Every planning application in Ireland that mentions solar in the development description -- from utility-scale solar farms to rooftop panels included in house extensions. Many domestic rooftop installations are exempt from planning permission entirely under SI 493/2022, so the register captures the larger or non-exempt projects.

Thinking of going solar yourself? For panel costs, SEAI grants, and installer guidance, see SolarInfo.ie.

1,596

Applications (3 years)

908

Granted

88

Refused

600

Pending / Other

The 250 most recent solar energy applications. Click a marker to open the application record.

Weekly planning alerts for Solar Energy sector -- coming soon

Be emailed when new applications are lodged in Solar Energy sector. Free. Join the list and you'll be first in when it launches.

Latest Solar Energy Applications

Matched where the development description mentions solar. Every application links to its full record -- address, decision dates, and council file -- free.

ED26/0086Officer Allocation

Proposed development consists of: a) The extension of the existing gravel car park from 1895m2 to 2973m2 b)The creation of an accessible compacted gravel pedestrian pathway around the new all-weather pitch c)The introduction of 1.1m low level solar bollard lighting around the perimeter of the pedestrian pathways d)The creation of 2 no. covered seating/picnic areas with picnic benches and demountable umbrellas/canopies. e)The creation of an enclosed children's play area, and all associated site works.

St. Finians Gaa Club, Aylmer Road, Newcastle, Co DublinSouth Dublin County Council
20 Aug 2026
2660633N/A

for the installation of solar panels on a steel frame structure within an existing telecommunications compound (panels to cover an area of approximately 32 sq.m., to a height not exceeding 4.0 metres above ground level). Works to include all ancillary development works.

ESB Telecoms Ltd Telecommunications Compound , ESB's Waterford Gracedieu Regional Office , Gracedieu Road WaterfordWaterford City and County Council
20 Aug 2026
2660261N/A

a 10 Year Planning Permission with an operational lifespan of 40 years, for development in the townlands of, Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh, Rathcline, Lisnacush, Carrigeens, Carrowroe and Aghaloughan, County Longford. The grid connection route (subject to a separate future planning application to An Coimisiún Pleanála) will be in the townlands of Aghamore and Lanesborough. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application is subject to a completeness check under section 37JA of the Planning and Development Act 2000, as amended by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The development consists of: a solar farm with a total area of circa 146.93 ha. The proposed solar farm development spans a total site area measuring circa 96.3ha. The export capacity to the grid is estimated to be up to 85 MW. The proposed development will consist of a solar farm comprising of: • Installation of approximately 49.1 ha (approximately 910,650 sqm solar PV panel arrays, to include approximately 491,270 sqm of ground-mounted panels supported by steel frame structures, and the remaining area as solar array row spacing. • Construction of 24 MV stations. • A 110 kV on-site substation (0.7 ha) and approximately 1.7 km of underground cabling to connect to the national grid (subject to a separate future planning application to An Coimisiún Pleanála). The grid connection route will be in the townlands of Aghamore and Lanesborough. • Installation of underground cabling and ducting, comprising approximately 3.13 km along the public roads R392, L1168, L5264 and L1164. • Provision of two temporary site compounds, welfare facilities and materials storage areas. • Provision of seven temporary laydown areas for materials storage and welfare units (portaloos). • Construction of approximately 8.9 km of internal access tracks throughout the site. • Erection of 19 no. pole mounted, inward facing CCTV cameras for site monitoring across the proposed development. • Construction and operational access via existing entrances on the R392, L5264 & L1164

Commons North Gorteengar Tullyvrane Knock Lisrevagh Rathcline Lisnacush Carrigeens Carrowroe and Aghaloughan , Co. LongfordLongford County Council
19 Aug 2026
SD26B/0377WValid

The replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chimney to the front. Other works include a replacement porch canopy to the front entrance; modifications to window openings on the west-facing side gable, along with a new window; provision of a new window and a new ground floor door on the east-facing gable; external insulation to the front, sides and rear of the property; internal modifications to the existing house; external landscaping, including modifications to boundary walls and railings, widening the driveway entrance, a proposed shed; and miscellaneous other works. To the ground floor rear, the existing pitched roof kitchen will be demolished and a mono-pitch extension built to the rear / side.

18, Berryfield, Finnstown Priory, Lucan, K78 EW70South Dublin County Council
19 Aug 2026
2660536N/A

for development which will consist of the installation of a rooftop solar photovoltaic system on the roofs of Bay 42 and Bay 43 within Block U, 40 47, and the Warehouse and Office Building within the EI Unlimited Company premises. The development will have an approximate capacity of 505 kWp DC and 400 kW AC, comprising approximately 1,010 photovoltaic panels, with an approximate installation area of 9,640.68 square metres, equivalent to approximately 0.964 hectares, together with associated mounting systems, electrical cabling, connection to the existing on site electrical infrastructure, ancillary electrical equipment and all associated site development works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

EI Electronics Unlimited Company , Shannon Free Zone , Drumgeely Townland ShannonClare County Council
18 Aug 2026
2661039N/A

the proposed development consists of: A) Treatment Process Upgrades: i) Introduction of tertiary treatment on final water to improve water quality, comprising activated carbon dosing, a contact tank, a batching system, and dual storage silos; ii) Interconnecting pipelines; and iii) Sludge Treatment Enhancements comprising: a) Construction of two new washwater recovery tanks; b) Installation of new sludge pumps, return pipelines and decant systems; c) Construction of a new sludge thickening tank; d) Installation of a second sludge plate press and upgraded feed pumps; e) Extension of the sludge dewatering building; f) Replacement and upsizing of sludge pipelines. B) General Site Improvements: i) Upgrades to walkways, stairs, footpaths, and general safe access areas; ii) Improved chemical storage facilities (additional tank) with enhanced ventilation and heating; iii) Refurbishment of the backwash/blower room and relocation of electrical panels; iv) Installation of ground mounted and rooftop solar PV panels to reduce energy consumption and enhance sustainability; and v) Demolition of existing flocculation tank

Staleen Water Treatment Plant , Stalleen , Donore Co. MeathMeath County Council
18 Aug 2026
SD26A/0199WValid

St. Finian's GAA Club Newcastle intend to apply for Permission for development will consist of: The extension of the existing gravel car park from 1895m2 to 2973m2 and the creation of an accessible compacted gravel pedestrian pathway around the new all-weather pitch. The introduction of 1.1m low level solar bollard lighting around the perimeter of the pedestrian pathways and the creation of 2no. covered seating/picnic areas with picnic benches and demountable umbrellas/canopies with the creation of an enclosed children's play area, and all associated site works.

St. Finian's GAA Club, Aylmer Road, Cornerpark, Newcastle, D22 XA71South Dublin County Council
18 Aug 2026
2660625N/A

development will consist of demolition of existing supermarket with ancillary off-licence (1711sqm) and construction of a new supermarket with ancillary off-licence (2571.8sqm) and reconfiguration of car parking to include 77no. car parking spaces (in lieu of 126no. existing car parking spaces) with access from existing vehicular access from R675, standalone ESB substation (25.8sqm), new plaza with pedestrian access from R675, hard and soft landscaping, service / delivery area, plant compound, bicycle parking, trolley bays, totem sign, building mounted signage, PV solar panels and all associated site and development works

Tramore Rd , Priorsknock , WaterfordWaterford City and County Council
18 Aug 2026
26/2143Awaiting Recommendation

Amarenco Solar Inniscarra Limited intend to apply for planning permission for development of lands (c. 7.5ha) at Curraleigh, Inniscarra, Co. Cork. The development will consist of: A 10-year permission for a solar farm and Battery Energy Storage System (BESS) facility within a total development area of 7.5ha comprising: i) photovoltaic panels on ground-mounted frames. The solar panels are arranged within a site area of c. 7.402 ha, with an expected lifespan of 40 years. The proposed development represents an extension to the solar farm previously permitted under Reg Ref. No.’s 15/06625, 21/04505, and 22/04909. ii) 1 no. single-storey solar PV transformer station, iii)12 no. single-storey BESS containers arranged within a site of c. 0.098 ha, iv) 1 no. single-storey BESS Transformer, v)1 no. single-storey Power Conversion System Skid (PCS Skid), vi)1 no. single-storey spare parts storage container, vii) internal access tracks, fencing, CCTV, landscaping, and all associated site and development works. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.

Curraleigh, Inniscarra, Co. CorkCork County Council
14 Aug 2026
2660296N/A

Permission for development which consists of: THE DEVELOPMENT WILL CONSIST OF demolition of an existing 3 storey rear extension and construction of a two storey rear extension and minor internal and external alterations to the main house. Alterations to a rear two storey mews building fronting onto Palmyra Avenue to include partial change of use to habitable accommodation, external alterations to include provision of two new window/door openings, a replacement roof and floor structure, rear roof mounted solar panels, lime plaster to external walls and other minor internal and external alterations and all associated works

9 The Crescent , Galway , IrelandGalway City Council
14 Aug 2026
2660943N/A

a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total area of 245.33 ha, 70.01 ha of which lies within Co. Limerick. The application seeks a 10-year permission with an operational lifetime of 40 years and comprises the following – i. Construction and operation of up to 219,706.1sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. iii. Up to 8 no. electrical inverter / transformer skid units. iv. Construction and operational access to the site by 3 no. site entrances using existing field access points. v. 2 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. vi. Customer substation compound consisting of a single storey substation customer building with welfare facilities (217 sqm), all associated electrical plant and apparatus, underground cabling, lighting columns, parking, storage, fencing, wastewater holding tank and rainwater harvesting tank. vii. 33kV collector cable network, joint bays and associated works. viii. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. ix. The decommissioning and reinstatement of the solar farm at the end of its operational life. The elements of the Proposed Project located in Co. Limerick, as described above in i – ix, are the subject of this planning application. The remaining elements, including the construction of up to 541,306.68 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres, internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units, up to 19 no. electrical / inverter transformer skid units, construction and operational access to the site by 6 no. site entrances, using 4 no. existing field access points and 2 no. new access points, 3 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project, 33kV collector cable network, joint ba

Ballygoghlan , Glin , Co. LimerickLimerick County Council
14 Aug 2026
26/2135Awaiting Recommendation

Permission to install a 100% renewable energy ground mounted solar array consisting of 1261 no. solar PV panels (750kWp) and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.

Derrynanool, Mitchelstown, Co.CorkCork County Council
13 Aug 2026
26/2133Awaiting Admin Validation

We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210ha of solar panels fixed on ground-mounted frames or precast concrete solar panel footings, gabion basket, or ballasted solutions. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning application for the on-site 220kV AIS Substation and loop in Gri

Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen, Cornaveigh,, Cork, IrelandCork County Council
13 Aug 2026
2660416N/A

Retention Permission & Permission to (1) retain a replacement roof, incorporating a change of materials to slate tiles, to an existing single storey dwelling; (2) retain the temporary placement of a mobile home with wastewater capture system, for a period not exceeding 18 months, providing owners accommodation during the period of construction; and (3) retain a temporary ground mount solar PV array, with solar PV equipment storage, for a period not exceeding 18 months; and secondly to apply for planning Permission to (4) perform external and internal restorative works to an existing single storey dwelling. The works will incorporate window and door replacement and renewal of the external render; (5) the installation of a permanent ground mount solar PV array, with equipment storage, as the source of the primary electrical supply to the properties and all ancillary site development works in support of above at

Clooncan , Ballinlough , Co. Roscommon.Roscommon County Council
13 Aug 2026
26/2110Awaiting Validation SRO

We, The Irish Heritage Trust, intend to apply for Permission for development of this site at Fota House, Foaty, Carrigtwohill, Co. Cork _____________________________________________________________ The development will consist of: Installation of a ground mounted Photovoltaic (PV) array of approximately 82m2 and associated below ground cabling into Fota House, and installation of air-to-water mono-bloc heat pumps, on a concrete pad in rear yard connected to the existing boiler room and all associated ground works, at Fota House, Carrigtwohill, Co. Cork by the Irish Heritage Trust. Fota house is a Protected Structure: PS 504. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of – (a) 5 weeks, or (b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump, (c) beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions, or may refuse to grant permission. Signed: ___________________________________________________ AGENT: Oisin Creagh Dip Arch BArch Sc FRIAI G1 - DESIGN FORUM ARCHITECTS Date of erection of site notice: 11th June 2026___________________________________

Fota House, Carrigtwohill, County Cork, T45 Y642Cork County Council
10 Aug 2026
2661486N/A

INSTALLATION OF AN ELECTRONIC COMMUNICATIONS STRUCTURE COMPRISING OF A 12-METRE-HIGH TIMBER POLE SUPPORTING 4 NO. RADIO-LINK DISH, TOGETHER WITH 1.2-METRE-HIGH WOODEN POST AND RAIL FENCE WITH ACCESS GATE, SOLAR PANELS, DUAL BAY CABINET, FIBRE CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED

LANDS AT , OWEY ISLAND , CO. DONEGALDonegal County Council
10 Aug 2026
2660422N/A

to construct 3 no. (100sqm) agricultural sheep sheds, with solar panels located on the roof of each structure (300sqm total) and all associated site works

Lynn Road , Mullingar , Co. WestmeathWestmeath County Council
10 Aug 2026
2660918N/A

a 10-year planning permission for the development of a solar farm on a site of 210 hectares consisting of the following: 843,000 sqm of solar photovoltaic panels on ground mounted steel frames; 29 no. hardstanding locations used for electrical skids; 3 no. electrical plant rooms; new internal access tracks; underground power and communications cables and ducts, including along the R513 and L1509 public roads; new access points from the R513, R516, L1509 and L51309 public roads, and upgrades to existing access points from the L1507, L1509 and L51309 public roads; landscaping and biodiversity enhancement measures; security gates; boundary fencing and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. The planning application is accompanied by a Natura Impact Statement. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Townlands of Ballyhaukish Millfarm Coolscart Gotoon Coolalough Ballycahill Newtown Kilfrush and Knocklong , Co. LimerickLimerick County Council
10 Aug 2026
2660709N/A

RED III application Level 5 - installation of wall mounted photovoltaic (PV) solar panels (2.7kWp) to the rear elevation of the existing dwelling together with all associated site works

17 Wyvern Square , Bray , Co. WicklowWicklow County Council
10 Aug 2026
2661362N/A

A 10-year planning permission for the development of a solar farm on a site of 239 hectares consisting of the following: 1,031,319 sq. m. of solar photovoltaic panels on ground mounted steel frames; 32 no. MV stations on associated hardstanding; new internal access tracks; underground cabling and ducting including along public roads L7138, L7141, L3110, L7140, L31085, L3108, L7132, L7131, and L7129; new access points onto public roads L7138, L3110, L7141, L7129, L71383, and upgrades to existing access points are proposed on public roads L7141, L3110, L7140, L7132, L7129, and L71383; limited alterations to existing stone walls including the creation or widening of access openings and reinstatement works; security fencing; CCTV; drainage infrastructure; landscaping and biodiversity enhancement measures; Horizontal Directional Drilling beneath the disused railway line; temporary construction compounds; and all associated ancillary site development works. The proposed development will be operational for 40 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Townlands of Lissaniska Oakwood South Cahernaglass Ryehill Demesne Carrowmore Parkacurry Killaclogher Ballynaboorkagh Cashlaundarragh Corrafaireen Shantallow Carrowreagh East Caherlissakill and Laragh Beg , County Galway , IrelandGalway County Council
7 Aug 2026
2660248N/A

the construction of a Padel tennis court including steel framed mono-pitched roof structure to include solar panels & lighting, all with associated & ancillary site works

Carrigduff , Bunclody , Co. WexfordCarlow County Council
6 Aug 2026
FW26A/0308E/R3Referral

a 10 Year Planning Permission for a solar farm and energy storage comp

in the townlands of Shallon,, Broghan and Bishopswood,, County Dublin.Fingal County Council
6 Aug 2026
26111N/A

knock 5 no. existing farmyard cottages and build 5 no. new cottages (4 no. single storey and 1 no. 1 and half storey to match existing footprints; intended use short-term tourist accommodation) and for all associated site works including alterations and improvements to existing site entrance from public road, upgrade existing septic tank and percolation area, install roof-mounted PV solar panels to 1 no. cottage and existing slatted shed (original permission ref 201355)

Tinakilly , Ahenny , Carrick-on-SuirTipperary County Council
6 Aug 2026
2660586N/A

The development will consist of demolition of existing supermarket with ancillary off-licence (1711sqm) and construction of a new supermarket with ancillary off-licence (2571.8sqm) and reconfiguration of car parking to include 77no. car parking spaces (in lieu of 126no. existing car parking spaces) with access from existing vehicular access from R675, standalone ESB substation (25.8sqm), new plaza with pedestrian access from R675, hard and soft landscaping, service / delivery area, plant compound, bicycle parking, trolley bays, totem sign, building mounted signage, PV solar panels and all associated site and development works

Tramore Rd , Priorsknock , WaterfordWaterford City and County Council
6 Aug 2026
26183N/A

the installation of a 20kW ground mounted solar photovoltaic array with grid connection and associated works. Clonagh House is a Protected Structure (RPS Ref. No. 258). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Clonagh House , Reens , Ardagh Co. Limerick.Limerick County Council
6 Aug 2026

Looking for more? Search the full register for “solar and filter by county.