Proposed Development

a 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Jul 2023

  2. Further information requested

    31 Aug 2023

  3. Further information received

    22 Feb 2024

  4. Decision due

    20 Mar 2024

  5. Decision: CONDITIONAL

    20 Mar 2024

  6. Grant issued

    23 Apr 2024

Application Details

Location
Townlands of Killinskyduff Templerainy Johnstown South and Johnstown North , Arklow , County Wicklow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Wicklow County Council
Site Area
2.6 ha

Timeline

Registration Date
14 July 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 March 2024
Grant Date
23 April 2024
Permission Expires
22 April 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

53m
171497CONDITIONAL19 Dec 2017

solar farm within a site area of approximately 39 hectares consisting of solar photovoltaic panels covering an area of up to 27.2 ha on ground mounted steel frames, 1 no on site substation, 8 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years

Johnstown North , Co. Wicklow

179m
2360185CONDITIONAL27 Jul 2023

to amend the design of the approved development (Planning Reference: 17/1497) which comprises a Solar PV Energy Development. Proposed amendments include (1) change in location and size of substation, (2) two additional temporary construction compounds will be located at the site entrances, (3) the number of modules will decrease, (4) the number of pile driven poles will decrease, (5) the size and number of transformer stations will increase, (6) the total fencing area will increase (7) the total amount of fencing posts will increase, (8) up to 21 CCTV cameras will be installed (9) access tracks will be optimised and increased in width and length, and (10) increase in operational lifetime from 25 years to 35years

Lands within the townland of Johnstown North , Co. Wicklow

509m
20156CONDITIONAL18 Feb 2020

demolition of existing storage shed, a new shed to serve as house ancillary storage and hobby shed to store vintage cars and associated site development works

Johnstown North , Arklow , Co. Wicklow

509m
19412N/A17 Apr 2019

demolition of existing storage shed, a new storage shed and associated site development works

Johnstown North , Arklow , Co. Wicklow Y14FH01

512m
19388N/A10 Apr 2019

demolition of existing storage shed, a new storage shed and associated site development works

Johnstown North , Arklow , Co. Wicklow

515m
23752CONDITIONAL6 Oct 2023

demolition of existing single storey shed and garage to rear, construction of new part single storey part storey and a half extension containing 2 dormer windows to rear, removal of existing septic tank and new replacement proprietary effluent treatment system and all associated site works

Sparrows Den , Johnstown North , Arklow

694m
211335CONDITIONAL5 Nov 2021

construction of a bungalow with garage and car port, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works

Johnstown South , Arklow , Co. W icklow

833m
2560361REFUSED15 May 2025

period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this application

Townland of Ballymoney , Arklow , Co. Wicklow

880m
2560271CONDITIONAL10 Apr 2025

construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works

Johnstown South , Arklow , Co. Wicklow

893m
2360233N/A23 Aug 2023

the construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works

Johnstown South , Arklow , Co Wicklow