The renewable energy development will consist of the construction of a wind turbine with a hub height of up to 100m, a rotor radius of up to 70m, and an overall height from existing ground level to tip of rotor of up to 170m, a temporary vehicular access adjacent to the site’s existing entrance, an internal access road, associated underground electrical cabling, and a single-storey extension to the site’s existing medium-voltage electrical building.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Oct 2026

  2. Decision due (upcoming)

    4 Jan 2027

Application Details

Location
DePuy Synthes, Ringaskiddy, County Cork, P43 ED82
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
30 October 2026Other applications received that week
Status
Awaiting Admin Validation
Decision
Pending
Decision Due
4 January 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

89m
13/6262CONDITIONAL29 Nov 2013

The construction of a security building at the existing entrance road security barrier and a car park with 202 spaces and associated site works for use ancillary to the existing manufacturing facility

Loughbeg Ringaskiddy

254m
20/4200CONDITIONAL6 Feb 2020

a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.

Loughbeg Ringaskiddy Co. Cork

255m
11/6527CONDITIONAL2 Dec 2011

Construction of a 222 sq metre single storey extension to the existing open roofed waste storage compound to the north west of the existing manufacturing facility permitted under Pl. Reg. No. 01/4145 increasing the total area for the compound to 422sq metres. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy .

255m
11/6483INCOMPLETED APPLICATION25 Nov 2011

Construction of a 222sq metre single storey extension to the existing open roofed waste storage compound to the north west (Planning Reg. No. 01/4145) of the existing manufacturing facility increasing the total area for the compound to 422 sq metres. The above facility is ancillary to the existing production and plant areas

Loughhbeg Ringaskiddy Co. Cork

272m
18/7056CONDITIONAL22 Nov 2018

Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.

Loughbeg Ringaskiddy Co. Cork

319m
23/4846CONDITIONAL28 Apr 2023

Construction of a new single storey building extension to the west side of existing administration/canteen building together with all associated site works. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence.

Loughbeg Ringaskiddy Co Cork

334m
17/7092CONDITIONAL28 Nov 2017

Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy Co. Cork

423m
10/4078INCOMPLETED APPLICATION20 Jan 2010

Retention of a 60metre high meteorological data collection mast at Loughbeg. The period of retention in relation to this application is 2 years

Loughbeg Industrial Estate Loughbeg Ringaskiddy

510m
22/5672CONDITIONAL15 Jul 2022

Planning permission for a weathered enclosure to existing external mechanical equipment and associated site works at the existing facility.

Loughbeg Ringaskiddy Co. Cork

649m
14/4476REFUSED7 Mar 2014

Change of use of building A from a light industrial use to a waste transfer station on a site of c. 2.086ha (c. 5.15 acres). The proposed development comprises drainage works including grit trap, full retention oil interceptor, fire water retention area, and rainwater harvesting tanks, new concrete slab, weighbridge, elevational alterations, external odour control unit with 20m high stack, vehicle parking, vehicle workshop and all site development works. The site is served by the existing access to Ringport Business Park from Loughbeg Road. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application.

Building A, Ringport Business Park Loughbeg Ringaskiddy, Co Cork

Affected by this application?

Open for submissions
11days left to make a submission

Observations close on Thursday 3 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?