← Back to search

Unit 301 IDA Industrial Park , Cork Road co. Waterford , Waterford Ireland

CONDITIONAL

Planning application 2560527

Waterford - Waterford City and County Council

Proposed Development

the demolition of existing store (39.2 sq.m) and existing shelter (61.1 sq.m) on the West Elevation and existing plant enclosure (75 sq.m) to the North of Unit 301. The construction of a new 308 sq.m single storey Warehouse Extension (7.91 metres high) and a new 35.76 sq.m stand-alone Laboratory Consumables Store (5.5 metres high) complete with all associated site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jul 2025

  2. Decision: CONDITIONAL

    18 Sept 2025

  3. Decision due

    22 Sept 2025

  4. Grant issued

    23 Oct 2025

Application Details

Location
Unit 301 IDA Industrial Park , Cork Road co. Waterford , Waterford Ireland
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Site Area
0.328 ha

Timeline

Registration Date
29 July 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 September 2025
Grant Date
23 October 2025
Permission Expires
22 October 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560511N/A24 Jul 2025

the construction of a new single storey Warehouse Extension and a new stand-alone Laboratory Consumables Store complete with all associated site works and services a

Unit 301 IDA Industrial Park , Cork Road co. Waterford , Waterford Ireland

72m
17888CONDITIONAL21 Dec 2017

the proposed construction of a new 265.8m2 single storey warehouse extension (7.39 metres high to match existing parapet height) to the western end of the existing Unit 301, to include alterations to external western elevation with proposed Kingspan cladding to match existing, together with all associated site works

Teva Pharmaceuticals Ireland , Unit 301 IDA Industrial Estate , Cork Road

120m
17211CONDITIONAL31 Mar 2017

the construction of a new 10.8m2 external oil tank compound with rendered blockwork walls to match existing bin store to the front of existing building

Teva Pharmaceuticals Ireland , Unit 301 IDA Industrial Estate , Cork Road

172m
21428CONDITIONAL14 May 2021

to install 1,600msq of roof mounted Solar PV Panels to both sides of 3 No. pitched roofs in 3 No. arrays, together with handrail at roof edge of eaves level, surrounding panels and all associated site development works

Keltech , Waterford Industrial Estate , Cork Road

172m
20911CONDITIONAL4 Dec 2020

for a single storey warehouse extension located between existing Keltech buildings over their existing car park with all ancillary site development works at

Keltech , 37-38 Waterford Industrial Park , Cork Road

174m
20371CONDITIONAL19 Jun 2020

single storey warehouse extension to rear (South) over existing open yard area, together with all associated site development works all

Keltech , 37-38 Waterford Industrial Park , Cork Road

174m
20266CONDITIONAL11 May 2020

single storey warehouse extension to rear (South) over existing open yard area, together with all associated site development works all at

Keltech Ltd , 37-38 Waterford Industrial Park , Cork Road

205m
22657CONDITIONAL21 Jul 2022

a) Internal alterations at first floor level of Building B to form additional floor space (319m2) including installation of associated rooflights; b)Alterations to existing East (Rear) Elevation at second floor level of Building B incorporating installation of windows in existing external wall to existing storage/office space; c) Erection of an external walkway (24m2) at second floor level to link Building B & C together with installation of external door to access same from Building B; all together with associated works

Jabil Healthcare , Unit 210 IDA Waterford Industrial Park , Cork Road

206m
2360601CONDITIONAL11 Dec 2023

a) Internal alterations at first floor level of Building A to form additional floor space (616m2) including installation of associated rooflights & external windows; b) construction of a new entrance lobby (5.90m2) and first floor link corridor to Building A (112m2); c) internal alterations to Building A to accommodate improved stair and lift access; d) together with associated site works including installation of 6 No. material feed silos

Jabil Healthcare , Unit 210 IDA Waterford Industrial Park , Cork Road Waterford

207m
2560184CONDITIONAL25 Mar 2025

a single storey Plant Room extension to the rear [east ] of the existing building inclusive of all associated ancillary works and associated site works at

Unit 210 , IDA Waterford Industrial Park , Cork Road Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?