Proposed Development

• Install approximately 1.7km of underground electrical cabling (33kV), together with all associated infrastructure and ancillary works. • 38kV Substation and associated compound including a single storey control building (5.2m height and 195sqm) and all associated electrical infrastructure and apparatus, including new and upgraded site entrance and access road and associated ancillary site development works. • Installation of approximately 390m of underground electrical cabling (38kV) from the proposed substation, creating a loop-in connection to the existing 38kV underground electricity network, together with all associated infrastructure and ancillary works. • Junction accommodation works along the turbine delivery route, including temporary overrun areas, and associated works. A concurrent planning application is being made to Carlow County Council for the following elements within the administrative boundary of Carlow County Council: • Installation of approximately 5.7km of underground electrical cabling (33kV) together with all associated infrastructure and ancillary works. • Upgrading of approximately 3.1km of an existing forestry track. • New and revised onsite access track between T1 and T3. • Minor reorientation of the approved turbine hardstands to improve site functionality and layout. • Omission of the on-site substation. • Site drainage and tree felling. • All associated ancillary works. The proposed development forms part of works to facilitate the permitted Bilboa Wind Farm (Planning Ref: CCC Ref: 22/340 / ABP PL01.318295). Permission was previously granted by Laois County Council (Planning Ref: 20/281) and subsequently expired. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Oct 2026

  2. Decision due (upcoming)

    2 Jan 2027

Application Details

Location
Within the townlands of ROSSMORE CLOGRENAN , TOWLERTON and CLONBROCK , CO. LAOIS
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
9 ha

Timeline

Registration Date
30 October 2026Other applications received that week
Status
NEW APPLICATION
Decision
N/A
Decision Due
2 January 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

267m
2460153N/A21 Mar 2024

carry out amendments to the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works

Rossmore , n/a , Co. Laois

267m
2460170CONDITIONAL29 Mar 2024

Amend the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works.

Rossmore , n/a , Co. Laois

431m
2560124CONDITIONAL14 Mar 2025

construct a single storey dwelling, new entrance, wastewater treatment system and percolation area, bored well and all associated site works

Upper Rossmore , Co. Laois

433m
2660711N/A5 Oct 2026

construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance (granted under Planning Reference 24/60464) and all associated site works

Upper Rossmore , Co Laois , Co Laois

433m
2660745N/A13 Oct 2026

construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance and alterations to boundary location granted under Planning Reference 24/60464 and all associated site works.

Upper Rossmore , Co Laois , Co Laois

433m
2660704N/A1 Oct 2026

construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance (granted under Planning Reference 24/60464) and all associated site works

Upper Rossmore , Co Laois , Co Laois

501m
2460446N/A26 Jul 2024

Construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works.

Upper Rossmore , Co. Laois , Co. Laois

501m
2460464CONDITIONAL9 Aug 2024

construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works

Upper Rossmore , Co. Laois

501m
2460231N/A9 Aug 2024

to construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works

Upper Rossmore , Co. Laois

660m
2629REFUSED7 May 2026

extend duration of PL 20/478 in regards the construct a storey and a half type dwelling, domestic garage

Rossmore , Killeshin , Co Laois

Affected by this application?

Open for submissions
11days left to make a submission

Observations close on Thursday 3 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?