91.2-hectare solar farm proposed at Grangeford Old and Friarstown, Ireland, Co. Carlow
11 December 2023 · Permission.ie Planning Wire · from the Carlow County Council planning register · published 15 September 2026
An applicant lodged plans with Carlow County Council on 11 December 2023 for a 91.2-hectare solar farm at Grangeford Old and Friarstown, Ireland. The application seeks a 10-year permission and an operational life of 40 years.
Key facts
- Reference
- 2360290
- Planning authority
- Carlow County Council
- Location
- Grangeford Old and Friarstown, County Carlow, Ireland
- Received
- 11 December 2023
- Application type
- PERMISSION
- Site area
- 91.2 hectares
- Permission sought
- 10 years
- Operational life
- 40 years
- Status
- INCOMPLETED APPLICATION
- Submissions until
- 23 January 2024 (closed)
In context
It is one of 2 solar farm applications Carlow County Council has received in the past twelve months, against 349 nationally. Of the 572 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Carlow County Council register. This is the source for every figure in the story above.
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "91.2-hectare solar farm proposed at Grangeford Old and Friarstown, Ireland, Co. Carlow", 11 December 2023. https://www.permission.ie/news/carlow-county-council/2360290
<p>Source: <a href="https://www.permission.ie/news/carlow-county-council/2360290">91.2-hectare solar farm proposed at Grangeford Old and Friarstown, Ireland, Co. Carlow</a>, Permission.ie analysis of the national planning register, 11 December 2023.</p>
Map, site boundary, timeline and nearby applications for 2360290.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Carlow the week it appears.
Set up alerts