a garage, a waste water treatment system and percolation area and an entrance along with all associated site works

Glendeish , Lismore , Co. Waterford

1.3km
20651REFUSED15 Sept 2020

for construction of an access roadway around the perimeter of the site serving existing racetrack for emergency service vehicles and track maintenance vehicles and all ancillary works at

Feagarrid , Ballysaggart , Lismore

1.3km
18402CONDITIONAL8 Jun 2018

to construct Cubicle shed with slatted tank and loose straw area and all associated site works

Glendeish East , Lismore , Co. Waterford

The submission window has closed

Observations on this application closed on Wednesday 17 September 2025, five weeks after it was received. The authority cannot accept a late submission.