Proposed Development

the installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison complex, together with ducting, underground electrical cabling, and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Shelton Abbey Open Prison , Arklow , Co. Wicklow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Wicklow County Council
Site Area
0.56 ha

Timeline

Registration Date
27 October 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
2360416N/A16 Nov 2023

the installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing complex, together with ducting, underground electrical cabling, and all associated site works The proposed development is within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028.

Shelton Abbey Open Prison , Arklow , Co. Wicklow

11m
2360437CONDITIONAL22 Nov 2023

the installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison, together with ducting, underground electrical cabling, and all associated site works The proposed development is considered to be within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028. The proposed solar array installation will have no impact on the protected structure, located over 330.00 meters away from the proposed site.

Shelton Abbey Open Prison , Arklow , Co. Wicklow

278m
SI202102N/A22 Jan 2021

development primarily comprises the demolition of existing structures on site and the provision of a substation compound along with associated and ancillary works and is described as follows: The existing structures on site to be demolished comprise 4 no. industrial commercial buildings, an associated hut/outbuilding, a gas enclosure, and a tank with bund wall. The remains of a previously demolished building, areas of hard standing, and existing surface treatments will also be removed as part of the site clearance works. The proposed substation compound is subdivided into two parts. The northern part of the compound will accommodate a two storey 110kV GIS substation building (with gross floor are of c. 1,377 sqm). The southern part of the compound will accommodate four transformers and a single storey client control building (with a gross floor area c. 416sqm) and associated underground services. Both parts of the substation compound will be enclosed within 2.6metre high security fencing. The overall compound will be enclosed with a property fence 1.4 metre height. The development includes access paths, landscaping, security fencing, provision of access roads, car parking within the GIS substation compound, provision of a rural supply electricity connection (connecting to existing electrical services to the east of the proposed substation compound ) for the GIS substation building, a unit substation, lightning masts, drainage and attenuation systems, services, and all associated construction works, and all ancillary works

Avoca River Park , Arklow , Co. Wicklow

364m
23320CONDITIONAL30 Mar 2023

for proposed change of use from industrial/warehouse to plastics recycling facility and associated works

Avoca River Park , Arklow , Co. Wicklow

480m
201247N/A8 Dec 2020

1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev

Avoca River Park , Shelton Abbey & Kilbride , Arklow

487m
201285CONDITIONAL15 Dec 2020

1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev

Avoca River Park , Shelton Abbey & Kilbride , Arklow

493m
22601CONDITIONAL3 Jun 2022

as constructed weighbridge office extension, PRR 20/1282 and all associated site works

Avoca River Park , Glenart , Arklow

498m
181453N/A21 Dec 2018

detached two storey office building (249 sqm) detached timber factory building with canteen, wcs and first floor office (1432 sqm) and detached timber factory building with mezzanine office / wcs / canteen (1476 sqm). Site layout to include 30 no car parking spaces, 20 no cycle spaces, bin storage area, 3 no vehicular entrance gates, boundary fence, wastewater treatment system and associated site works

Avoca River Park , Arklow , Co. Wicklow

512m
1954CONDITIONAL22 Jan 2019

detached two storey office building (249 sqm) detached timber factory building with canteen, wcs and 1st floor office (1432 sqm) and detached timber factory building with mezzanine office / wcs / canteen (1476 sqm), site layout to include 3 no yard areas, 30 no car parking spaces, 20 no cycle spaces, 2 no bin storage area, 3 no vehicular entrance gates, boundary fence, wastewater treatment system and associated site works

Avoca River Park , Glenart , Arklow

530m
201285CONDITIONAL15 Dec 2020

1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev

Avoca River Park , Shelton Abbey & Kilbride , Arklow

The submission window has closed

Observations on this application closed on Thursday 30 November 2023, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?