← Back to search

Bishopscourt , Grantstown , Waterford

CONDITIONAL

Planning application 2660055

Waterford - Waterford City and County Council

Proposed Development

Single storey dwelling, effluent treatment system & percolation area, vehicular entrance and all associated siteworks

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jan 2026

  2. Decision: CONDITIONAL

    25 Mar 2026

  3. Decision due

    26 Mar 2026

  4. Grant issued

    1 May 2026

Application Details

Location
Bishopscourt , Grantstown , Waterford
Applicant
N/A
Application Type
PERMISSION CONSEQUENT
Planning Authority
Waterford City and County Council
Site Area
0.34 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
30 January 2026
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 March 2026
Grant Date
1 May 2026
Permission Expires
30 April 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360504CONDITIONAL19 Oct 2023

Dormer style dwelling, effluent treatment system & percolation area, vehicular entrance & all associated siteworks

Bishopscourt , Grantstown , Waterford

36m
2360480CONDITIONAL13 Oct 2023

Dormer style dwelling, effluent treatment system & percolation area, vehicular entrance & all associated siteworks

Bishopscourt , Grantstown , Waterford

166m
18761CONDITIONAL9 Nov 2018

to construct a 2 storey residence, new garage, open new road entrance, install new waste water treatment system and complete all other ancillary site development works

Kilcaragh Cross Roads , Bishopscourt , Waterford

186m
22673CONDITIONAL27 Jul 2022

the construction of a new dormer bungalow, detached single storey garage/store, waste water treatment system & percolation area, together with new site entrance and driveway and all associated works

Bishopscourt , Grantstown , Waterford

392m
18459REFUSED5 Jul 2018

a single storey fully serviced detached dwelling with attic together with all associated site works to include new shared vehicular access/driveway, paddocks, detached garage, landscaping, boundary treatments, proprietary treatment system and percolation area, proposed well

Bishopscourt , Grantstown , Waterford

436m
191003N/A23 Dec 2019

to construct two cattle underpasses. No. 1 beneath the public road L8053, adjacent to farm entrance. No. 2 beneath the public road L4066 together with associated site works

Kilcaragh , Grantstown , Co. Waterford

438m
2093N/A17 Feb 2020

to construct two cattle underpasses. No. 1 beneath the public road L8053, adjacent to farm entrance. No. 2 beneath the public road L4066 together with associated site works

Kilcaragh , Grantstown , Co. Waterford

505m
22868CONDITIONAL11 Oct 2022

the installation of 1 no. prefabricated temporary structure consisting of 2 no. classrooms, 2 no. toilets and circulation space together with all associated site works

Gaelcholaiste Phort Lairge , Bishopscourt , Ballygunner

507m
21313CONDITIONAL19 Apr 2021

retention permission and planning permission at a 2.22 hectare site, retention permission is sought for 2 no. prefabricated units (these 2 no. units form part of the overall 12 no. units on site which were permitted under Reg. Ref: 16/642) for use as part of the existing school, of which 11 no. units were constructed on site. The 2 no. units are replacements for 2 no. units previously permitted under Reg. Ref. 16/642 following irreparable storm damage to the original 2 no. units. Retention permission is also sought, for a temporary period of 5 years, for prefabricated unit no. 13 to the north east of the site entrance, for use as a school classroom. Permission is sought for temporary permission for a period of five years for the extension of the permission previously granted under Reg. Ref. 16/642 for prefabricated single storey buildings comprising of 12 no. classrooms and associated toilet blocks, locker room and store rooms, administration office, staff room and reception, translucent canopy and extension to the existing canopy over existing units nos. 3, 4, 5, 11 and proposed unit no. 12 and all existing associated site works, including site entrance, realigned roadside boundary, new footpath from the entrance gate to the school buildings, foul pumping station, storm attenuation system, car parking, fencing, connections to existing services and all associated and ancillary works.

Gaelcholaiste Phort Lairge , Bishopscourt , Ballygunner

507m
2560541CONDITIONAL1 Aug 2025

1. The demolition of 1152.9 sq.m temporary educational facility consisting of prefabricated single storey buildings, comprising of 14 classrooms, 1 staff room, administration offices, toilet blocks, vehicular and pedestrian access gates, signage, car park, footpath and astro turf pitch. 2. The demolition of 77sq.m of a temporary creche facility comprising of prefabricated single storey building with outdoor play area. 3. The construction of a new standalone 5,573sq.m post primary school. Accommodation provides for 2 classroom special education needs unit with all associated facilities, 12 general classrooms, 1 multimedia room, 1 music room, 1 textile room, 1 design room, I graphics room, 2 science laboratories with associated preparation room, 1 engineering room, 1 construction studies with associated preparation room, 1 art room with associated project store, 1 home economics room, 1 library, 1 general purpose hall, 1 staff room, 1 kitchenette, 3 SET Rooms, 7 administrative rooms, 1 multi use hall and associated PE store, 1 fitness suite, 2 changing rooms, ancillary accommodation and circulation. 4. Realignment of roadside boundary, reconfiguration of existing entrance egress, construction of a new pedestrian path, cycle path, new entrance access road, front boundary wall with signage, 2 No. gates, a public drop-off area and 1 no bus stop. 5. Construction of a new internal carriageway, car park with 48 no. car park spaces, parent drop off area, 70 no. cycle space, 4 No bus drop off, 2 No special education needs unit drop off and new signage above the main building entrance. 6. Construction of ESB substation, switch room, foul pump station, bio retention soakway, LPG area, bin store, external store, covered yard, heat pump compound, 3 ball courts, 1 Astro turf pitch, all associated ancillary site development, drainage, fencing and landscape works.

Gaelcholáiste Phort Láirge , Bishopscourt , Ballygunner Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?