Wind Farm Planning Applications in Ireland
All 31 local authorities · past 3 years
Planning applications for wind farms and wind turbines across all 31 local authorities. Larger wind farms are often decided directly by An Coimisiún Pleanála as strategic infrastructure, but turbine applications, repowering, and grid works appear on the council register.
162
Applications (3 years)
59
Granted
21
Refused
82
Pending / Other
The 162 most recent wind energy applications. Click a marker to open the application record.
Track wind energy applications
Keyword alerts across all 31 local authorities, emailed the week applications are lodged.
Get notified at launchLatest Wind Energy Applications
Matched where the development description mentions wind turbine, wind farm, windfarm. Every application links to its full record (address, decision dates, and council file), free.
RED III Level 1- extension of the operational life of the existing Cronelea wind farm and associated infrastructure (as permitted pursuant to Wicklow County Council Planning Register Reference 01/4805) for a further period of 20 years from the date of the expiry of its current operational duration, no changes are proposed to the number or dimensions of the existing permitted wind turbines, the existing wind farm comprises: (i) four (4) wind turbines; (ii) associated turbine foundations and crane hard standings; (iii) 1.7 kilometres of on-site access tracks; and (iv) underground electrical and communications cabling, the development provides for the installation of an aviation warning light on turbines T2, T3 and T4, this planning application is accompanied by an Environmental Impact Assessment Report and an Appropriate Assessment Screening which include an assessment of the likely significant effects of the proposed development; both individually and in combination with the relevant off-site or secondary developments which will occur as a direct result of the development, including the development’s existing grid connection infrastructure which comprises an electrical substation and approximately 14km of 20kV underground electricity line located within the townlands of Cronelea, Ballymarroge, Laragh, Kilquiggin, Quigginroe, Killabeg, Coolkenna, Lumcloon, Killinure, Rath East, Rath, and Knockloe, County Wicklow; and Ballyvangour and Tullowphelim, County Carlow
RED III Level 1- extension of the operational life of the existing Cronelea Wind Farm and associated infrastructure (as permitted pursuant to Wicklow County Council Planning Register Reference 01/4805) for a further period of 20 years from the date of the expiry of its current operational duration. No changes are proposed to the number or dimensions of the existing permitted wind turbines. The existing wind farm comprises: (i) four (4) wind turbines; (ii) associated turbine foundations and crane hardstandings; (iii) 1.7 kilometres of on-site access tracks; and (iv) underground electrical and communications cabling. The development provides for the installation of an aviation warning light on turbines T2, T3 and T4. This planning application is accompanied by an Environmental Impact Assessment Report and an Appropriate Assessment Screening which include an assessment of the likely significant effects of the proposed development; both individually and in combination with the relevant off-site or secondary developments which will occur as a direct result of the development, including the development’s existing grid connection infrastructure which comprises an electrical substation and approximately 14km of 20kV underground electricity line located within the townlands of Cronelea, Ballymarroge, Laragh, Kilquiggin, Quigginroe, Killabeg, Coolkenna, Lumcloon, Killinure, Rath East, Rath, and Knockloe, County Wicklow; and Ballyvangour and Tullowphelim, County Carlow
The development will consist of: · Works at 20 No. locations along the Turbine Delivery Route (TDR) to facilitate abnormal loads for the delivery of turbine components to the Gortloughra Wind Farm. The works will consist of the creation of the overrun areas into third party lands at various locations. These works can be reinstated on completion of the turbine deliveries or left in-situ with the agreement of the landowners and Cork County Council. The parapets of 2 no. bridges on the L8544 and the L4607 will need to be temporarily lowered to allow abnormal vehicles to cross those bridges. · Temporary works at 2 No. locations on the R585 where blade handover locations will be developed to allow the transfer of turbine blades to and from a blade lifter trailer to facilitate the transport of oversize turbine blades through the village of Crookstown. Works will involve the creation of 2 site entrances at each location for access and egress purposes and the laying of hardcore material to allow vehicles to enter the sites and transfer blades between trailers. A 10 year permission and a 2 year operational period from the construction of the works is being sought.
to extend wind turbine test site to rear of factory premises to include; 1) 11 No 20-30Kw wind turbines 31m height to tip of propeller. 2) All other ancillary site works. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
for; (1) Amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641, 24/61485, 25/60575 and 25/61825) comprising repositioning of cooling equipment and provision of 1 no. container within the synchronous condenser compound, a revised footprint of the 110kV electrical compound, revision of the 110kV underground cabling route to Knockranny substation and provision of a new access road and widening of the existing road to accommodate the revised underground electrical cabling. (2) Amendment to the Knockranny Wind Farm grid connection (permitted under An Coimisiún Pleanála Reference No. PL07.318723), comprising revised underground electrical (33kV) and communications cabling route to connect to the 110kV electrical compound. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Beidh an fhorbairt bheartaithe comhdhéanta de: (1) Leasuithe ar an gComhdhlúthadóir Sioncronach Ardderroo ceadaithe (Uimhreacha Tagartha Chomhairle Chontae na Gaillimhe 23/60641, 24/61485, 25/60575 agus 25/61825) lena n-áirítear athshuíomh trealaimh fhuaraithe agus soláthar de 1 uimh. coimeádáin laistigh de chomhdhúil an chomhdhlúthadóra shioncronach, lorg athbhreithnithe do chomhdhúil leictreach 110kV, athbhreithniú ar an mbealach cáblaithe 110kV faoi thalamh go dtí fostáisiún Knockranny agus soláthar bóthair rochtana nua agus leathnú an bhóthair reatha chun freastal ar an gcábla leictreach faoi thalamh athbhreithnithe. (2) Leasú ar nasc eangach Feirm Gaoithe Knockranny (ceadaithe faoi Uimhir Thagartha An Coimisiún Pleanála PL07.318723), lena n-áirítear bealach athbhreithnithe do chábla leictreach (33kV) agus cumarsáide faoi thalamh chun nascadh leis an gcomhdhúil leictreach 110kV. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt bheartaithe
We, Inchamore Wind Designated Activity Company, intend to apply for permission for development of this site at the townlands of Inchamore (na hInse Móire), Milleeny (na Millíní) and Derreenaling (an Doirín Álainn), in Co. Cork. The development will consist of an amendment to Condition No. 6 of Planning Permission Pl. Ref. 23/5145, ACP. Ref. PL04.319216 for Inchamore Wind Farm. Permission is being sought to amend Condition No. 6 by removal of the following part of the condition which states ‘The wind farm shall not give rise to amplitude modulation, tonal or impulsive noise at noise sensitive locations’.
VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP HEIGHT OF 126.5M, ALL ANCILLARY DEVELOPMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS. THE PERMITTED DEVELOPMENT INCLUDES ACCESS OFF SEEGRONAN ROAD, KILLETER, CASTLEDERG, CO. TYRONE AND NO ALTERATION IS PROPOSED TO THE NATURE, SCALE OR DESIGN OF THE PERMITTED DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
For the extension of the operational duration of the existing Kilgarvan Phase II Wind Farm and associated infrastructure (as permitted in Kerry County Council Planning Refs. 07/1605, 07/4364, 03/2508 [ABP Ref: 08.209629], 07/4515, 07/4701) for an additional 15 years from the date of expiry of its current operational duration. The existing renewable energy development comprises: (i) 13 no. existing and operational wind turbines, with a tip height of 125 m and hub height of 80m; (ii) Associated turbine foundations and crane hardstandings; (iii) 8.34 km of existing access tracks; and (iv) Existing, operational site drainage infrastructure and associated infrastructure
RED III: The erection of 4 no Vestas V47 wind turbines (45.00m tower height, 69.85m tip height), the construction of 4 no 23.00 sq m electrical sub-stations / control buildings, the construction of 1 no. 70.00 sq. m storage building, site access tracks, hard standing areas, and associated ancillary works. The development is covered by the provision of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provision of article 26A of the Planning and Development Regulation 2001 to 2025 shall apply.
RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from the consented Ballymanus Wind Farm (Reg. Ref. 17/814) to connect the wind farm to the national grid at the existing Arklow 220kV ESB Station, County Wicklow, the proposed grid connection will be installed within existing private tracks and public roadway and include, provision of joint bays, draw pits, communication chambers, three phase electrical cables, optical fibre cables and cable sheath sectionalising chambers, water and rail crossings by (i) bridge crossings, (ii) horizontal directional drilling and iii) guided auger bore, limited ancillary forestry felling to facilitate construction and operation of the proposed development, reinstatement of land, road and track surface above the proposed cabling trench, all associated ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended, When a notice issues in accordence with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
The proposed development will be located in the townland of Dooleeg More, Co. Mayo. The development will be a “community led project” and will comprise a single electricity generating wind turbine with an overall height of 180m. The development will also consist of a turbine hardstand, access track of c.630m, an internal cable of c. 687m and a 20kV substation.
The proposed development will be located in the townland of Dooleeg More, Co. Mayo. The development will be a “community led project” and will comprise a single electricity generating wind turbine with an overall height of 180m. The development will also consist of a turbine hardstand, access track of c.630m, an internal cable of c. 687m and a 20kV substation.
A PERIOD OF 10 YEARS FOR PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION
PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS AND SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Sligo is 0.49 Hectares (Ha). The proposed development within the Sligo County bounds comprises both temporary and permanent works located in the townlands of Carrownacreevy, Tanrego West, Abbeytown, Corhawnagh and Carricknagat. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 1No. location. • Temporary removal of one traffic signal, three road signs, one bollard, one pole, a bridge railing, pedestrian guardrail and wall.at 1 No. location • Temporary removal of a wall, fence, poles and vegetation at 1No. location. • Construction of a permanent slip road linking the N4 and R290 at Carricknagat. • Removal of rock outcrop at Carricknagat including trees and vegetation clearance. Laying of a load bearing surface including associated drainage and reinstatement works. • Installation of temporary construction compound at Carricknagat to include site offices, welfare facilities and car parking. • Reinstatement of all temporary works areas to previous condition. • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications will be made to both Donegal and Mayo County Councils in respect of works required at locations within each county bounds. Minor, temporary works in Donegal are proposed at Killybegs, Glebe, Aghayeevoge, Cashelreagh Glebe, Bruckless, Aighan, Bruckless and Darney. Minor, temporary works in Mayo are proposed at Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. Permanent works are proposed at Crossmolina. An Appropriate Assessment Screening Report (AASR
REDIII - the development consists of the following elements: 1. Replacement of an existing small wind turbine (planning approval 91/001334) with a new small wind turbine. The existing turbine has a power output of 18.5 kW and is 25m tall from ground to rotor tip, and has a swept area of 95 sq. meters. This wind turbine will be removed and replaced with a new small wind turbine with a power output of 30 kW which is 31m tall from ground to rotor tip and has a swept area of 156 sq. meters. 2. A new reinforced concrete foundation, 1m deep and 7m in diameter. 3. An electrical hut, 1.8m square, and 2.2m tall at the base of the new wind turbine. The new turbine will utilise existing cabling & ducting from this electrical hut to provide renewable power to Sonairte. 4. Upgrade of the car parking facilities at Sonairte with the installation of two wall mounted electric vehicle (EV) charging points. 5. All associated site works. Under the Renewable Energy Directive III this is considered a development of type “Renewable energy development with capacity of less than 150kW and repowering development”. See further detailed project proposal in cover letter and project proposal document.
a) New Single Storey Dwelling, Detached Garage and Sewage Treatement System b) Revision For Site Boundaries To Windfarm Permitted per Pl Reg 03/4740 & 08/2037
Sonairte the National Ecology Centre CLG intend to apply for permission for development at Ninch, Laytown, Co. Meath, A92 D9XH. The development consists of the following elements: 1. Replacement of an existing small wind turbine (planning approval 91/001334) with a new small wind turbine. The existing turbine has a power output of 18.5 kW and is 25m tall from ground to rotor tip, and has a swept area of 95 sq. meters. This wind turbine will be removed and replaced with a new small wind turbine with a power output of 30 kW which is 31m tall from ground to rotor tip and has a swept area of 156 sq. meters. 2. A new reinforced concrete foundation, 1m deep and 7m in diameter. 3. An electrical hut, 1.8m square, and 2.2m tall at the base of the new wind turbine. The new turbine will utilise existing cabling & ducting from this electrical hut to provide renewable power to Sonairte. 4. Upgrade of the car parking facilities at Sonairte with the installation of two wall mounted electric vehicle (EV) charging points. 5. All associated site works. Under the Renewable Energy Directive III this is considered a development of type “Renewable energy development with capacity of less than 150kW and repowering development”. See further detailed project proposal in cover letter and project proposal document.
The erection of 2 no. Vestas V52 850Kw Wind Turbines (49.00m tower hub height and 75.00M blade tip height). The construction of 1 no. 23.00 sq. m electrical sub-station / control building, the construction of a site access track and hardstanding area, and all associated ancillary works
Permission for :- 1) The demolition of an existing ruined 2-storey detached dwelling and associated outbuildings and structures, 2) The construction of a replacement dwelling, 3) The creation of a new vehicular entrance and access roadway from the L7302 local road, 4) The erection of 50 no. PV panels erected on ground mounted arrays and 5 no. micro wind turbines, 5) Site landscaping and surface water drainage works incorporating SuDS measures, 6) The provision of new wastewater treatment system, 7) All other ancillary and associated site development and boundary treatment works.
RED III Category 1 - extension of the operational life of the Ballycumber wind farm located in the townlands of Ballycumber North and Ballycumber South, County Wicklow. the development of which the operational life will be extended, consists of • 6 wind turbines with an overall tip height of 131m • anemometry mast • site access tracks • hard standing areas • electrical control building and compound • underground cabling.• ancillary works including drainage, the planning application is for an extension to the operational life of the Ballycumber Wind Farm for a further 15 years from 25 years as granted under An Coimisiún Pleanála reference PL27.241827 Wicklow County Council Pl. Ref. 13/8043 (which replaced the previous permission for a wind farm on the site granted under PL 27.236261, Wicklow County Council Pl. Ref. 09/704), to 40 year
RED III Development which will consist of the construction and operation of a renewable energy development comprising the following; - 4 No. wind turbines with a tip height of 160m, a hub height of 92m, a rotor diameter of 136m and all associated foundations. - A permanent meteorological mast with an overall height of 92m - Turbine and meteorological mast temporary and permanent hard-standing areas including crane hardstand areas; - Upgrade of an existing farm entrance and access track off the R498 regional road to the south of the site in the townland of Grenanstown, to serve as construction and operation access; - Upgrade and widening of existing internal tracks and provision of new permanent and temporary site access tracks and all associated site drainage; - 1 no. borrow pit and associated drainage infrastructure to be used as a source of stone material during construction; and as a permanent material storage area. - Construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing - A permanent 38kV on-site substation to include control building with electrical infrastructure, welfare facilities, car parking, security fencing and lighting, and all associated infrastructure, services, and site works. - All associated underground electrical and communications cabling connecting the turbines to the proposed on-site 38kV substation. - Underground grid connection between the onsite 38 kV substation and the existing Nenagh 110 kV substation comprising approximately 0.75km within the windfarm, 6.2km along the R498, and 1.1km along the L5136. - Biodiversity enhancement areas - All associated site works above and below ground, including site clearance, site drainage, security gates, fencing, permanent and temporary signage, landscaping and revegetation
for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. The Development consists of works within the curtilage of Ballytobin House, a protected structure, reference ‘C315’ as listed on the County Kilkenny Record of Protected Structures. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Replacement of the existing small wind turbine, which has been in place for 34 years (planning approval 91/001334) with a new small wind turbine of similar size and power output, together with upgraded car parking facilities to include the installation of two electric vehicle charging points; and all ancillary site works
Looking for more? Search the full register for “wind turbine” and filter by county.
Planning a wind energy project?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Embed these figures on your own site
<iframe src="https://www.permission.ie/embed/sectors/wind" width="100%" height="190" style="border:0;max-width:560px" title="Wind Energy planning applications in Ireland - Permission.ie" loading="lazy"></iframe>
<p style="font-size:12px">Data: <a href="https://www.permission.ie/sectors/wind">Wind Energy planning applications in Ireland - Permission.ie</a></p>Free to use with the attribution link. The widget updates itself daily.