Solar farmsDecisionCarlow
Carlow County Council grants permission for 6.1-hectare solar farm at Chapelstown Staplestown and Ballinacarrig, Co. Carlow
12 December 2024 · Permission.ie Planning Wire · from the Carlow County Council planning register · published 1 September 2026
Carlow County Council granted permission on 12 December 2024 for a 6.1-hectare solar farm at Chapelstown Staplestown and Ballinacarrig, an application first lodged on 18 October 2024.
Key facts
- Reference
- 2460332
- Planning authority
- Carlow County Council
- Location
- Tinryland Wastewater Treatment Plant along the Nurney Road L1023 and N80 and Carlow Town Ballinacarrig, within the townlands of Tinryland Kilmeany, Chapelstown Staplestown and Ballinacarrig
- Received
- 18 October 2024
- Application type
- PERMISSION
- Site area
- 6.1 hectares
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision date
- 12 December 2024
In context
It is one of 2 solar farm applications Carlow County Council has received in the past twelve months, against 333 nationally. Of the 572 such applications decided by councils in the past three years, 92% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 12 December 2024. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Carlow County Council register. This is the source for every figure in the story above.
the demolition of all existing structures within the Tinryland Wastewater Treatment Plant and the construction on an extended site (0.09 ha in total) which will consist of a new pumping station (17m2), new below-ground storm tank (total storage of 123m³), replacement welfare facility (33m2), ground-mounted photovoltaic array (83 m2), new palisade perimeter fencing (2.4m high) and associated works; the construction of a new rising main and gravity main (3.7km in length) along the Nurney Road, L1023 and N80, connecting to the existing wastewater sewer at Ballinacarrig; and all ancillary and associated temporary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Carlow County Council grants permission for 6.1-hectare solar farm at Chapelstown Staplestown and Ballinacarrig, Co. Carlow", 12 December 2024. https://www.permission.ie/news/carlow-county-council/2460332
<p>Source: <a href="https://www.permission.ie/news/carlow-county-council/2460332">Carlow County Council grants permission for 6.1-hectare solar farm at Chapelstown Staplestown and Ballinacarrig, Co. Carlow</a>, Permission.ie analysis of the national planning register, 12 December 2024.</p>
Map, site boundary, timeline and nearby applications for 2460332.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Carlow the week it appears.
Set up alerts